CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Herefordshire Council
Planning and Regulatory Committee, Wednesday 7 December 2016 at 10.00am

151983 - ROGERS FARM, BUSH BANK, HEREFORD, HR4 8EP

Refused Planning 1 paper

Planning and Regulatory Committee refused this item on Wednesday 7 December 2016. Below is the council's own wording, with the papers it was decided on.

Item85

Resolved

The application was refused contrary to the Case Officer’s recommendation.
Word for word from the decision Herefordshire published for this meeting. Source: councillors.herefordshire.gov.uk

Follow this further

Built from Herefordshire's papers

What the report saysPro

Report to Planning and Regulatory Committee

MEETING: PLANNING COMMITTEE

DATE: 7 DECEMBER 2016 TITLE OF 151983 - PROPOSED ERECTION OF TWO POULTRY REPORT: BUILDINGS, NEW ACCESS AND CONVERSION OF BUILDING TO HOUSE BIOMASS BOILER AT ROGERS FARM, BUSH BANK, HEREFORD, HR4 8EP

For: G T Williams per [name removed], Newchurch Farm, Kinnersley, Hereford, Herefordshire HR3 6QQ https://www.herefordshire.gov.uk/planning-and-building-control/development-control/planning-applications/details?id=151983&search=151983 WEBSITE LINK: Reason Application submitted to Committee - Redirection

Date Received: 6 July 2015 Ward: Weobley Grid Ref: 344947,252366 Expiry Date: 8th December 2016 Local Member: Councillor MJK Cooper

1. Site Description and Proposal

1.1Planning permission is sought for the erection of 2 no. broiler units, new access with 250 metre track and conversion of existing farm building to house a biomass boiler at Rogers Farm, Knapton. The farm extends to approximately 44.70 acres (18.09 hectares) located to the east of the A4110 at the southern end of the hamlet of Knapton.

1.2The proposed poultry houses would be situated in what is presently an arable field immediately to the south east of the existing farm buildings and would accommodate approximately 82,500 birds (combined). Access to the site will be gained via a new proposed farm track off the A4110 public highway. The site slopes down from the north-east and it is intended to cut the buildings into the slope so that level access can be provided.

1.3The chicks will be brought in at one day old, as a 50:50 mix of males and females. There will be a maximum of 41,250 chicks in each building, generating a total stocking number of 82,500. The chicks will be brought in from a hatchery with the average crop cycle being 33 - 37 days plus the clean-out period. At the end of the growing period the birds will be collected and transported to a processing plant. The sheds would then be empty for a period of around 10 days during which a full clean-out will take place. There will be on average around 7 - 8 crop cycles per year although this could be slightly less if the turn-around period is longer.

1.4Before the chicks arrive the bedding is put in the buildings, which consists of wood shavings to a depth of around 2cm. The houses are warmed to a temperature of around 34ºC. The buildings will be heated using the biomass boilers. The temperature is reduced as the birds grow older and the ventilation rate conversely increases. The feed will be supplied by the processing company. It will be mixed according to the birds requirements at each stage of growth and fed

Further information on the subject of this report is available from [name removed] on 01432 260479 PF2 ad lib. The protein and phosphorous levels are reduced as the birds get larger. The water will be supplied by nipple drinkers which offer water on demand but minimise spillage.

1.5The poultry buildings will each measure 97.5m x 18.3m with a height to the eaves of 2.5m and 5.25m at the ridge. Each building will include a control room, with the northern building including a staff/office room and the southern building including a chemical store.

1.6The buildings will be insulated with fibre glass insulation to the walls and roofs to a U value of <0.4 W/m2 ºC. This will eliminate condensation on the inner lining of the buildings and minimise any solar heat gain. The buildings will be ventilated by a computer controlled mechanical system.

1.7The ventilation will be of a ‘conventional’ design with roof mounted variable speed fans and air drawn in at the sides of the building. The fans will operate at a variable rate dependent upon the age of the birds. There will also be 4 emergency fans built into an end wall of each building. It is stated that for the majority of the year the roof fans will provide adequate ventilation and the gable fans will only be needed in very hot weather.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
151983: ROGERS FARM, BUSH BANK, HEREFORD, HR4 8EPReport 574 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

19 of 27 attended
BB
Councillor BA BakerMember, present
KB
Kevin BishopOfficer, expected
SB
Councillor Sebastian BowenMember, in attendance
TB
Tim BrownSecretary, expected
CB
Councillor CR ButlerMember, present
MC
Councillor MJK CooperMember, in attendance
PC
Councillor PGH CutterChairperson, present
BD
Councillor Barry DurkinMember, in attendance
PE
Councillor PJ EdwardsMember, present
DG
Councillor DW GreenowMember, present
KG
Councillor KS GuthrieMember, apologies, sent representative
JH
Councillor J HardwickVice-Chairperson, present

All 27 on the meeting page

More from Herefordshire Planning and Regulatory Committee

All decisions
MeetingDecisionOutcome
14 Oct 2026 260943 - land southeast of woonton farm, woonton, almeley, herefordApplication approved in accordance with the case officer’s recommendation and a change to the conditions. Approved Open
14 Oct 2026 253316/253317 - 123 the homend, ledbury, herefordshire, hr8 1bpApplication approved, contrary to the case officer’s recommendation. Approved Open
9 Sep 2026 251908/251909 - land at town well station road, credenhill, herefordshire, hr4 7dwApplication approved in accordance with the case officer’s recommendation. Approved Open
9 Sep 2026 261671 - town well, station road, credenhill, hereford, herefordshire, hr4 7dwApplication approved in accordance with the case officer’s recommendation. Approved Open
9 Sep 2026 260149 - land south east of greyhound close, longtown, hereford, herefordshireApplication approved in accordance with the case officer’s recommendation. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies