That approval be granted, subject to: a. A Deed of variation to the existing section 106 agreement attached to planning consent HPK/2015/0571 to reference the new consent; b. Repetition of the same conditions attached to outline consent HPK/2015/0571 and compliance with any conditions agreed by a discharge of condition application; c. Amendment to conditions 21, 44 and 45 of planning consent HPK/2015/0571 to reference the amended plans and wording 2. That in the event of any changes being needed to the wording of the committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 19th March 2018
Application HPK/2017/0518 No: Location Woods Mill, Milltown, Glossop Proposal Variation of conditions 21, 44 and 45 of HPK/2015/0571 Applicant M M Ryan, Glossop Land Limited Agent [name removed], Plan A (North West) Limited Parish/ward Howard Town Date registered 15th September 2017 If you have a question about this report please contact: Jane Colley, [email protected] Tel: 01298 28400 ext. 4981
REFERRAL
This application has been brought before the Development Control Committee as it involves a variation to a number of planning conditions imposed on a major development.
1. SUMMARY OF RECOMMENDATION
Approve, subject to the completion of a Deed of Variation to the completed Section 106 agreement and amended conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site covers 2.4 hectares and spans Glossop Brook, stretching between the existing Howard Town Mill development and Milltown. The eastern part of the site was formerly dominated by Woods Mill, a substantial multi-storey traditional mill building, which has been demolished pursuant to planning application HPK/2015/0442. The western part of the site comprises a number of retail and commercial properties, under used land and derelict buildings. The land to the south of the Brook was formerly a scrap yard.
2.2Planning consent was granted, ref HPK/2015/0571 in July 2016 for a new supermarket, the refurbishment of the existing retails units to the western section of the site and 57 dwellings. Works have commenced at the site in respect of the dwellings.
2.3The site currently takes access from a number of different points. The retail units at the western end of the site take access from Victoria Street through Howard Town Mills; the commercial properties within the middle of the site are accessed from Mill Street and there is an additional vehicular access into Woods Mill from Milltown. There are no Public Rights of Way through the site.
2.4The site lies within an area of mixed retail, commercial and residential use at the heart of Glossop. The whole of the site falls within Howard’s Town Mill Conservation Area whilst the western part of it also lies within Glossop town centre boundary.
2.5The site lies within Flood Zones 1, 2 and 3.
3. DESCRIPTION OF THE PROPOSAL
3.1This application seeks consent to vary three planning conditions imposed under HPK/2015/0571 relating to the timing of the construction of the estate roads serving the residential element of the scheme (condition 21), the approved plans (condition 44) and the timing for the submission of public realm facilities (condition 45). The full wording of the conditions and the changes proposed are as follows:
3.2Approved condition 21 relates to the timing of when the estates roads are to be constructed and states:
21. The carriageways of the proposed estate roads serving the residential development shall be constructed in accordance with Condition 20, up to and including at least road base level, prior to the commencement of the erection of any dwelling intended to take access from the roads. The carriageways, footways and footpaths in front of each dwelling shall be completed with final surface course within twelve months from the first occupation of the dwellings unless otherwise agreed in writing by the Local Planning Authority.
Reason: In the interests of highway safety, in accordance with Policy CF6 of the High Peak Local Plan 2016.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.