That planning permission be approved as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager - Development Services be delegated authority to do so in consultation with the Chair of the Development Control Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 8th April 2019
Application HPK/2018/0187 No: Location 9 The Coppice, Whaley Bridge Proposal Retrospective application for garden engineering works and raised levels Applicant [name removed] Jim Mundy, Richard Mundy Building Design Parish/ward Whaley Bridge Ward Date registered 18/04/2018 If you have a question about this report please contact: Mark Ollerenshaw - Email [email protected]; Tel: 01538 395400 Ext: 4921
REFERRAL
The application has been referred to the Committee at the request of Councillor Lomax and Councillor Thrane to consider whether this retrospective proposal is in- keeping with the area.
1. SUMMARY OF RECOMMENDATION
Approve, subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site relates to a residential property, No. 9 The Coppice, and more specifically to the garden land to the rear of the property, which lies adjacent to Randall Carr Brook, an Environment Agency ‘Main River’. The site and wider area is covered by a Tree Preservation Order (Elnor Lane, Whaley Bridge). There are residential properties on either side of the site on the south side of the brook whilst land on the north side of the brook rises up to the railway embankment.
2.2The site is within the built up area boundary of Whaley Bridge. The site lies within Flood Zones 2 and 3.
3. DESCRIPTION OF THE PROPOSAL
3.1The application is for the retention of engineering works comprising raised garden level and erection of a concrete panel retaining wall with railings adjacent to the brook. 3.2 The applicant states that the previous boundary wall between the brook and their garden had collapsed and was dangerous. In addition it is stated that the garden incline was so steep it was dangerous for a family home. The applicant undertook to replace the wall on the original site of the dry stone wall but after discussions with local builders, it was suggested that a more substantial wall was required. The submitted section drawing indicates that the retaining wall excluding the railings is approx. 2m high when measured from the level of the adjacent brook.
3.3It is also apparent that two mature trees adjacent to the river bank and the subject of the Tree Preservation Order have been removed.
3.4The application and details attached to it - including the plans, supporting documents, representations and responses from consultees - can be found on the Council’s website at:-
S1 Sustainable Development Principles S1a Presumption in Favour of Sustainable Development S2 Settlement Hierarchy S6 Central Sub-area Strategy EQ1 Climate Change EQ5 Biodiversity EQ6 Design and Place Making EQ9 Trees, Woodlands and Hedgerows EQ10 Pollution Control and Unstable Land EQ11 Flood Risk Management
Supplementary Planning Documents
High Peak Design Guide 2018 Residential Design Landscape Character
National Planning Policy Framework (July 2018)
National Planning Practice Guidance
6. CONSULTATIONS
Site notice Expiry date for comments: 05/06/2018 Press notice Expiry date for comments: N/A Neighbours Expiry date for comments: 09/05/2018
Neighbours
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.