HPK/2019/0097 Rockhead Spring Pump Building, Bakewell Road, Buxton - Installation of a pipe from Rockhead Spring Pump House to Waterswallows Lane

Deferred Planning 1 paper

Development Control Committee deferred this item on Monday 15 July 2019. Below is the council's own wording, with the papers it was decided on.

Item20/14

Resolved

That the application be deferred in order to obtain further comments from Natural England in respect of the Applicant’s Assessment of Likely Significant Effects.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 15th July 2019

Application HPK/2019/0097 No: Location Rockhead Spring Pump Building, Bakewell Road, Buxton Proposal Installation of a pipe from Rockhead Spring Pump House to Waterswallows Lane along a route that includes Bakewwell Road, Redgap Lane, Daiseymere Lane and Waterswallows Lane. Applicant [name removed], Nestle Waters Agent [name removed], Cass Associates Parish/ward King Sterndale / Cote Date registered 21st March Heath 2019 If you have a question about this report please contact: Ben Haywood email: [email protected] Tel: 01538 395400 Ext: 4924

REFERRAL

The application has been referred to the Committee as it is a major development

1. SUMMARY OF RECOMMENDATION

Approve, subject to conditions

2. DESCRIPTION OF THE PROPOSAL

2.1Nestlé Waters UK bottles mineral and spring water at its bottling plant facility on Waterswallows Lane, Buxton. To supply growing customer demand, Nestlé Waters has acquired the Rockhead Spring along the A6 (Bakewell road) approx 2 miles to the SE of Buxton Town centre. The source is approximately 4km from the bottling plant and a new pipeline is required between the source and the plant to transport the water between the two locations.

2.2The works effectively consist of a single trench, 600m wide and 1.2m deep for the entire 4km. It is anticipated that trench-work will be via 4-man gang using 6-13T excavator or trenching machine.. Once excavated pipework will be placed within the trench, with site welds applied every 18m. The apparatus to be installed within, is summarized as follows;-

 2 Off DN65 316L stainless steel production pipes, wrapped spirally bin Densoclad.  2 Off 150mm Cable ducts.  The apparatus will be laid at a cover of 900mm with a 100mm sand bed and surround.  The backfill material above the sand and warning tape will vary dependent on whether the trench is within (a) highway or (b) farm land/verge.  All trench re-instatement will be carried out in accordance with the Specification for the reinstatement of openings in highways (3rd Edition)

3. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

3.1At present the Rockhead Source site comprises a small stone and slate building similar in size to a small detached garage, surrounded by a palisade fence which sits alongside the A6 road into Buxton. The site is well screened from the road by boundary trees and shrubs.

3.2Separate applications are also under consideration by the Council for monitoring boreholes at the site and a new pump building.

3.3The proposed pipeline would start from the Rockhead source and after leaving the Rockhead compound, the route will enter several different sections noted on the submitted plan with letters. In brief the sections involve;-

 A – B 400m section in the A6, under a Network Rail Viaduct, followed by a river crossing and a short run across a rough hardstanding area used by local plant yard and quarry wagons.  B- C 125m section through a Site of Scientific Interest (SSSI)  C-D 900m section across farmland, farmyard and tracks ending in a crossing of Redgap Lane.  D-E 900m section in wide verge parallel to Redgap Lane..  E-F 750m section in the narrower verge of Daisymere Lane.  F-G Crossing of Waterswallows Lane adjacent junction.  G-H Section in Nestlé owned land.

3.4The application and details attached to it - including the plans, supporting documents, representations and responses from consultees - can be found on the Council’s website at:-

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=2311 32

4. RELEVANT PLANNING HISTORY

4.1No relevant history.

5. PLANNING POLICIES RELEVANT TO THE DECISION

Adopted High Peak Local Plan 2016

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2019/0097 Rockhead Spring Pump Building, Bakewell Road, Buxton: Installation of a pipe from Rockhead Spring Pump House to Waterswallows LaneReport 518 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

15 of 24 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, apologies
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, apologies, sent representative
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
SY
Councillor Stewart YoungCommittee Member, present

All 24 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2019/0097 Rockhead Spring Pump Building, Bakewell Road, Buxton - Installation of a pipe from Rockhead Spring Pump House to Waterswallows LaneThis decision
  2. HPK/2019/0097 Rockhead Spring Pump Building, Bakewell Road, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open