CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 12 August 2019 at 1.30pm

Update Sheet

Noted Planning 1 paper

Development Control Committee noted this item on Monday 12 August 2019. Below is the council's own wording, with the papers it was decided on.

Item20/21

Resolved

That the update sheet be noted.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

12th August 2019

HPBC DEVELOPMENT CONTROL COMMITTEE

UPDATES SHEET

HPK/2017/0534 – Land off Hayfield Road, New Mills

DCC Education Officer Comments

The most up to date position regarding school capacity was been provided in the DCC letter dated 15/05/2019 in response to the re-consultation on HPK/2017/0534. This response still stands and is in accordance with the County Council’s Developer Contributions Protocol which was approved by Cabinet and provides the basis of any requests for contributions to mitigate the impact of the development.

It is noted that the applicant has provided a number of responses to counter DCC’s request for contributions towards the provision of primary places at the normal area primary school Thornsett Primary. The DCC response however remains in accordance with the approved protocol which provides a consistency of approach across the county.

DCC Highway Officer Comments

It is recommended that the proposed junction with Hayfield Road is formed using a 10m entry, as well as exit, radius. There are anomalies between the details (i.e. a 10m exit radius is shown on at least one of the drawings but not others), however, it’s suggested that this revision is unlikely to prove a material amendment in planning terms and may be resolved as a part of the detailed design at Constructional Approval stage.

It is noted that there are proposals to enhance/ improve crossing facilities for the Sett Valley Trail. Again, it’s suggested that the detailed design for this may be resolved at Constructional Approval stage and include for extending the 3.0m to the access to the Sett Valley Trail east of the site and improvements for crossing in the vicinity of Derby Road.

It is also noted that the local refuse collection service are satisfied with the proposals for their purposes. It’s comforting to note that collections for multiple dwellings will be made from points located remote from the highway and thereby reduce the likelihood of accumulations of waste bins obstructing the footway. However, whilst placing waste bins in the footway may be acceptable and convenient for the collection service, as stated previously, identifying the footway for this purpose still represents acceptance of obstructions being located within the proposed highway, a situation that should not be necessary in a new build estate and one the Highway Authority cannot condone. Again, it is recommended that the views of the local access group are sought with respect to this issue. The swept paths of Large Refuse Vehicle bodies pass over land beyond the rear of margin on the turning facilities of the two cul-de-sacs to the north of the proposed ‘spine road’. All areas required for manoeuvring should be within proposed highway and it’s recommended that a 400mm width margin is allowed to any potential constraints. It’s recommended that the layout is modified to suit.

The private driveway serving Plots 24 – 26 is poorly aligned with the proposed turning facility. The layout should be modified in order that the driveway is located at 90° to the rear of footway and not require vehicles to be driven for a considerable distance along the footway.

Trees located in advance of the forward visibility sightlines, i.e. that on the frontage of Plot 42, will require species to be approved at Constructional Approval stage and a commuted Sum secured for future maintenance. The tree fronting Plot 70 is beyond the proposed highway and should be conditioned to be of a species unlikely to obstruct the sightline with the crown height being maintained in future.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Update SheetReport 87 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 24 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, apologies
LD
Councillor Lance DowsonCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, apologies
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
SY
Councillor Stewart YoungCommittee Member, present

All 24 on the meeting page

On this subject at High Peak

Search all
  1. Update SheetThis decision
  2. Update SheetNoted
  3. Update SheetNoted
  4. Update SheetNoted
  5. Update SheetNoted
  6. Update SheetNoted

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies