High Peak Borough Council
Development Control Committee, Monday 7 October 2019 at 1.30pm

DOC/2017/0071 Land at Linglongs Road, Whaley Bridge

Agreed Planning 3 papers

Development Control Committee agreed this item on Monday 7 October 2019. Below is the council's own wording, with the papers it was decided on.

Item20/40

Resolved

That the relevant conditions imposed on HPK/2017/0694 as set out in the report be agreed; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary of add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Development Control Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

TECHNICAL NOTE ON DRAINAGE STRATEGY

LINGLONGS ROAD, WHALEY BRIDGE

The site is an existing grassed field, sloping steeply towards an ordinary unnamed watercourse that runs within the site. This watercourse in turn drains into the River Goyt, to the west of the site.

The site does NOT drain in any way to the nearby Toddbrook Reservoir. Toddbrook Reservoir discharges to the River Goyt, but only in significant storm events, and is downstream of the development site.

The site is in the Environment Agency’s lowest category of flood zone – Flood Zone 1 (there is no Flood Zone 0), and is therefore at low risk of flooding.

UK wide standards set out by DEFRA requires that all new developments discharge surface water at a rate no greater than it was pre‐development. To achieve this the peak run off rate is controlled via a flow control device and oversized surface water storage pipes under the highways.

The pre‐development surface water discharge rate is termed “Greenfield Run‐off Rate”, and is calculated using an industry standard method based upon the development area.

The GWP response dated 4th Sept 2019, claims that the “Greenfield Run‐off Rate” has been incorrectly calculated by using the entire site area to arrive at the “Greenfield Run‐off Rate”, suggesting this will provide an over estimate of the “Greenfield Run‐off Rate”. GWP suggest that the rate should be calculated using the smaller developed area.

The applicant believes that GWPs response is incorrect and misleading. The applicant has used the correct areas and the correct industry standard method of calculating the “Greenfield Run‐off Rate which is evidenced below.

The following is an extract from the uksuds.com website:

“The Greenfield runoff rate which is to be used for assessing the requirements for limiting discharge flow rates and attenuation storage for a site, should be calculated for the whole development area (paved and pervious surfaces ‐ houses, gardens, roads, and other open space) that is within the area served by the drainage network, whatever size of the site and type of drainage system” [HR Wallingford http://www.uksuds.com/FAQRetrieve.aspx?ID=54989]

HR Wallingford, are the UK’s leading specialist in Flood and Water Management, and contributing authors of the industry adopted standard publication ‘Ciria C753 The SUDS Manual’, which is the national governments adopted standard for design and implementation of SUDS.

The site area is 6.2Ha (as stated in the FRA Para 2.1) this includes large areas of POS and Trees. The large areas of POS and Trees have been excluded from the Greenfield Run‐off calculations as they are not “within the area served by the drainage network”.

The developed area used for calculating Greenfield Run‐off Rates is 4.42ha (see page 85 of the FRA). This includes “houses, gardens, roads, and other [small pieces of] open space”.

Greenfield run off rates have been calculated in the site specific Flood Risk Assessment (para 2.4 and evidenced on pg85 of the FRA), and have been summarised in Table 1.

Proposed post development discharge rates have been calculated and modelled using industry standard software and modelling methods. Final discharge rates are summarized in Table 1. Storm Frequency Pre‐development Proposed post‐ Difference % post Greenfield Run‐off development development. Rate. (Litres/second) Discharge Rate. (Litres/second) 1 in 1 year 24.8 L/s 24.1L/s ‐2.8% Qbar (aprx 1in 2.3 Year) 28.6 L/s 25.8L/s ‐9.8% 1 in 30 year 48.4L/s 32.2L/s ‐33.5% 1 in 100 year 59.4L/s 36.1L/s ‐39.2% 1 in 100 year + 40% 48.4L/s ‐18.5% (when compared to climate change 1in100 no climate change)

Table 1.

A 1 in 100 year storm is a severe rainfall event, that has the probability of occurring only once in 100 years. This can also be considered as having 1% probability of occurring in any year.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix /40Appendix 106 KB DownloadRead as text
PDF
/40Appendix 2 399 KB Download
PDF
DOC/2017/0071 Land at Linglongs Road, Whaley BridgeAddendum 185 KB Download

At this meeting

Whole meeting

Who was there

13 of 24 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
KS
Councillor Kath SizelandCommittee Member, present as substitute
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present

All 24 on the meeting page

On this subject at High Peak

Search all
  1. DOC/2017/0071 Land at Linglongs Road, Whaley BridgeThis decision
  2. DOC/2025/0028 - Land Adjacent Cellarhead Substation, Rownall Road, Wetley Rocks.Noted
  3. DOC/2019/0039 - Land at Thorley Drive, CheadleApproved
  4. DOC/2108/0110 Land off Linglongs Road, Whaley BridgeAgreed
  5. DOC/2017/0071 Land at Linglongs Road, Whaley Bridge - Discharge of conditions relating to HPK/2017/0694 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 16, 17, 18, 19, 21, 22, 24, 26, 27 and 28Deferred
  6. Staffordshire Moorlands Design Guide - Supplementary Planning DocumentNoted

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies