HPK/2021/0145 – Foxlow Farm Local Centre, Ashbourne Road, Buxton
County Highways (01.10.21):
“The Highway Authority noted that Nursery drop off spaces have been added on plan 1240-CPP Rev B. These are acceptable and we don’t have any issue on parking.
The Transport Assessment submitted in support of this application was thoroughly checked by my colleague in Transport Strategy including details of traffic generation (TRICS based), traffic distribution and traffic assignment and impact on the highway network. My colleague highlighted and may be this paragraph has importance in terms of traffic impact and capacity on the highway network, I am presenting for your information:
Bearing in mind the nature of the revised proposals, discount retail, I suspect that in terms of the incremental increases in traffic through the downstream junctions, a significant proportion of the development (retail) traffic will ‘already be on the network’, consequently, relatively little discount retail traffic would be ‘new’, and therefore, its impacts upon the wider network will only be marginal. On that basis, I am minded to agree with transport consultant’s conclusions.
Other highway related conditions / informative already advised in our Highway’s response”.
Applicant:
“The following provides further information in respect of your queries on the following matters:
Solar panels on proposed foodstore; The delivery of the small units; and, Nursery Garden area.
Solar panels on proposed foodstore As set out in our previous letter, the applicant has offered to deliver solar voltaic panels on the roof of the proposed Aldi store in order to generate green energy. Details of such proposals would typically be submitted and agreed through a relevant planning condition to allow for detailed design to be carried out and changes in technology/supplier between grant of planning permission and installation.
Nevertheless, it is expected that the number of panels, and type of panels, that could be delivered on the proposed foodstore would be similar to that provided at the Bakewell store, as a relatively recent example that has been delivered locally. A photograph of the Bakewell example, along with aerial imagery of the store, is provided at Figure 1 enclosed with the letter to give a better idea on the likely scale and appearance of such panels. In addition to this, we have enclosed a copy of manufacturers details of solar panels that have been used elsewhere by Aldi. Whilst the final type and scale of panels that would be delivered on the store is to be finalised following further input from Aldi’s supplier/contractor, hopefully this gives a better understanding of the type and amount of panels that could be provided on the store.
In terms of the likely energy generation of the solar voltaic panels; this would require a further, more detailed assessment given that such matters are entirely location specific (i.e. average daily amount of sunlight and roof orientation). In addition, such an assessment is not possible until the detailed design and supplier is confirmed. Such information would instead be provided through the submission and approval of a scheme through an appropriately worded condition.
Figure 1 – Aerial Image (above) Roof and Elevations (below) Aldi Bakewell Delivery of the small units
The following provides some further information regarding the delivery of the smaller units on the site in order provide officers and members further certainty regarding their delivery and end use as part of the proposed development.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Update SheetReport | 584 KB | DownloadRead as text |
Follow Development Control Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Aug 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. | Approved | Open |
| 10 Aug 2026 | Update SheetThat the update sheet be noted. | Noted | Open |
| 10 Aug 2026 | Planning ApplicationsThat the report be noted. | Noted | Open |
| 10 Aug 2026 | HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... | Approved | Open |
| 10 Aug 2026 | HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.