Resolved
RESOLVED – That the application be REFUSED for the reasons and based on the policies contained in the report. (Proposed by Councillor Davies and seconded by Councillor Ellis.)
Planning Applications Committee refused this item on Thursday 16 June 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – That the application be REFUSED for the reasons and based on the policies contained in the report. (Proposed by Councillor Davies and seconded by Councillor Ellis.)
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
16th June 2022
Application SMD/2021/0695 No: Location Land Adjacent Cellarhead Substation Rownall Road Wetley Rocks Staffordshire Proposal Erection of a Flexible Energy Facility Applicant C and S Energy Ltd Agent Surface Planning Parish/ward Date registered 3/11/2021 If you have a question about this report please contact: Jane Curley tel: 01538 395400 ex 4124 [email protected]
REFERRAL
This is a contentious major development in the Green Belt
1. SUMMARY OF RECOMMENDATION
REFUSE
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site consists of agricultural land amounting to approximately 9 hectares. It lies to the east of Cellarhead substation (albeit not adjacent to it) and to the west of Rownall Road to which the site has frontage. It is within the Green Belt. To the north, south and west the site adjoins agricultural land. The site is to be accessed via an existing gated agricultural access on Rownall Road. From here a new access track, 5m in width will be constructed leading to the site running parallel to the northern boundary. For the first 15m it will be of bound surface.
2.2The application site consists of three fields. The main compound is proposed to be sited in the most western field. Only part of the eastern field is required for the new access and planting but it is all included; the applicant says to allow for the construction compound, facilities and lay down areas which would be detailed in the Construction Management Plan and to provide flexibility on the final landscaping details. The southerly field is shown to be proposed wholly for mitigatory woodland planting.
2.3Although the total area of the application site is 9 hectares, the applicant says that the actual area of development (plant, machinery and access route) is 3.42 hectares.
2.4Public footpath 53 runs along the southern boundary of the site and part of the western boundary. Footpaths 42 and 43 head to the east down into the Churnet Valley 3. DESCRIPTION OF THE PROPOSAL
3.1This is a full application for a Battery storage facility. The proposed facility consists of 224 containers ( each of which consists of 10 battery cabinets 1550mm x 1050mm x 2280mm, drawing 302A) aligned in rows in a north- south direction with a 3m concrete fire wall in between each set
112 power stations including transformers each measuring 6058mm x 2433mm x 2896
2 Switch rooms which are raised from the ground on a series of ‘legs’ dimensions each of 20m by 3.5m by 4.13m in height to allow cabling and services to be run underneath
A substation, part of which is ‘open’ part fully enclosed. The section (Drawing 307B) show elements of this building to be approx. 9m high. The sections also show that the ground is to be excavated to depths of between 5-8 metres to house the substation. This is to ensure it is said that no part of the building is visible above the acoustic fencing
A DNO GRP cabinet will be located outside of the compound next to the gated access point. This is shown to be a metal cabinet of 5840mm x 3580mm x 3100mm
4-metre high acoustic fence enclosure around the entire site with one solid gate.
A new access track will run from the existing gated access point on Rownall Road for approximately 200 metres to the facility access gate. It will be 5m in width and will be surfaced in tarmac for the first 15m from the edge of the highway, thereafter geogrid or similar material
3.2The application documents (FRA) refer to the fact that the proposed finished development levels have yet to be finalised, however it says that they will generally reflect the prevailing topography, with some localised raising and lowering of levels to facilitate suitable workable plateaus for level access and servicing.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
SMD/2021/0695: Land adjacent to Cellarhead Substation, Rownall Road, Wetley RocksReport | 626 KB | DownloadRead as text |
Follow Planning Applications Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Jul 2026 | Minutes of the previous meetingThat the minutes of the previous meeting held on 21 May 2026, be approved as a correct record. | Approved | Open |
| 23 Jul 2026 | Late Representations Report (circulated prior to the meeting i.e. any representations received since this agenda was published).That the Late Representations report be noted. | Noted | Open |
| 23 Jul 2026 | SMD/2025/0305 - Land North of Calvin Court, KingsleyThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. In the even... | Refused | Open |
| 23 Jul 2026 | SMD/2026/0165 - Land to the South of Mill Lane, Wetley RocksThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. That in the... | Refused | Open |
| 23 Jul 2026 | SMD/2025/0380 - Land adjacent to High View, Sutherland Road, LongsdonThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. In the even... | Refused | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.