SMD/2022/0047 - Land adjacent to Cellarhead Substation, Rownall Road, Wetley Rocks

Refused Planning 1 paper

Planning Applications Committee refused this item on Thursday 16 June 2022. Below is the council's own wording, with the papers it was decided on.

Item339

Resolved

RESOLVED – That the application be REFUSED for the reasons and based on the policies contained in the report. (Proposed by Councillor Holmes and seconded by Councillor Emery.)
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Planning Applications Committee

STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE

16th June 2022

Application SMD/2022/0047 No: Location Land Adjacent Cellarhead Substation Rownall Road Wetley Rocks Staffordshire Proposal Erection and operation of a Battery Energy Storage System and associated infrastructure and equipment Applicant Sirius Renewable Energy Ltd Agent Sirius Renewable Planning Parish/ward Date registered 3/2/2022 If you have a question about this report please contact: Jane Curley tel: 01538 395400 ex 4124 [email protected]

REFERRAL

This is a contentious major development in the Green Belt

1. SUMMARY OF RECOMMENDATION

REFUSE

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The main site consists of two agricultural fields with a new access through a third field to the south. The site is said to be approximately 5.4 hectares. It lies immediately adjacent to the eastern boundary of the Cellarhead substation and to the west of Rownall Road. It is within the Green Belt.

2.2Two existing accesses are proposed to serve the site. The existing track from Rownall Road to the east (also line of Public footpath, Cheddleton 53) leading to the farmyard, buildings and fields is to be used once the site is operational by the DNO (District Network Operator) who will have access to the substation compound to the north eastern corner of the site. The existing substation access road to the south (also the route of Public Footpath 60) will be used during the construction phases and for routine maintenance checks once the site is operational. A new length of access track approx. 180m in length and 5m in width is proposed between the south east corner of the site and this existing access running in a straight line. Revised plans show this to be a gravelled surface.

2.3The site is bound to the north by partial hedging, trees and fencing, beyond which is a farm track (also a continuation of Public Footpath Cheddleton 53). To the north east is a collection of agricultural buildings. To the west the site is bound by hedging. Beyond this is a narrow strip of woodland through which Public footpath Cheddleton 47 runs and the Cellarhead substation. To the south and east the site adjoins agricultural land with hedging/fencing and trees forming the boundaries. 2.4 The site gently falls gently in a westerly direction towards the existing substation

2.5There are two high voltage overhead electricity pylons in the north western of the site.

3. DESCRIPTION OF THE PROPOSAL

3.1This is a full application for an Battery storage facility. The proposed facility consists of  112 battery container units – 12.15m x 2.43m x 2.89m (extends to 14.69m with air colling units added at either end)  112 invertors and 56 transformer  Perimeter fencing 2.4m high and inward facing infra-red CCTV  Acoustic fencing on the north, east and south boundaries 4m in height  Substation compound and associated cabins including a switchgear/meter room  2 spare storage cabins  Underground cabling  Internal access road

3.2The switch room and battery containers are to be painted in a dark green colour to help assimilate the development into the landscape.

3.3Construction is expected to take 9 months to complete. It is said that the site will connect into the point of connection located within the adjacent Cellarhead substation compound via underground cabling.

3.4An area of off-site land, 3.84 ha, to the south west of the application site in control of the applicant (edge blue on the application) is proposed for biodiversity gains. This will be planted with additional native hedgerows, trees and the grassland managed and improved to enhance its ecological value.

3.5The facility will provide 280 MVA to store and export to the local distribution network for up to 2 hours .

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
SMD/2022/0047: Land adjacent to Cellarhead Substation, Rownall Road, Wetley RocksReport 700 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

10 of 30 attended
JP
Justin Price-JonesCouncil Staff, in attendance
MD
Member Diary SMDCOfficer, expected
SE
Councillor Stephen EllisChair, present
PJ
Councillor Peter JacksonVice-Chair, apologies
BC
Councillor Bill CawleyCommittee Member, present
SC
Councillor Sue ColemanCommittee Member, present
JD
Councillor Jim DaviesCommittee Member, present
BE
Councillor Ben EmeryCommittee Member, present
KF
Councillor Keith FlunderCommittee Member, present
AH
Councillor Andrew HartCommittee Member, apologies
TH
Councillor Tony HolmesCommittee Member, present
KH
Councillor Keith HoptroffCommittee Member, present

All 30 on the meeting page

On this subject at High Peak

Search all
  1. SMD/2022/0047 - Land adjacent to Cellarhead Substation, Rownall Road, Wetley RocksThis decision
  2. SMD/2025/0305 - Land North of Calvin Court, KingsleyRefused
  3. SMD/2026/0165 - Land to the South of Mill Lane, Wetley RocksRefused
  4. SMD/2025/0380 - Land adjacent to High View, Sutherland Road, LongsdonRefused
  5. SMD/2026/0121 - The Heatherlands, Commonside, BoundaryApproved
  6. SMD/2025/0412 - Land at Daisy Bank Farm, Uttoxeter Road, Upper TeanNoted

More from High Peak Planning Applications Committee

All decisions
MeetingDecisionOutcome
23 Jul 2026 Minutes of the previous meetingThat the minutes of the previous meeting held on 21 May 2026, be approved as a correct record. Approved Open
23 Jul 2026 Late Representations Report (circulated prior to the meeting i.e. any representations received since this agenda was published).That the Late Representations report be noted. Noted Open
23 Jul 2026 SMD/2025/0305 - Land North of Calvin Court, KingsleyThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. In the even... Refused Open
23 Jul 2026 SMD/2026/0165 - Land to the South of Mill Lane, Wetley RocksThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. That in the... Refused Open
23 Jul 2026 SMD/2025/0380 - Land adjacent to High View, Sutherland Road, LongsdonThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. In the even... Refused Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies