RESOLVED – That the application be REFUSED for the reasons and based on the policies contained in the report. (Proposed by Councillor Holmes and seconded by Councillor Emery.)
Planning Applications Committee refused this item on Thursday 16 June 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – That the application be REFUSED for the reasons and based on the policies contained in the report. (Proposed by Councillor Holmes and seconded by Councillor Emery.)
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
16th June 2022
Application SMD/2022/0047 No: Location Land Adjacent Cellarhead Substation Rownall Road Wetley Rocks Staffordshire Proposal Erection and operation of a Battery Energy Storage System and associated infrastructure and equipment Applicant Sirius Renewable Energy Ltd Agent Sirius Renewable Planning Parish/ward Date registered 3/2/2022 If you have a question about this report please contact: Jane Curley tel: 01538 395400 ex 4124 [email protected]
REFERRAL
This is a contentious major development in the Green Belt
1. SUMMARY OF RECOMMENDATION
REFUSE
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The main site consists of two agricultural fields with a new access through a third field to the south. The site is said to be approximately 5.4 hectares. It lies immediately adjacent to the eastern boundary of the Cellarhead substation and to the west of Rownall Road. It is within the Green Belt.
2.2Two existing accesses are proposed to serve the site. The existing track from Rownall Road to the east (also line of Public footpath, Cheddleton 53) leading to the farmyard, buildings and fields is to be used once the site is operational by the DNO (District Network Operator) who will have access to the substation compound to the north eastern corner of the site. The existing substation access road to the south (also the route of Public Footpath 60) will be used during the construction phases and for routine maintenance checks once the site is operational. A new length of access track approx. 180m in length and 5m in width is proposed between the south east corner of the site and this existing access running in a straight line. Revised plans show this to be a gravelled surface.
2.3The site is bound to the north by partial hedging, trees and fencing, beyond which is a farm track (also a continuation of Public Footpath Cheddleton 53). To the north east is a collection of agricultural buildings. To the west the site is bound by hedging. Beyond this is a narrow strip of woodland through which Public footpath Cheddleton 47 runs and the Cellarhead substation. To the south and east the site adjoins agricultural land with hedging/fencing and trees forming the boundaries. 2.4 The site gently falls gently in a westerly direction towards the existing substation
2.5There are two high voltage overhead electricity pylons in the north western of the site.
3. DESCRIPTION OF THE PROPOSAL
3.1This is a full application for an Battery storage facility. The proposed facility consists of 112 battery container units – 12.15m x 2.43m x 2.89m (extends to 14.69m with air colling units added at either end) 112 invertors and 56 transformer Perimeter fencing 2.4m high and inward facing infra-red CCTV Acoustic fencing on the north, east and south boundaries 4m in height Substation compound and associated cabins including a switchgear/meter room 2 spare storage cabins Underground cabling Internal access road
3.2The switch room and battery containers are to be painted in a dark green colour to help assimilate the development into the landscape.
3.3Construction is expected to take 9 months to complete. It is said that the site will connect into the point of connection located within the adjacent Cellarhead substation compound via underground cabling.
3.4An area of off-site land, 3.84 ha, to the south west of the application site in control of the applicant (edge blue on the application) is proposed for biodiversity gains. This will be planted with additional native hedgerows, trees and the grassland managed and improved to enhance its ecological value.
3.5The facility will provide 280 MVA to store and export to the local distribution network for up to 2 hours .
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
SMD/2022/0047: Land adjacent to Cellarhead Substation, Rownall Road, Wetley RocksReport | 700 KB | DownloadRead as text |
Follow Planning Applications Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Jul 2026 | Minutes of the previous meetingThat the minutes of the previous meeting held on 21 May 2026, be approved as a correct record. | Approved | Open |
| 23 Jul 2026 | Late Representations Report (circulated prior to the meeting i.e. any representations received since this agenda was published).That the Late Representations report be noted. | Noted | Open |
| 23 Jul 2026 | SMD/2025/0305 - Land North of Calvin Court, KingsleyThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. In the even... | Refused | Open |
| 23 Jul 2026 | SMD/2026/0165 - Land to the South of Mill Lane, Wetley RocksThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. That in the... | Refused | Open |
| 23 Jul 2026 | SMD/2025/0380 - Land adjacent to High View, Sutherland Road, LongsdonThat the application be REFUSED for the reasons and based on the policies contained within the report; 2. In the even... | Refused | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.