HPK/2019/0223 & HPK/2021/0235 - Land to the rear of The Peaks, Manchester Road, Tunstead Milton, Whaley Bridge

Refused Planning 1 paper

Development Control Committee refused this item on Monday 15 August 2022. Below is the council's own wording, with the papers it was decided on.

Item23/24

Resolved

That the application be REFUSED for the reasons and based on the policies as set out in the report. 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in conjunction with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

15th August 2022

Application No: HPK/2019/0223 Location Land to the rear of The Peaks, Manchester Road, Tunstead Milton, Whaley Bridge Proposal Single Storey Industrial Building 60.0 m x 20.0m Applicant JE Morten Ltd Agent Emery Planning Partnership Ltd Parish/Ward Whaley Bridge Date registered: 23/10/2019 If you have a question about this report please contact: Rachael Simpkin [email protected] 01538 395400 extension 4122

REFERRAL

The full planning application for a large storage building positioned on Local Green Space is contrary to the Development Plan.

1. SUMMARY OF RECOMMENDATION

REFUSE

Application No: HPK/2021/0235 Location Land to the rear of The Peaks, Manchester Road, Tunstead Milton, Whaley Bridge Proposal Retention of concrete blockwork wall retaining bank to Canal Feed Applicant JE Morten Ltd Agent David Prior Designs Parish/Ward Whaley Bridge Date registered: 14/05/2021 If you have a question about this report please contact: Rachael Simpkin [email protected] 01538 395400 extension 4122

REFERRAL

The full planning application is retrospective in nature.

1. SUMMARY OF RECOMMENDATION

REFUSE 2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The c.0.5 ha application site for the proposed building (excluding the wetland scrape / flood storage) is an open field with a landscape character type of Settled Valley Pastures, located in countryside to the south of the B5470 Manchester Road, west of Tunstead Milton. It is also located within a LGS (Local Green Space) no. 11 ‘Field behind Morton’s Yard, Tunstead Milton, between Randall Carr Brook and canal feeder’ designated by Chapel-en-le-frith Neighbourhood Plan. At a distance of approximately 0.85 km to the southwest, following the line of Long Lane, is the Peak District National Park boundary.

2.2Access is gained via the B5470 Manchester Road. To the north is the canal feeder for Combs Reservoir, separating the site from the PEZ (Primary Employment Zone), which fronts Manchester Road. The retaining wall works to the canal feeder are located within the PEZ in close proximity to the tank. To the south is Randal Carr Brook and open countryside at a lower land level.

2.3The Public Right of Way footpath HP6/21/2 as accessed from Manchester Road close to Riverside runs in a southwest then southeast direction to cross the railway south in close proximity to the site providing access to Chapel-en-le-Frith and Whaley Bridge beyond.

2.4The proposed development is close to trees protected under Derbyshire Tree Protection Order (TPO) Number 78.

2.5In addition, the application site mostly falls within a High Risk Flood Zone.

Revised Location Plan (Building): 3. DESCRIPTION OF THE PROPOSAL

3.1Full planning permission (as revised) is sought for an industrial building for storage and manufacturing space and is proposed in relation to the expansion of the existing premises JE Morten in the Primary Employment Zone nearby.

3.2The building would be 60.0m x 20.0m x 7.8m, clad in profile steel in Jupiter green with an artificial stone ‘plinth’ for the bottom 450mm. The total gross internal floorspace would amount to 1155sqm. Steel sheets are proposed for the roof, with roof lights. On the northwest elevation, eight silo tanks are proposed whilst on the southwest elevation four steel roller shutter doors are proposed.

3.4Permeable cellular paving to be planted is now proposed for the yard areas with the provision of 16 car parking spaces and also cycle store. Flood Storage compensation works are also proposed including a wetland scrape area within the southeast site area of the extended red edge.

Proposed Site Plan AIA Rev B:

3.5The revised submission plans are detailed below:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2019/0223 & HPK/2021/0235: Land to the rear of The Peaks, Manchester Road, Tunstead Milton, Whaley BridgeReport 2.5 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 23 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
SY
Councillor Stewart YoungCommittee Member, present

All 23 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2019/0223 & HPK/2021/0235 - Land to the rear of The Peaks, Manchester Road, Tunstead Milton, Whaley BridgeThis decision
  2. HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonApproved
  3. HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireApproved
  4. HPK/2026/0111 - Lambert House, Brook Street, GlossopApproved
  5. HPK/2026/0195 - 20 Albion Road, New Mills, SK22 3EXApproved
  6. HPK/2026/0086 - Hague Bar Works, Hague Bar, New Mills, SK22 3ATRefused

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open