That the details within the Late Representation report be noted in terms of the update to the recommendation; 2. That the application be APPROVED for the reasons and based on the policies contained within the report; 3. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be given delegated authority to do so in consultation with the Chair of the Planning Applications Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision. (Proposed by Councillor Flunder and seconded by Councillor Hoptroff)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
8th June 2023
Application SMD/2022/0548 No: Location Land Adjacent Cellarhead Substation Rownall Road Wetley Rocks Staffordshire Proposal Erection and operation of a Battery Energy Storage System and associated infrastructure and equipment Applicant Sirius Renewable Energy Ltd Agent Sirius Renewable Planning Parish/ward Cheddleton Date registered 6/10/22 If you have a question about this report please contact: Jane Curley tel: 01538 395400 ex 4124 [email protected]
REFERRAL
This is a Major application and the Committee determined a similar scheme on this site in June 2022
1. SUMMARY OF RECOMMENDATION
Approve with conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The main site consists of two agricultural fields with a new access through a third field to the south. The site is said to be approximately 5.4 hectares. It lies immediately adjacent to the eastern boundary of the Cellarhead substation and to the west of Rownall Road. It is within the Green Belt.
2.2Two existing accesses are proposed to serve the site. The existing track from Rownall Road to the east (also line of Public footpath, Cheddleton 53) leading to the farmyard, buildings and fields is to be used once the site is operational by the DNO (District Network Operator) who will have access to the substation compound to the north eastern corner of the site. The existing substation access road to the south (also the route of Public Footpath 60) will be used during the construction phases and for routine maintenance checks once the site is operational. A new length of access track approx. 180m in length and 5m in width is proposed between the south east corner of the site and this existing access running in a straight line. The site access drawing show this to be a gravelled surface with central grass strip.
2.3The site is bound to the north by partial hedging, trees and fencing, beyond which is a farm track (also a continuation of Public Footpath Cheddleton 53). To the north east is a collection of agricultural buildings. To the west the site is bound by hedging. Beyond this is a narrow strip of woodland through which Public footpath Cheddleton 47 runs and the Cellarhead substation. To the south and east the site adjoins agricultural land with hedging/fencing and trees forming the boundaries.
2.4The site gently falls gently in a westerly direction towards the existing substation
2.5There are two high voltage overhead electricity pylons in the north western portion of the site.
3. DESCRIPTION OF THE PROPOSAL
3.1This is a re submission of SMD/2022/0047 a similar battery storage proposal which was refused for two reasons as follows:-
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.