That the Late Representation report be noted. 2. That the application be REFUSED, for the reasons and based on the policies contained within the report; 3. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision (Proposed by Councillor Roberts and seconded by Councillor Kempster)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
14th September 2023
Application SMD/2023/0093 No: Location Breach Lane Caravan Site, Totmonslow, nr Upper Tean, ST10 4JL Proposal Erection of 5no. bungalows and associated works. Applicant Sapling Associates Ltd Agent Rob Duncan Planning Consultancy Ltd Parish/ward Checkley Date registered: 16.02.2023 If you have a question about this report please contact: Chris Johnston tel: 01538 395400 ext. 4123 [email protected]
REFERRAL
The application is before committee by Cllr Deaville to decide if the application complies with Green Belt policy and also because from a community point of view there would be less traffic than the current use.
1. SUMMARY OF RECOMMENDATION
REFUSE
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site is in the countryside within a mile to the west of Upper Tean and is on the eastern edge of the small “hamlet” of Totmonslow, a small grouping of dwellings and other buildings. It comprises a small touring caravan and camping site on the north side of Breach Lane, a narrow country lane and which provides access to the property. It is claimed there are pitchings for 5 caravans and 10 tents. There is also a static caravan (managers accommodation) and two medium size solid outbuildings with mono-pitch roofs. In addition to this there are seven small shed or cubicle type buildings. The nine “buildings” are used for toilets, showers and storage purposes. Open land lies to the north and east and also to the south to the other side of the lane. To the west lies dwellings and farm buildings. The site has an area of 0.4 hectares. The site is in the Green Belt.
3. THE APPLICATION AND DESCRIPTION OF THE PROPOSAL
3.1This is a full planning application for five detached 3-bed brick-and-tile bungalows. These would be placed in the west part of the site to the west and north of the site access on open grassland and where there is the static caravan and a small number of outbuildings. It does not appear to include any of the land used as a touring caravan and camping site (and associated facilities/structures) which is to the east of the access although the applicant claims the caravan and camping use would cease and all nine buildings/structures along with the static caravan would be removed and the land returned to agricultural use. Three of the bungalows would be placed to the west of the access, facing the access drive to the north and two would be placed to the other side of the drive, to the north of it, in the north-west corner of the site. Each would have two parking spaces and a rear garden. The application is accompanied by a Planning Statement, Preliminary Ecology Assessment Report and a Tree Survey Report.
3.2Further information regarding the vehicle movements from the caravan and camping site was provided on the 17th May 2023.
3.3On 14th July 2023, amended plans were received showing the relocation of the access approx. 30m along the lane towards the north-west. The new access road would be 4.5m wide (wider than the existing access road) and would involve the removal, setting back and cutting back, by a max 2.5 metres, of 109m of hedgerow to the east of the new access, 23m of hedgerow to the west of the access in order to provide visibility splays of a standard 215m for these types of roads. There would also be some extraction at the new access point to create the right gradient from the lane to the new access road.
3.4The plans were further amended on 27 th July 2023 to show further clarification of the access works including one of the visibility splay locations (to the east), drainage interceptor outflow point and the amount of hedgerow removal to the west of the new access.
3.5The application files including the drawings, reports and other details of the proposal together with consultation and notification responses can be viewed on the Council website at:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.