Planning Applications Committee approved this item on Thursday 14 September 2023. Below is the council's own wording, with the papers it was decided on.
That contrary to officers’ recommendation, the application be APPROVED for the following reasons: a. The application is in accordance with Policies SS1, SS2, SS10 paragraph 3, TCR 3, SO7 and DC1 of the adopted Staffordshire Moorlands Local Plan 2020 and guidance contained within the National Planning Policy Framework; b. The property would benefit from being redeveloped and no objections to the application had been received from neighbouring properties. 2. That the following conditions be added: a. Existing dwelling occupied by the applicant to be a holiday let; b. Front façade of the building to be constructed from stone and brick. 3. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision (Proposed by Councillor Roberts and seconded by Councillor Hoptroff)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
14th September 2023
Application SMD/2023/0227 No: Location Horton Barn Eaves Lane Armshead Proposal Change of use from agricultural building into a residential dwelling Applicant Mr and [name removed] Oliver Ltd Parish/ward Werrington Date registered: 11th July 2023 If you have a question about this report please contact: Benjamin Hurst tel: [phone removed] [email protected]
REFERRAL
The application is before committee at the request of Cllr Ross Ward. He is in support of the application and does not think that there would be harm to the Green Belt because there is already a building on site. He also believes that there would be benefit to the tourism strategy by allowing the applicant’s existing dwelling to be used as holiday accommodation.
1. SUMMARY OF RECOMMENDATION
REFUSE
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1This site was until c.2016 part of Kerry Hill Farm, a large functioning dairy farm. The newly named Horton Barn was a narrow linear single storey brick and clay tile farm building of traditional style which has been converted into a dwelling. An extensive range of typical 20 thC livestock buildings attached and extending to the east has now largely been demolished, leaving the application building a largely open fronted and sided portal frame shed with part concrete block and panel walls with vented timber boarding above and a metal sheet roof. It has a total floor area of 240 sq metres.
2.2Behind these to the north where there is a fall in the land were two silage clamps. One of these is now used as a manège. The general surroundings are of agricultural fields. To the west of Horton Barn is a public footpath which runs generally north into the fields and passes the west edge of the application site. Also to the west of Horton Barn is the original farm yard, farm house and other outbuildings of Kerry Hill Farm. The latter is in the process of part conversion to a further dwelling. Adjacent again to the west are two unrelated dwellings. Access to the site is from Eaves Lane at a point some 80m along to the east form the entrance to Horton Barn. 3. THE APPLICATION AND DESCRIPTION OF THE PROPOSAL
3.1This application is a further attempt to convert a functional open sided pole barn farm shed into a large 4/5 bed dwellinghouse across a single storey floor plan. The dwelling would provide a large open plan living area, kitchen dining area, and separate office snug. There would be one ensuite bedroom and a single family bathroom.
3.2The development would require new concrete block walls to be built up throughout to provide structural robustness and to close openings, new cladding to the exterior incorporating an arrangement of glazing panels and slot windows would provide light and outlook. The conversion project would work largely across the existing form and footprint of the existing shed.
3.3With consideration of the previous application the authority set out a position which concluded that the development was not provided for by the ‘reuse’ exception at para 150 of the NPPF because the building is not of permanent and substantial construction. The development was considered to be inappropriate and by definition harmful to the Green Belt. It was also considered that there would be harm to the character and appearance resulting from the development which would undesirably turn a functional open sided shed into a dwelling that is disproportionately large, of odd, incoherent and unusually appointed appearance.
3.4This repeat application, attempts to demonstrate considerations as ‘very special circumstances’ and presents the following case:
There would be benefit to rural economy because the applicant’s would be able to move out of their existing brick built barn conversion and move into the proposed conversion as their new family home while making the existing dwelling available for holiday lets.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.