CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Climate Change Working Group (SMDC), Wednesday 24 April 2024 at 6.00pm

Peak Cluster Project - John Egan, Progressive Energy Ltd

Decided Committee 1 paper

Climate Change Working Group (SMDC) decided this item on Wednesday 24 April 2024. Below is the council's own wording, with the papers it was decided on.

Item29

Resolved

That the presentation ... view the full minutes text for item 29.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Climate Change Working Group (SMDC)

An environmental and economic imperative An economic and low carbon imperative

The ‘Peak Cluster’ cement and lime facilities together:

• Produce 40% of the UK’s lime and cement ​ • Emit 3 million tonnes of CO2 per year​ • Account for over 23% of emissions in Derbyshire and Staffordshire

Lostock Sustainable Energy Plant will emit 0.6 million tonnes of CO2 per year. Cement – essential for construction Cement is a key ingredient in concrete - the most consumed human-made substance on earth because it is vital for construction  Buildings and their foundations  Schools, hospitals and offices  Bridges and tunnels  Railway sleepers  Pipelines and flood defences  Wind turbine bases, nuclear power plants, and dams for hydropower

Concrete keeps us safe, it keeps us healthy and it is fundamental to our lives. Reaching net zero requires CCUS

CCUS Morecambe Net Zero Sellafield CO2 Transported By Rail

Barrow Gas CO2 Transported Terminal By Ship

• Phased development of carbon stores and transportation routes • Storage capacity of 1GT Morecambe • Scaling sequestration up to 25 MTPA by 2040 • NSTA awarded storage & appraisal licence in 2nd CO2 storage round May 2023 Pipeline from Peak Cluster and other NW sources Blackpool •

• MoU signed between Spirit and Peak Cluster partners September 2023 • Rail transport from dispersed UK sites • Shipping from UK and Northern European clusters CO2 Stored 1km Underground Liverpool

CO2 Transported by Pipeline National Infrastructure Assessment Peak Cluster – Lifecycle Analysis Peak Cluster will reduce overall greenhouse gas emissions by 3.9 million tonnes each year from 2030

Raw materials This is equivalent to taking 0.8 million cars off the road – Construction roughly equivalent to 3/4 of all cars contained in Peak District’s Constituent Authorities total area1 : Operational energy use  Barnsley  North East Derbyshire Decommissioning  Cheshire East  Oldham  Derbyshire Dales  Sheffield  High Peak  Staffordshire Moorlands  Kirklees Carbon dioxide This is also equivalent to planting 155 million trees per year storage This would require an area the size of the Peak District every 2.3 years2 Carbon emissions from Peak Cluster – including the raw materials, construction, operation and decommissioning – will be offset in under 5 months of the 1 Using 2021 ONS Census Data; 1.17 million cars for the

project’s operation. Constituent Authorities assuming 3 car max per household, all cars assumed have internal combustion engines 2Assuming 2 x 2 m area required per tree Peak Cluster: Optimum decarbonisation option • Decarbonisation by de-industrialisation not Government policy • High skilled employment Shut down • UK a net importer of cement - shutting down would damage balance of payments Carbon • Substantial UK limestone reserves Capture

• >60% of emissions from cement and lime Road Rail Pipeline Carbon production are from raw material (limestone) transport transport transport Capture & • Carbon capture is the only available Storage technology to decarbonise cement and lime 1000 vehicles/day 10-11 trains/day production Permanent High cost of liquefaction / gasification Storage • Cement and lime production intentionally located close to mineral reserves to minimise Carbon Capture & Storage Relocate haulage of quarried minerals production • Logistics impact to ship limestone to production far greater than shipping CO2

CONFIDENTIAL 11 Timeline

2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Public launch / early engagement Consents and approvals Operational obtained Questions? Industrial decarbonisation at scale

peakcluster.co.uk

[email removed]

@peak_cluster

Peak Cluster

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Peak Cluster Project: John Egan, Progressive Energy LtdReport 5.7 MB DownloadRead as text

At this meeting

Whole meeting
28To Approve the Minutes of the Previous MeetingApproved
29Peak Cluster Project - John Egan, Progressive Energy LtdThis decision

Who was there

11 of 21 attended
MJ
Councillor Mark JohnsonChair, present
CJ
Councillor Christina JebbVice-Chair, present
CB
Councillor Crecy BooneCommittee Member, present
CB
Councillor Connor BradyCommittee Member, present
MD
Councillor Marc DuroseCommittee Member, absent
KF
Councillor Keith FlunderCommittee Member, present
JG
Councillor Jim GarveyCommittee Member, present
IH
Councillor Ian HerdmanCommittee Member, present
TH
Councillor Tony HolmesCommittee Member, present
JK
Councillor Jonathan KempsterCommittee Member, present
JP
Councillor Joe PorterCommittee Member, present
MS
Councillor Matthew SpoonerCommittee Member, present

All 21 on the meeting page

On this subject at High Peak

Search all
  1. Peak Cluster Project - John Egan, Progressive Energy LtdThis decision
  2. Peak Cluster Presentation (Progressive Energy)Decided

More from High Peak Climate Change Working Group (SMDC)

All decisions
MeetingDecisionOutcome
23 Apr 2025 To Approve the Minutes of the Previous Meeting.That the minutes of the previous meeting held on 24 February 2025, be approved as a correct record. Approved Open
23 Apr 2025 Delivery UpdatesThat the presentation be received. 2. That Officers review the possibility of creating graphics for public education ... Decided Open
23 Apr 2025 Climate Change and Nature Working Group Proposal.That the presentation be received. 2. That the proposal for a Joint Climate Change and Nature Steering Group be noted. Noted Open
24 Feb 2025 To approve the minutes of the previous meetingThat the minutes of the previous meeting held on 27 November 2024, be approved as a correct record. Approved Open
24 Feb 2025 Results of SMDC ConsultationThat an Action Plan be produced from the results of the consultation taking into account members’ comments, as stated... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies