An environmental and economic imperative An economic and low carbon imperative
The ‘Peak Cluster’ cement and lime facilities together:
• Produce 40% of the UK’s lime and cement • Emit 3 million tonnes of CO2 per year • Account for over 23% of emissions in Derbyshire and Staffordshire
Lostock Sustainable Energy Plant will emit 0.6 million tonnes of CO2 per year. Cement – essential for construction Cement is a key ingredient in concrete - the most consumed human-made substance on earth because it is vital for construction Buildings and their foundations Schools, hospitals and offices Bridges and tunnels Railway sleepers Pipelines and flood defences Wind turbine bases, nuclear power plants, and dams for hydropower
Concrete keeps us safe, it keeps us healthy and it is fundamental to our lives. Reaching net zero requires CCUS
CCUS Morecambe Net Zero Sellafield CO2 Transported By Rail
Barrow Gas CO2 Transported Terminal By Ship
• Phased development of carbon stores and transportation routes • Storage capacity of 1GT Morecambe • Scaling sequestration up to 25 MTPA by 2040 • NSTA awarded storage & appraisal licence in 2nd CO2 storage round May 2023 Pipeline from Peak Cluster and other NW sources Blackpool •
• MoU signed between Spirit and Peak Cluster partners September 2023 • Rail transport from dispersed UK sites • Shipping from UK and Northern European clusters CO2 Stored 1km Underground Liverpool
CO2 Transported by Pipeline National Infrastructure Assessment Peak Cluster – Lifecycle Analysis Peak Cluster will reduce overall greenhouse gas emissions by 3.9 million tonnes each year from 2030
Raw materials This is equivalent to taking 0.8 million cars off the road – Construction roughly equivalent to 3/4 of all cars contained in Peak District’s Constituent Authorities total area1 : Operational energy use Barnsley North East Derbyshire Decommissioning Cheshire East Oldham Derbyshire Dales Sheffield High Peak Staffordshire Moorlands Kirklees Carbon dioxide This is also equivalent to planting 155 million trees per year storage This would require an area the size of the Peak District every 2.3 years2 Carbon emissions from Peak Cluster – including the raw materials, construction, operation and decommissioning – will be offset in under 5 months of the 1 Using 2021 ONS Census Data; 1.17 million cars for the
project’s operation. Constituent Authorities assuming 3 car max per household, all cars assumed have internal combustion engines 2Assuming 2 x 2 m area required per tree Peak Cluster: Optimum decarbonisation option • Decarbonisation by de-industrialisation not Government policy • High skilled employment Shut down • UK a net importer of cement - shutting down would damage balance of payments Carbon • Substantial UK limestone reserves Capture
• >60% of emissions from cement and lime Road Rail Pipeline Carbon production are from raw material (limestone) transport transport transport Capture & • Carbon capture is the only available Storage technology to decarbonise cement and lime 1000 vehicles/day 10-11 trains/day production Permanent High cost of liquefaction / gasification Storage • Cement and lime production intentionally located close to mineral reserves to minimise Carbon Capture & Storage Relocate haulage of quarried minerals production • Logistics impact to ship limestone to production far greater than shipping CO2
CONFIDENTIAL 11 Timeline
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Public launch / early engagement Consents and approvals Operational obtained Questions? Industrial decarbonisation at scale
peakcluster.co.uk
[email removed]
@peak_cluster
Peak Cluster
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Peak Cluster Project: John Egan, Progressive Energy LtdReport | 5.7 MB | DownloadRead as text |
Follow Climate Change Working Group (SMDC) at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Apr 2025 | To Approve the Minutes of the Previous Meeting.That the minutes of the previous meeting held on 24 February 2025, be approved as a correct record. | Approved | Open |
| 23 Apr 2025 | Delivery UpdatesThat the presentation be received. 2. That Officers review the possibility of creating graphics for public education ... | Decided | Open |
| 23 Apr 2025 | Climate Change and Nature Working Group Proposal.That the presentation be received. 2. That the proposal for a Joint Climate Change and Nature Steering Group be noted. | Noted | Open |
| 24 Feb 2025 | To approve the minutes of the previous meetingThat the minutes of the previous meeting held on 27 November 2024, be approved as a correct record. | Approved | Open |
| 24 Feb 2025 | Results of SMDC ConsultationThat an Action Plan be produced from the results of the consultation taking into account members’ comments, as stated... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.