CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Climate Change Working Group (HPBC), Tuesday 26 November 2024 at 6.00pm

Peak Cluster Presentation (Progressive Energy)

Decided Committee 1 paper

Climate Change Working Group (HPBC) decided this item on Tuesday 26 November 2024. Below is the council's own wording, with the papers it was decided on.

Item25/5

Resolved

That the presentation be received.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Climate Change Working Group (HPBC)

An environmental and economic imperative An environmental and economic imperative

The Peak Cluster cement and lime facilities together:

• Produce 40% of the UK’s lime and cement • Employ around 2000 people ​ • Emit over 3 million tonnes of CO2 per year​ • Account for over 23% of emissions in Derbyshire and Staffordshire Cement – essential for construction Cement is a key ingredient in concrete - the most consumed human-made substance on earth because it is vital for construction § Buildings and their foundations § Schools, hospitals and offices § Bridges and tunnels § Railway sleepers § Pipelines and flood defences § Wind turbine bases, nuclear power plants, and dams for hydropower

Concrete keeps us safe and healthy and is fundamental to our lives. Reaching net zero requires CCUS

CCUS Peak Cluster: Optimum decarbonisation option • Decarbonisation by de-industrialisation not Government policy • High skilled employment Shut down • UK a net importer of cement - shutting down would damage balance of payments • Substantial UK limestone reserves Carbon Capture • >60% of emissions from cement and lime production are from raw material (limestone) Carbon Road Rail Pipeline • Carbon capture is the only available transport transport transport Capture & technology to decarbonise cement and lime Storage production 1000 vehicles/day 10-11 trains/day • Captured CO2 needs to be permanently sequestered Permanent High cost of liquefaction / gasification Storage • Cement and lime production intentionally located close to mineral reserves to minimise Carbon Capture & Storage Relocate haulage of quarried minerals production • Would require unacceptable logistics to ship limestone to production (far more than shipping CO2)

8 Morecambe Net Zero Sellafield CO2 Transported By Rail

Storage capacity of 1GT Barrow Gas • CO2 Transported Terminal By Ship

• Scaling sequestration up to 25 MTPA by 2040 • Pipeline from Peak Cluster • Rail transport from dispersed UK sites Morecambe • Shipping from UK and Northern European clusters

km 25 • NSTA awarded storage licence in 2nd CO2 storage round May 2023 • NSTA awarded early risk assessment phase completion in April Blackpool • Working ongoing with site characterisation • Seismic acquisition completed on time and budget over 500 square kilometres • Crown Estate engagement ongoing including early contract review for lease arrangement CO2 Stored 1km Underground Liverpool

CO2 Transported by Pipeline “Carbon capture Not just our opinion…… and storage is a necessity not an option” Committee on Climate Change Lifecycle Peak Cluster will reduce overall greenhouse gas emissions by over 3 million tonnes each year from 2030. This is equivalent to… …Taking 0.8 million cars off the road –roughly equivalent to 3/4 of all cars contained in Peak District’s Constituent Authorities total area1 :

§ Barnsley § North East Derbyshire § Cheshire East § Oldham § Derbyshire Dales § Sheffield § High Peak § Staffordshire Moorlands § Kirklees

…Planting 155 million trees per year This would require an area the size of the Peak District every 2.3 years2

2042 2055 2070 Billion tree 1.9 3.8 6.2 equivalent Peak District x 5.0 x 10.6 x 17.1 area 1 Using 2021 ONS Census Data; 1.17 Million cars for the Constituent Authorities assuming 3 car max per household, all cars assumed have

internal combustion engines equivalent2 2Assuming 2 x 2 m area required per tree Questions? Industrial decarbonisation at scale

peakcluster.co.uk

[email removed]

@peak_cluster

Peak Cluster

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Peak Cluster Presentation (Progressive Energy)Report 15 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 23 attended
PB
Councillor Pauline BellCommittee Member, present
AB
Councillor Angela BenhamCommittee Member, present
JB
Councillor Jennifer BenzerCommittee Member, present
JC
Councillor Joanna CollinsVice-Chair, present
DE
Councillor Dom Elliott-StarkeyCommittee Member, present
SE
Councillor Simon EvansCommittee Member, apologies, sent representative
LG
Councillor Linda GroobyCommittee Member, present
MH
Councillor Madeline HallCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
PI
Councillor Peter InmanCommittee Member, absent
AM
Councillor Anthony McKeownChair, present
PR
Councillor Pam ReddyCommittee Member, absent

All 23 on the meeting page

On this subject at High Peak

Search all
  1. Peak Cluster Presentation (Progressive Energy)This decision
  2. Peak Cluster Project - John Egan, Progressive Energy LtdDecided

More from High Peak Climate Change Working Group (HPBC)

All decisions
MeetingDecisionOutcome
25 Feb 2025 Minutes of the previous meetingThat the minutes of the meeting held on 14 January 2025 be approved as a correct record. Approved Open
25 Feb 2025 Climate Change Projects for High Peak Borough CouncilThat the report be noted. Noted Open
25 Feb 2025 Potential implications from LGR and devolutionThat a network map of key organisations and individuals be devised. 2. That a joint group with Staffordshire Moorland... Decided Open
14 Jan 2025 Minutes of the previous meetingThat the minutes of the meeting held on 26 November 2024 be approved as a correct record. Approved Open
14 Jan 2025 Nature Update - Gillian Wright (verbal)That the update be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies