CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 20 May 2024 at 1.30pm

Update Sheet

Noted Planning 1 paper

Development Control Committee noted this item on Monday 20 May 2024. Below is the council's own wording, with the papers it was decided on.

Item25/3

Resolved

That the update sheet be noted.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

20th May 2024

HPBC DEVELOPMENT CONTROL COMMITTEE

UPDATES REPORT

HPK/2022/0474 – Land at Charlestown Works, Glossop

Applicant:

Affordable Housing We disagree that insufficient information was provided in regard to the level of affordable housing provision required. We have accepted that a number of affordable housing units are required, and had previously offered 20% of the development, a total of 5 Units. The viability study does quantify that 7 Units, 30% of the development is justified and therefore are happy to condition this within a S106 Agreement, in order to satisfy Policy H9.

We have also agreed to all sums stated within the Summary of Recommendation and again we are happy to condition this within any S106 Agreement.

Housing Types A schedule of accommodation confirms that the proposed dwellings are both accessible and adaptable’ to standard in Part M4(2) of Building Regulations / NDSS space standards. We disagree that the proposal doesn’t provide a range of housing types.

As noted within the summary of recommendation there are a lack of 1 Bedroom Apartments, and therefore for us to create a number of 3 Bedroom Apartments, would reduce the number of smaller 2-bedroom properties on each floor. The ideology of some of the smaller 2-bedroom properties was that nine of the apartments could be used as one bedroom apartment plus a home style office.

The schedule of accommodation has been updated to make this more transparent. We could in principle reduce the number of 2 Bedroom properties to just 1 Bedroom, however this reduces the market for people wanting to either homework or study. We have taken advice from a housing provider who is interested in both blocks; however, 3 and 4 Bed Apartments were not suitable, for their target audience.

Price point was taken into consideration in incorporating a 3 Bedroom Flat, which would have Resulted in a pricing point marketed at a higher price than the majority of 3 Bedroom Homes within the local area. The average housing types being chimney pots and therefore a 3-or 4-Bedroom Flat would not be aimed at the right demographic.

We have accommodated for either elderly or disabled residents on the ground floor, with access to a number of disabled parking.

We have updated our floor plan drawings Block 1, Reference 2022/027/PEAB1/D, & Block 2, Reference 022/027/PAB2/C, to reflect these changes. Design We do not agree that the proposed development does not provide for a sense high quality design. The design is both in keeping with the previous application, and in keeping with other neighbouring flat conversions within the local area. The only addition to this, is the residents garden incorporated within the roof of the development. During the planning process, it was noted a discussion had been raised from one of the flat owners in the converted building adjacent. In conjunction with comments raised from the council, in that we could/should remove a number of side elevation habitable windows. Revised Plans removing identified, side windows to the lounge and bedrooms were adjusted to make the scheme compliant in respect of any overlooking or privacy issues.

Highways We have adjusted the site-plan drawings, drawing reference 023/021/PSP/E, to satisfy the Highways Officers objection. To date there has been no discussion that the design to the external design was inappropriate, and at no time was it offered for a discussion with a Uban Design Manager or equivalent.

Environment Agency:

Awaited.

Case Officer:

Clearly, the applicant’s submitted Financial Viability Appraisal (FVA) only relates to the office (formerly B1) of the application site and therefore is not a site wide appraisal of the former Charlestown Works consent. Accordingly, the applicant would need to provide an FVA in relation to the entire approved scheme with evidence regarding sales information to date and construction costs expended to establish the affordable housing needs of the proposed development.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Update SheetReport 206 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

15 of 24 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
SE
Councillor Simon EvansCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
SG
Councillor Stewart GardnerCommittee Member, present
PH
Councillor Paul HardyCommittee Member, apologies, sent representative
AH
Councillor Adrian HopkinsonCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, apologies, sent representative
PR
Councillor Peter RobertsCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
GS
Councillor Gillian ScottCommittee Member, apologies, sent representative

All 24 on the meeting page

On this subject at High Peak

Search all
  1. Update SheetThis decision
  2. Update SheetNoted
  3. Update SheetNoted
  4. Update SheetNoted
  5. Update SheetNoted
  6. Update SheetNoted

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies