That the application be approved as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Development Control Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 17 June 2024
Application No: HPK/2024/0028 Location 7 Hadfield Cross, Hadfield Proposal Listed building consent for 2 lofts converted for use for storage and art/music studios with roof light in each and reconfiguration of bathroom to create en suite for master bedroom and family bathroom incorporating the redundant hot water tank cupboard. Applicant [name removed]/ward Hadfield Date registered 09.02.24 If you have a question about this report please contact: Rosie Dinnen [email protected]
REASON FOR COMMITTEE DETERMINATION
This application has been brought before the Development Control Committee as the applicant is a Councillor.
1. SUMMARY OF RECOMMENDATION
Approve with Conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site comprises a grade II listed semi-detached property which dates from late 18th Century. It is situated centrally in Hadfield on The Cross where it adjoins Hadfield Road. Its southern boundary is formed by Spring Gardens, a private access road.
2.3The official list entry which applies to 5 and 7 The Cross is as follows:
“House, now two houses. Late C18 with C20 additions. Millstone grit rubble with ashlar dressings. Stone slate roof to No.5, C20 tiles to No.7. Coped gables and 4 rendered stacks. EXTERIOR: 2 storey. Street front has rusticated plinth, ground-floor sill band, first floor band, moulded cornice, parapet and rusticated quoins plus 6 windows arranged 2:4. No.5, to right has pair of off-centre doorways with moulded ashlar surrounds and continuous flat hood, that to left with panel door and overlight, that to right now blocked. To right single window and to left 2 windows with ashlar surrounds and C20 casements. Above 4 similar windows. No.7, to left has inserted 4-light
1 casement window and above 2 windows with ashlar surrounds and C20 casements. Between Nos 5 and 7 section of quoining to ground floor and original lead rainwater downpipe and hood. Left return has C20 gabled porch and 4-light window with single window above with ashlar surround and C20 casement. Signs of blocked openings mid storey. Beyond rear wing has 3-light casement and above 4-light flush mullion window. INTERIOR: of No.5 has staircase rising from hall to turn in half landing.”
2.4The surrounding locality is residential and the site is in the Hadfield Conservation Area.
3. DESCRIPTION OF THE PROPOSAL
3.1The application seeks retrospective approval of works to a listed building which comprises conversion of an attic space and installing two rooflights. Two staircases were installed up to the attic level and internal partitions were fitted to sub-divide the attic space into three rooms. The roof was lined with insulation and plasterboard and roof joist repaired.
3.2On the first floor level the bathroom was subdivided to create an en- suite and smaller bathroom which extended into the water tank.
3.3The application, the details attached to it including the plans, comments made by residents and the responses of the consultees can be found on the Council’s website at http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServle t?PKID=265610
4. RELEVANT PLANNING HISTORY
4.1The site has been not be subject to any previous application for planning or listed building consent.
5. PLANNING POLICIES RELEVANT TO THE DECISION
High Peak local Plan 2016
S1 Sustainable Development Principles EQ6 Design and Place Making EQ7 Built and Historic Environment
National Planning Policy Framework 2021
Achieving Sustainable Development Chapter 2 Achieving Well Designed Places Chapter 12 Conserving and Enhancing the Historic Environment Chapter 16
6. CONSULTATIONS CARRIED OUT
2 Site notice 20.03.24 Neighbour letters 20.03.24 Press Notice 14.03.24
Public Comments
6.1No public comments have been received.
6.2The following comments have been received from consultees:
Consultee Comments Conservation Officer No comments
7. POLICY AND PLANNING BALANCE
Planning Policies
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.