That the Late Representations Report be noted; 2. That the application be APPROVED for the reasons and based on the policies contained within the report; 3. That a condition be added to include the use of suitable design materials to include details of size and coursing; 4. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided thar the changes do not exceed the substantive nature of the Committee’s decision. (Proposed by Councillor Johnson and seconded by Councillor Hoptroff)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
24th APRIL 2025
Application SMD/2025/0066 No: Location Land adjacent to 310 New Street Biddulph Moor ST8 7NQ Proposal Erection of 2 detached dwellings Applicant Humphries Builders Ltd Agent Rob Duncan Planning Consultancy Parish/ward Biddulph Date registered: 17th Feb 2025 If you have a question about this report please contact: Benjamin Hurst tel: 077385 06367 [email protected]
REFERRAL The application is referred to the Planning Applications Committee at the request of Cllr John Jones.
1. SUMMARY OF RECOMMENDATION
APPROVE subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site is located towards the southwestern end of the larger village Biddulph Moor and comprises a parcel of land located in between nos. 310 and 318 New Street. The land is largely ornamental in nature forms part of the domestic curtilage to no.310 New Street.
2.2To the northeast of the site extends a row of residential dwellings arranged in a ribbon pattern of development that extends all the way up to the centre of the village, connected by an illuminated pedestrian footway. Further residential development extends south-westwards away from the site, also in a ribbon pattern, for a further 280+ metres.
2.3To the southeast of the site lie open agricultural fields, whilst to the northwest of the site the land is enclosed by a low stone wall, beyond which runs the carriageway of New Street. An open field lies beyond that, separated from the road by a mature hedgerow.
2.4Residential developments in the surrounding area comprise of a mixture of detached, semi-detached and terraced properties, and on the eastern side of New Street are predominantly of stone construction with dark grey tiled roofs atop. The site is located within the North Staffordshire Green Belt. The site is not within a Conservation Area, nor are there any statutory listed buildings located in proximity of the site. The centre of the village lies approximately 500 metres to the northeast of the site along New Street. Public transport connections to Biddulph Town Centre, which operate regularly throughout the day, are available approximately 450 metres away to the northeast along New Street.
3. THE APPLICATION AND DESCRIPTION OF THE PROPOSAL
3.1Consent is sought for the erection of 2no. detached dwellings and associated works on land adjacent to New Street, Biddulph Moor. The proposed dwellings will be two storey in scale, standing to ridge heights of 7.8 metres, and are to be constructed from a palette of materials comprising of Tobermore Country Stone to their elevations. Marley Ashmore Smooth Grey tiles were originally proposed for their roofs, but the developer is agreeable to the use of Staffs blue plain clay tiles.
3.2Each of the proposed dwellings will have a gross internal floor area of 118 square metres and will provide an open plan kitchen / living area, separate lounge, utility and w/c. at ground floor, with stairs leading up to four bedrooms at first floor.
3.3To the front of the properties will be a small area of amenity space which is to be enclosed by the existing stone wall that currently runs along the frontage of the site. At the rear, each dwelling will be provided with its own area of private amenity space.
3.4Vehicular access to the dwellings will be taken direct off New Street via two individual private driveways, serving a parking and turning area at the rear of each plot, where space for the parking of up to three vehicles is to be accommodated.
3.5With the submission of amended plans, the principal elevations would now include front doors and there would be integrated solar panels provided on the rear south facing roof planes and the installation of air source heat pumps.
3.6Details of the application scheme can be viewed at:
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.