That the application be approved as set out in the report; and 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 19th May 2025
Application HPK/2025/0067 No: Location Pavillion Gardens, St Johns Road, Buxton, Derbyshire Proposal Replacement of existing boilers and associated equipment
Applicant [name removed] (on behalf of High Peak Borough Council) Agent Mark Payne Parish/ward Buxton Date registered: 07/03/2025 If you have a question about this report please contact: Stuart Talbot, email: [email protected]
REFERRAL
The application is before committee as it is submitted on behalf of high Peak Borough Council
1. Summary of Recommendations
APPROVAL with conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site refers to the Pavillion Gardens Buxton which forms a cluster of Listed Buildings that dates from the 1870’s. The North Entrance foyer, ticket office, and boiler room, was added in the 1930’s, its original design surviving largely unaltered.
2.2The application relates to a Grade II Listed Building, which lies within the setting of the Grade II* Registered Historic Pavilion Park and Garden and stands within the Buxton Central Conservation Area.
3. DESCRIPTION OF THE PROPOSAL
3.1This application seeks Listed Building consent for the replacement of the existing boilers with new boilers and associated plant equipment and the replacement and refurbishment of radiators throughout the building complex.
3.2All existing pipework to the basement plantroom area are to be stripped out and replaced with new pipework. Four new gas fired condensing boilers and pressurisation unit for primary heating are proposed. Further to a new boiler fan, assisted flue header and new heating circulation pumps which are to connect onto the existing heating circuits throughout the Pavillion Gardens complex.
3.3The works to the ground floor include the replacement of the existing steel panel radiators within the back of house corridor and store areas within the kitchen section, to be replaced radiators and with new heating pipework. The majority of this pipework is to run in the ceiling void. The proposals would create a new heating pipework route through the Lobby floor void. Within the restaurant area existing perimeter heaters are to be removed and replaced with new radiators within boxing detail. The restaurant and kitchen areas would receive new fan convector heaters to replace the existing units and match the existing colour. The Gift Shop would also receive a new fan convector heater.
3.4Existing steel panel radiators within the conservatory are to be replaced with new steel units, with the existing heating pipework to be stripped-out and thermally insulated pipework installed. Existing cast iron radiators to the back of house areas and Ground floor corridors are to be refurbished and re-used with existing pipework to be replaced with new pipework utilising the existing wall penetrations.
3.5Existing high level fan convector heater and associated pipework to the Foyer to will be replaced with new units. Perimeter heaters to the foyer, coffee shop and main entrance are to be removed with new radiators within new boxing detail installed.
3.6To the first floor existing cast iron radiators are to be refurbished, paint stripped and repainted with new decorative valves. The upstairs kitchen area is to receive a new fan convector heater which are also proposed within the roof level to replace existing units. The lounge area radiators are to be replaced with new radiators with the existing housings to be adapted to suit the new heater units. No works are proposed to the Paxton Suite.
3.7To the second floor office and meeting room cast iron radiators are to be refurbished and retained with new heating pipework to follow existing pipework routes. New steel column radiators are proposed to the office with existing cast iron heaters retained where existing.
4. Relevant Planning History
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.