That the Late Representations Report be noted; 2. That the application be APPROVED for the reasons and based on the policies contained within the report; 3. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided thar the changes do not exceed the substantive nature of the Committee’s decision. (Proposed by Councillor Johnson and seconded by Councillor Hoptroff)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
Proposal Non-Material Amendment relating to Condition 18 of SMD/2022/0444 Applicant Ameresco Ltd Agent Paul Butler Associates Parish/ward Cheddleton Date registered 28/4/25 If you have a question about this report please contact: Jane Curley [email protected].
REFERRAL
The application is referred to Committee because previous applications have proved to be locally controversial and the amendment relates to drainage conditions which Members wished to be referred back to Committee for discharge.
1. SUMMARY OF RECOMMENDATION
Grant the Section 96A application
2. DESCRIPTION OF THE SITE
2.1The site is currently agricultural fields bound in the main by hedgerows.
3. DESCRIPTION OF THE PROPOSAL
3.1This site has planning permission for a Flexible Energy Facility granted on 22 nd December 2022 under reference SMD/2022/0444. Development has not yet commenced albeit the Council is currently considering a number of Discharge of Condition applications
3.2The application subject of this report is submitted under Section 96A. It proposes an non material amendment to Condition 18
3.3Condition 18 reads as follows:-
Notwithstanding the submitted details, no development shall commence until a surface water drainage scheme has been submitted to and approved in writing by the Local Planning Authority. It should include the following albeit this list is not exhaustive:- Detailed Drainage Design - Final, detailed version of the surface water drainage layout as detailed by Appendix F to the approved Flood Risk and Drainage Assessment (July 2022). The layout should include all pump information, manhole information (manhole ID, diameters, cover levels, invert levels), pipe information (diameter, gradient), headwall information (invert levels), detail of the pond (i.e., top level, bank gradient, base levels etc). An engineered outfall should be avoided in favour of a simple ditch from the pond to the watercourse, with a small wetland area The use of pumped systems in the drainage design must conform to the requirements of Local Standard N of the SCC SuDS Handbook.
Management and maintenance Plan Provision of a management and maintenance plan/ regime for the site. The plan should include the maintenance arrangement/ schedules for the pumping system, the drainage network (i.e., manholes and pipes), control devices (i.e., the hydro brake) and the attenuation basin (i.e., mowing, seeding, silt clearance etc.). The plan should include a named body responsible for undertaking the management and maintenance of the drainage system over the lifetime of the development.
In addition, as a pump is proposed, the plan should detail the management and maintenance regime for the asset, including the use of alarms and emergency procedures. The plan should include a named body responsible for undertaking the management of the pump system to ensure any emergency requirements are undertaken should the pump fail). Thereafter the development shall commence strictly in accordance with the approved surface water drainage scheme.
3.4The reason for the condition is as follows:-
To ensure that a satisfactory Surface water drainage scheme is in place and to minimise flood risk and in the interests of biodiversity
3.5This NMA seeks approval for a different drainage design/layout to that specifically referred to in the Condition 18. It is a gravity fed system (apart from the deep excavated area housing the substation and transformers which will be pumped) but the attenuation pond re positioned in the south eastern field. The approved drainage layout shows the pond centrally located within the eastern field.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.