Resolved
That the update sheet be noted.
Development Control Committee noted this item on Monday 8 September 2025. Below is the council's own wording, with the papers it was decided on.
Resolved
That the update sheet be noted.
8th September 2025
HPBC DEVELOPMENT CONTROL COMMITTEE
UPDATES REPORT
ITEM 1 – HPK/2024/0481 – Former Community College, Glossop
Neighbour Representation(s):
Objection (1) summarised as follows:
We would dispute the need for extra housing in the local area with few long-term employment opportunities in the local area therefore increasing the already significant congestion on the very limited roads out of Glossop.
We also do not consider this proposal aligns with current infrastructure in the area in terms of schools, GPs or dentists. We have poor leisure amenities for the population with one small leisure centre and an old Victorian swimming pool. We do not have a permanently open police station. The current infrastructure of Glossop could not support another 100+ new homes.
It has previously been mooted that this site could be used to improve the leisure facilities that are sorely lacking in Glossop and not now fit for purpose for the population of Glossopdale.
Rather that increasing the housing stock in Glossop without aligning an increase in infrastructure, we believe this site should be considered for a Community Hub for the benefit of the health and wellbeing of the current residents of Glossopdale.
Applicant:
The applicant has clarified their position in relation to the submitted concept plan and levels information, which it considers demonstrates that the application site would be capable of accommodating the up to 110 dwellings sought and any refinement would be addressed at the reserved matters stage. Accordingly, the application is expected to be assessed on the basis submitted and in line with the scope and purpose of an outline planning application.
A letter from the applicant’s agent has been received on the 5th September 2025 and is fully available on the public file via the following link:
http://planning.highpeak.gov.uk/portal/servlets/AttachmentShowServlet?ImageName =557235
It is primarily in relation to the playing field’s lawful use and replacement provision and tilted balance to be afforded to the scheme.
Lead Local Flood Authority (LLFA) 28.08.25: The LLFA has no objection subject to the conditions below.
To ensure adherence to National Planning Policy Framework, DEFRAs Non-statutory technical standards for sustainable drainage systems and local guidance, these recommended conditions should not be altered without consulting the County Council Flood Risk Management team.
1. “No development shall take place until a detailed design and associated management and maintenance plan of the surface water drainage for the site, in accordance with the principles outlined within: a. Adept. (Aug) 2025. Drainage Strategy & Flood Risk Assessment, Talbot Road, Glossop. 00.23181-ACE-ZZ-ZZ-RP-C-0001 Rev P5. including any subsequent amendments or updates to those documents as approved by the Flood Risk Management Team b. And DEFRA’s Non-statutory technical standards for sustainable drainage systems (March 2015), have been submitted to and approved in writing by the Local Planning Authority.” Reason: To ensure that the proposed development does not increase flood risk and that the principles of sustainable drainage are incorporated into this proposal, and sufficient detail of the construction, operation and maintenance/management of the sustainable drainage systems are provided to the Local Planning Authority, in advance of full planning consent being granted.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Update SheetReport | 214 KB | DownloadRead as text |
Follow Development Control Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Aug 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. | Approved | Open |
| 10 Aug 2026 | Update SheetThat the update sheet be noted. | Noted | Open |
| 10 Aug 2026 | Planning ApplicationsThat the report be noted. | Noted | Open |
| 10 Aug 2026 | HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... | Approved | Open |
| 10 Aug 2026 | HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.