HPK/2025/0184 - Newfield Garage, Manchester Road, Tunstead Milton, Derbyshire - Retrospective application for increasing height of boundary wall
ApprovedPlanning1 paper
AI summaryHigh Peak Development Control Committee grants retrospective planning permission to raise a boundary wall to a maximum of 3.85m at the JE Mortens industrial site in Tunstead Milton, subject to structural strengthening works within three months.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedRetrospective application for wall height increase approved
MoneyNot stated
What happens nextStructural strengthening works within 3 monthsSite investigation and strengthening details to be approved by LPA
Who it affectsNot stated
What was decided
Planning permission was granted for the retrospective increase in height of the existing concrete blockwork boundary wall to a maximum of 3.85m, subject to conditions. Report P53
The Head of Development Services was given delegated authority to make minor wording changes to the decision in consultation with the Chair of the Committee. Report P54
A condition was attached requiring site investigation details and implementation of strengthening works within three months of approval, in line with the submitted structural report. Report P53, 7.26
Why
The site is within a designated Primary Employment Zone under the Chapel-en-le-Frith Neighbourhood Plan, where improvements to existing employment sites are supported subject to no adverse amenity impacts. Report 7.4, 7.5, 7.6
Officers found no unacceptable design, landscape, highway or flood risk impacts, and the structural report confirmed the wall is not currently unsafe, though strengthening is needed for the southern section. Report 7.12, 7.15, 7.25, 7.26, 7.32, 7.34
A previous application (HPK/2017/0522) had already approved a wall height of 3.1 to 3.4m, and the further increase was considered consistent with the established industrial context and not harmful to the street scene or adjacent Local Green Space. Report 7.13, 7.15
What happens next
The applicant must submit site investigation details within three months of the permission, based on the structural report by D and D Consulting Engineers (reference J0.14, dated April 2025), and implement approved strengthening works within three months of LPA approval. Report P53, 7.26
Development must be retained in accordance with the approved plans. Report P53
Options considered
Chosen: Grant retrospective planning permission with conditions including structural strengthening. Officers found the wall acceptable in design, amenity, highway and flood risk terms, with structural report confirming it is not unsafe. Report P53, 7.25, 7.26, 8.1
Implications
Legal: The neighbouring occupier raised structural stability concerns; officers determined the wall is not currently a dangerous structure but requires strengthening of the southern section. Report 7.25, 7.26
Risk: Access and civil matters between the parties over use of land by forklift trucks are private civil issues, not planning matters. Report 7.28
Other: The application was submitted following an enforcement complaint from the neighbouring occupier at Higher Birches. Report 7.21
Who and where
The neighbouring occupier at Higher Birches, who objected on grounds of safety, overbearing impact, design and use of the garden Report P2, 6.1
The Borough Councillor for Blackbrook Ward, who called in the application at the parish council's request Report P4, 6.2
Chapel-en-le-Frith Parish Council, which requested committee consideration and a site visit Report P5, P6
The JE Mortens industrial site operator (the applicant) Report 7.4, 7.21
Timeline
April 2025: Structural report by D and D Consulting Engineers (reference J0.14) prepared Report P53
2026-05-18: Development Control Committee granted retrospective planning permission
Within 3 months of permission: Site investigation details to be submitted to the LPA for approval Report P53
Within 3 months of LPA approval of details: Approved strengthening works to be implemented Report P53
Plain English for the jargon
Primary Employment Zone: An area designated under the Chapel-en-le-Frith Neighbourhood Plan where employment site improvements are supported.
Local Green Space (LGS): A protected green area designated in the neighbourhood plan, located approximately 30m south of the wall.
Retrospective application: A planning application submitted after works have already been carried out on site.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item27/7
Resolved
That planning permission be granted as set out in the report; and 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision. (Councillor Roberts returned to the meeting.)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 18th May 2026
Application HPK/2025/0184 No: Location Newfield Garage, Manchester Road, Tunstead Milton, Derbyshire Proposal Retrospective application for increasing height of boundary wall
Applicant [name removed] Emery Planning Parish/ward Chapel-en-le- Date registered: 21/05/2025 Frith/Blackbrook If you have a question about this report please contact: Stuart Talbot, email: [email protected]
REFERRAL
The application is before committee as the application has been called in by Ward Councillor Benham on the grounds that:
Serious concerns that the site borders Local Green Space 11 of the Chapel Neighbourhood Plan. This site is of significant importance and works undertaken should be done with appropriate permissions, not retrospectively, to ensure that there are no adverse effects on the local area or adjacent LGS. Furthermore serious concerns have been expressed as to whether this wall has been constructed safely i.e. with deep enough foundations and support for its height and whether appropriate materials in keeping with its location have been selected. It has been suggested that the way forward would be to have what is considered a potentially unstable, ugly wall taken down and rebuilt soundly with materials in character with the locality and neighbour amenity.
1. Summary of Recommendations
APPROVAL with conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site to which the application relates forms part of the wider site of J E Moreton Ltd located to the south of Manchester Road and the settlement of Tunstead Milton . The site consists of a well established industrial operation involved in the production of AdBlue. 2.2 The application site lies within the Countryside, ‘settled valley pastures’ landscape character area, Flood-zone 2, as well as a Primary Employment Zone area and the CELF Neighbourhood Plan boundary, as defined in the Local Plan.
3. DESCRIPTION OF THE PROPOSAL
3.1Retrospective planning permission is sought for the increase in height of an existing concrete boundary wall which delineates the eastern perimeter of the JE Mortens site with the neighbouring dwelling of Higher Birches.
3.2The boundary between Higher Birches and the application site had previously been afforded a concrete blockwork boundary wall between the two sites. The works which have been undertaken, subject of this application, are to increase the height of said boundary wall. This has been done by adding additional courses of concrete blockwork along the length of the existing boundary wall.
3.3The wall has an approximate length of 33m and varies in height over its length and is approximately 1.77m closest to the highway and increases to a maximum height of 3.85m. For the greatest proportion of the length of the boundary wall, which is directly adjacent to the primary outdoor amenity space of Higher Birches, the wall would have a height of approximately 3.2m - 3.8m.
3.4The application, the details attached to it, including the plans, any comments made by residents and the responses of consultees can be found on the Council’s website at: Planning Application - High Peak Borough Council
4. RELEVANT PLANNING HISTORY
The wider site has a significant planning history relating to various uses (warehousing, light industrial, manufacturing, storage, repair of vehicles and plant machinery, etc.), extensions, new buildings, earth banking, storage silos & storage tanks. which dates back to the 1980’s.
The recent planning history of the site consist of:
Reference no. HPK/2017/0522 Description: To increase height of existing concrete block wall and to roof over part of existing yard, forming covered area (retrospective application) Decision: Approved (29/11/2017)
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.