Resolved
Resolved – That the application be approved as per the agenda and the changes set out in the addendum.
Central & South Planning Committee approved this item on Wednesday 5 September 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved – That the application be approved as per the agenda and the changes set out in the addendum.
Report of the Head of Planning & Enforcement Services
Address BARRA HALL WOOD END GREEN ROAD HAYES
Development: Listed building consent for alterations, repair works (including to roof), rendering of gables, internal decoration and refurbishment and associated works to Barra Hall.
LBH Ref Nos: 8134/APP/2012/268
Drawing Nos: 2012 BH/02 Design and Access Statement Schedule of Works 2012BH/P/03 Rev. C 2012 BH/01 2012BH/P/05 Schedule of Additional Works dated 31 July 2012
Date Plans Received: 06/02/2012 Date(s) of Amendment(s): Date Application Valid: 07/03/2012
1. CONSIDERATIONS
1.1Site and Locality Barra Hall is a Grade II Listed Building located within the Hayes Village Conservation Area close to the junction of Wood End and Botwell Lane. The two-storey building is located within the north-western corner of Barra Hall Park which is identified as Metropolitan Open Land and forms part of the Hayes Village Conservation Area as designated by the UDP.
Barra Hall is owned and operated by Hillingdon Council and is used primarily as a Childrens Centre but is also used as a general community facility/resource centre for local residents.
1.2Proposed Scheme The proposed works to Barra Hall requiring listed building consent involve external repair to the roof following damage from vandalism. The works involve re-roofing, the rendering of gables and internal works that consist of decoration, refurbishment and associated works.
The work to the duo pitched roof will ensure that the finish detail will match the original features including the use of reclaimed tiles. The valleys that were of lead will be replaced by a substitute material.
The gables originally of render with a lead covering will be changed will have the render made good in a sand/cement/lime mix with waterproofing additive to match the original roof features. This approach has been developed in discussion with English Heritage and their officers who are happy with the approach and the intended finished results.
Central & South Planning Committee - 5th September 2012 PART 1 - MEMBERS, PUBLIC & PRESS The internal works including decoration are a result of water penetration.
1.3Relevant Planning History Comment on Planning History There have been previous works and alterations to Barra Hall but these are not relevant to this listed building consent application.
2. Advertisement and Site Notice
2.1Advertisement Expiry Date:- Not applicable
2.2Site Notice Expiry Date:- Not applicable
3. Comments on Public Consultations A site notice was displayed and 14 neighbouring owner/occupiers were consulted in writing on the scheme. No written responses were received from residents.
EXTERNAL:
ENGLISH HERITAGE: No objection
HAYES CONSERVATION AREA ADVISORY PANEL:
I am writing on behalf of the Hayes Conservation Area Advisory Panel.
We have no objection to the replacement of the lead flashings etc with an alternative material in positions where it will not be visible; the test area seems to have worked well. These proposals will not materially change the appearance of the building from ground level so will have no effect on its surroundings. The alterations are symptomatic of the age in which we live and will hopefully reduce the risk of further damage to the building.
INTERNAL:
CONSERVATION OFFICER
These works are required as a result of the lead being stolen from the roof of the building and subsequent water damage. The works have been subject to discussion with English Heritage and are as agreed with them.
CONCLUSION: No objection, as this is a Council application a Committee resolution will be required and forwarded together with the relevant paperwork, including the English Heritage response, to the Dept Communities and Local Government for approval.
A condition should be attached to any approval to ensure that the plasterwork repairs to the interior are like for like and utilise traditional materials and techniques.
4. UDP / LDF Designation and London Plan
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Barra Hall, Wood End Green Road, Hayes 8134/APP/2012/268Report | 6 pages | DownloadRead as text |
Follow Central & South Planning Committee at Hillingdon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 May 2021 | To sign and receive the minutes of the previous meeting dated 7 April 2021That the minutes of the meeting dated 7 April 2021 be approved as an accurate record subject to an amendment to indic... | Approved | Open |
| 4 May 2021 | 2 De Salis Road, Hillingdon - 38071/APP/2020/36391) That the application be refused; and 2) That delegated authority be granted to the Head of Planning to explore the... | Refused | Open |
| 4 May 2021 | 43 Sweetcroft Lane, Hillingdon - 17412/APP/2021/5991) That the application be refused; and 2) That delegated authority be granted to the Head of Planning, in consultati... | Refused | Open |
| 4 May 2021 | Heinz Wolff Building, Brunel University - 532/APP/2021/330That the application be approved. That the application be approved. | Approved | Open |
| 4 May 2021 | Harmondsworth Landfill Site, Harmondsworth Lane - 43155/APP/2020/4267That the application be approved. 1) That delegated authority be granted to the Head of Planning to reword Point 2 on... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.