Resolved
That the application be approved subject to the conditions outlined in the officer’s report and changes as per the addendum.
Central & South Planning Committee approved this item on Thursday 28 November 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
That the application be approved subject to the conditions outlined in the officer’s report and changes as per the addendum.
Report of the Head of Planning, Sport and Green Spaces
Address FORMER CAPE BOARDS SITE IVER LANE COWLEY
Development: Erection of 1 x detached single storey building for the use of general industrial to include mezzanine floor level and associated parking (Part retrospective).
LBH Ref Nos: 751/APP/2013/266
Drawing Nos: A1 3644 PLA 1.01 REV A A1 3644 PLA 1.00 Iver lane Soils report 1 of 2 Iver lane Soils report 2 of 2
Date Plans Received: 01/02/2013 Date(s) of Amendment(s): Date Application Valid: 06/02/2013 1. SUMMARY The application seeks retrospective planning permission for the erection of an industrial building on the Cape Boards Indsutrial Estate.
The building has an external dimension of 24.25 metres in width by 15.25 metres in depth, giving an external footprint of 369.81 square metres. The building has been erected from grey metal sheeting and have a pitched roof design with a maximum height above ground level of 8.26 metres. 10 parking spaces have been provided as part of the proposal.
The built development was required as the applicant, Nationwide Platforms, operated their business from the site directly to the north of the application site and the site does not allow capacity for the repair, maintenance and distribution of the 'truck mount' fleet. In addition the tenants 'self-propelled' delivery fleet will also be maintained at the site, using the inspection pit provided in the new building.
The applicant has confirmed that the creation of the new building has not created any additional traffic flows coming to and from the site, as the expansion has merely allowed for the maintenance of the fleet to be done within the site. Prior to the development of the building, these vehicles were required to be removed from the site and maintained elsewhere, therefore, the building has reduced traffic flows to and from the area. The Highways Officer has reviewed the submitted information and raised no objection in terms of highways impact terms, subject to a condition limiting the use of the site for the repair, storage and maintenance of the vehicles in ownership of the immediately adjoining site (currently Nationwide Platforms), to prevent a standalone maintenance business from operating within the site.
The built development is considered to have had an acceptable impact on the residential amenity of the residential dwellings to the south and west and on the Character and Appearance of the surrounding area. Therefore, the development is considered acceptable and is recommended for approval. 2. RECOMMENDATION APPROVAL subject to the following:
Central & South Planning Committee - 28th November 2013 PART 1 - MEMBERS, PUBLIC & PRESS 1 COM4 Accordance with Approved Plans The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers A1 3644 PLA 1.00 & A1 3644 PLA 1.01 Rev A and shall thereafter be retained/maintained for as long as the development remains in existence.
REASON To ensure the development complies with the provisions Hillingdon Local Plan: Part Two Saved UDP Policies (November 2012) and the London Plan (July 2011).
2 B19 Personal Permissions The development hereby permitted shall only be used for the repair, maintenance and distribution of vehicles, machinery or equipment which are owned and/or operated by the operator of the area of land immediately to the north of the application site and demarcated by a dotted line on drawings A1 3644 PLA 1.00.
REASON To ensure that the development would result in additional traffic flows to and from the site to the detriment of the residential amenity of neighbouring occupiers, in accordance with Policies AM2 & OE1 of the Hillingdon Local Plan: Part Two Saved UDP Policies (November 2012).
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Former Cape Boards Site, Iver Lane, Cowley: 751/APP/2013/266Appendix | 29 pages | DownloadRead as text |
Follow Central & South Planning Committee at Hillingdon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 May 2021 | To sign and receive the minutes of the previous meeting dated 7 April 2021That the minutes of the meeting dated 7 April 2021 be approved as an accurate record subject to an amendment to indic... | Approved | Open |
| 4 May 2021 | 2 De Salis Road, Hillingdon - 38071/APP/2020/36391) That the application be refused; and 2) That delegated authority be granted to the Head of Planning to explore the... | Refused | Open |
| 4 May 2021 | 43 Sweetcroft Lane, Hillingdon - 17412/APP/2021/5991) That the application be refused; and 2) That delegated authority be granted to the Head of Planning, in consultati... | Refused | Open |
| 4 May 2021 | Heinz Wolff Building, Brunel University - 532/APP/2021/330That the application be approved. That the application be approved. | Approved | Open |
| 4 May 2021 | Harmondsworth Landfill Site, Harmondsworth Lane - 43155/APP/2020/4267That the application be approved. 1) That delegated authority be granted to the Head of Planning to reword Point 2 on... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.