CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Hillingdon
Central & South Planning Committee, Thursday 27 November 2014 at 7.00pm

Brunel University, Kingston Lane, Hayes 532/APP/2014/2161

Approved Planning 1 paper

Central & South Planning Committee approved this item on Thursday 27 November 2014. Below is the council's own wording, with the papers it was decided on.

Item147

Resolved

Resolved - That the application be approved, subject to the conditions and informatives set out in the officer's report and an additional SUDS condition, the wording to be agreed by the Chairman and Labour Lead.
Word for word from the decision Hillingdon published for this meeting. Source: modgov.hillingdon.gov.uk

Follow this further

Built from Hillingdon's papers

What the report saysPro

Report to Central & South Planning Committee, 12 pages

Report of the Head of Planning, Sport and Green Spaces

Address BRUNEL UNIVERSITY KINGSTON LANE HILLINGDON

Development: Installation of 52 additional parking spaces

LBH Ref Nos: 532/APP/2014/2161

Drawing Nos: 1443/5 Flood Risk Assessmen Planning Statement (Area 1 1443/09

Date Plans Received: 19/06/2014 Date(s) of Amendment(s): 19/06/2014 Date Application Valid: 25/06/2014 1. SUMMARY The application seeks planning permission for the installation of 52 additional parking spaces. The requirement for additional parking spaces has been identified as a result of the loss of 111 parking spaces arising from the proposal to construct the BCAST facility in the south-west corner of the campus.

The application is one of three applications submitted for consideration to provide the additional spaces, with this application providing 52 of the 113 spaces required throughout the campus.

The principle of the provision of the 52 parking spaces is considered acceptable and subject to appropriate landscaping conditions, is considered not to detract from the character and local distinctiveness of the surrounding natural and built environment which lies within the Green Belt. Furthermore the proposals are considered acceptable on flooding grounds and would not have any adverse impact upon residential amenity. 2. RECOMMENDATION APPROVAL subject to the following:

1 COM3 Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

REASON To comply with Section 91 of the Town and Country Planning Act 1990.

2 COM4 Accordance with Approved Plans The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 1443/5,1443/09, Flood Risk Assessment and Planning Statement (Area 1) and shall thereafter be retained/maintained for as long as the development remains in existence.

REASON To ensure the development complies with the provisions Hillingdon Local Plan: Part Two

Central & South Planning Committee - 27th November 2014 PART 1 - MEMBERS, PUBLIC & PRESS Saved UDP Policies (November 2012) and the London Plan (July 2011).

3 COM8 Tree Protection No site clearance or construction work shall take place until the details have been submitted to, and approved in writing by, the Local Planning Authority with respect to:

1. A method statement outlining the sequence of development on the site including demolition, building works and tree protection measures.

2. Detailed drawings showing the position and type of fencing to protect the entire root areas/crown spread of trees, hedges and other vegetation to be retained shall be submitted to the Local Planning Authority for approval. No site clearance works or development shall be commenced until these drawings have been approved and the fencing has been erected in accordance with the details approved. Unless otherwise agreed in writing by the Local Planning Authority such fencing should be a minimum height of 1.5 metres.

Thereafter, the development shall be implemented in accordance with the approved details. The fencing shall be retained in position until development is completed. The area within the approved protective fencing shall remain undisturbed during the course of the works and in particular in these areas: 2.a There shall be no changes in ground levels; 2.b No materials or plant shall be stored; 2.c No buildings or temporary buildings shall be erected or stationed. 2.d No materials or waste shall be burnt; and. 2.e No drain runs or other trenches shall be dug or otherwise created, without the prior written consent of the Local Planning Authority.

REASON To ensure that trees and other vegetation can and will be retained on site and not damaged during construction work and to ensure that the development conforms with Policy BE38 of the Hillingdon Local Plan: Part Two Saved UDP Policies (November 2012).

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Brunel University, Kingston Lane, Hayes 532/APP/2014/2161Report 12 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

9 of 18 attended
IE
Councillor Ian EdwardsChair, present
DY
Councillor David YarrowVice-Chair, present
RC
Councillor Roy ChamdalCommittee Member, present
AC
Councillor Alan ChapmanCommittee Member, present
JD
Councillor Jazz DhillonLabour Lead, present
JD
Councillor Janet DuncanCommittee Member, present
MK
Councillor Manjit KhatraCommittee Member, present
BS
Councillor Brian SteadCommittee Member, present
SW
Councillor Shehryar WallanaCommittee Member, present
GO
Gill OswellSecretary, expected
CF
Charles FrancisSecretary, expected
DW
Danielle WatsonSecretary, expected

All 18 on the meeting page

On this subject at Hillingdon

Search all
  1. Brunel University, Kingston Lane, Hayes 532/APP/2014/2161This decision
  2. Heinz Wolff Building, Brunel University - 532/APP/2021/330Approved
  3. Brunel University Playing Fields - 532/APP/2020/1978Approved
  4. Quad North Building, Brunel University, Kingston Lane - 532/APP/2020/1852Approved
  5. Quad North Building, Brunel University, Kingston Lane, Hillingdon - 532/APP/2020/590Approved
  6. Gaskell Building, Brunel University - 532/APP/2019/3271Approved

More from Hillingdon Central & South Planning Committee

All decisions
MeetingDecisionOutcome
4 May 2021 To sign and receive the minutes of the previous meeting dated 7 April 2021That the minutes of the meeting dated 7 April 2021 be approved as an accurate record subject to an amendment to indic... Approved Open
4 May 2021 2 De Salis Road, Hillingdon - 38071/APP/2020/36391) That the application be refused; and 2) That delegated authority be granted to the Head of Planning to explore the... Refused Open
4 May 2021 43 Sweetcroft Lane, Hillingdon - 17412/APP/2021/5991) That the application be refused; and 2) That delegated authority be granted to the Head of Planning, in consultati... Refused Open
4 May 2021 Heinz Wolff Building, Brunel University - 532/APP/2021/330That the application be approved. That the application be approved. Approved Open
4 May 2021 Harmondsworth Landfill Site, Harmondsworth Lane - 43155/APP/2020/4267That the application be approved. 1) That delegated authority be granted to the Head of Planning to reword Point 2 on... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies