Resolved
RESOLVED - That the application be approved as per officer's recommendation.
Central & South Planning Committee approved this item on Wednesday 30 August 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED - That the application be approved as per officer's recommendation.
Report of the Head of Planning, Sport and Green Spaces
Address LECTURE CENTRE, BRUNEL UNIVERSITY KINGSTON LANE HILLINGDON
Development: Change of office administration room to coffee shop involving removal of existing plasterboard wall and reconfiguration; removal of section of existing external glazed wall and replacement with new glazed double doors; re- positioning of existing internal glazed double doors; formation of new single glazed door within rear lobby space; installation of new internally fixed illuminated signage LBH Ref Nos: 532/APP/2017/1493
Drawing Nos: DWG003224 03 Shell Specification DWG003224 06 Demolition Layout DWG003224 09 Rev A Partition layout DWG003224 11 Rev B Finishes & details DWG003224 15 Rev A Floor & Skirting DWG003224 18 Rev A Reflective Ceiling Plan DWG003224 19 Rev A Front & Back Counters DWG003224 20 Rev C Front Bulkhead Shelving DWG003224 21 Rev A Back Counter Wall Cupboards DWG003224 28 Rev A Glazed Entrance Doors KH136-LC-E03 - Lecture Centre Coffee Shop Fire Ala KH136-LC-M01 - Lecture Centre Coffee Shop Heating KH136-LC-M02 - Lecture Centre Coffee Shop Hot & Co KH136-LC-M03 - Lecture Centre Coffee Shop Above G KH136 BU Lecture Centre Elec Spec Rev T 0 KH136 BU Lecture Mech Spec Rev T0 DWG003224 39 Illuminated Sign(1) KH136-LC-E01 - Lecture Centre Coffee Shop Lighting Lecture Centre Design & Access Statement DWG003224 01 Rev D GA(1) OS Location Plan. KH136-LC-E02 - Lecture Centre Coffee Shop Small Po
Date Plans Received: 25/04/2017 Date(s) of Amendment(s): Date Application Valid: 27/04/2017 1. SUMMARY Planing permission is sought for the refurbishment of part of the ground floor of the Grade 2 listed Lecture Theatre building, currently used as administrative ofices, for use as a new coffee shop facility, at the heart of the Brunel University campus.
No objections are raised to the use of this part of the building for class A3 use, as this facility would serve and remain ancillary to the main use of the campus as an educational establishment.
The works would not increase the developed area of the campus, and it is not considered given the modest scale of the proposals, which are mainly internal, that the works would have a greater impact on the openness of the Green Belt in this location.
Central & South Planning Committee - 30th August 2017 PART 1 - MEMBERS, PUBLIC & PRESS The limited works to the external fabric of the building would complement the character and amenity of the area and harmonise with the scale, form, architectural composition and proportions of the original building.
The majority of the works involve internal alterations which are dealt with under a separate Listed Building Consent application elsewhere on this agenda. The limited external works are considered acceptable and would not be detrimental to the setting of the listed building.
Signage is dealt with under separate applications for advertisement consent and listed building consent.
Approval is recommended accordingly, subject to conditions. 2. RECOMMENDATION APPROVAL subject to the following:
1 COM3 Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
REASON To comply with Section 91 of the Town and Country Planning Act 1990. 2 COM4 Accordance with Approved Plans The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers OS Location Plan KH136-LC-E02 DWG003224 01 Rev D DWG003224 03 Shell Specification DWG003224 06 Demolition Layout DWG003224 09 Rev A Partition layout. DWG003224 11 Rev B Finishes & details DWG003224 28 Rev A Glazed Entrance Doors DWG003224 39 Rev. A Illuminated Sign
and shall thereafter be retained/maintained for as long as the development remains in existence.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Lecture Centre, Brunel University, Kingston Lane: 532/APP/2017/1493Report | 13 pages | DownloadRead as text |
Follow Central & South Planning Committee at Hillingdon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 May 2021 | To sign and receive the minutes of the previous meeting dated 7 April 2021That the minutes of the meeting dated 7 April 2021 be approved as an accurate record subject to an amendment to indic... | Approved | Open |
| 4 May 2021 | 2 De Salis Road, Hillingdon - 38071/APP/2020/36391) That the application be refused; and 2) That delegated authority be granted to the Head of Planning to explore the... | Refused | Open |
| 4 May 2021 | 43 Sweetcroft Lane, Hillingdon - 17412/APP/2021/5991) That the application be refused; and 2) That delegated authority be granted to the Head of Planning, in consultati... | Refused | Open |
| 4 May 2021 | Heinz Wolff Building, Brunel University - 532/APP/2021/330That the application be approved. That the application be approved. | Approved | Open |
| 4 May 2021 | Harmondsworth Landfill Site, Harmondsworth Lane - 43155/APP/2020/4267That the application be approved. 1) That delegated authority be granted to the Head of Planning to reword Point 2 on... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.