Resolved
That the application be approved. That the application be approved .
Central & South Planning Committee approved this item on Wednesday 2 October 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
That the application be approved. That the application be approved .
Report of the Head of Planning, Transportation and Regeneration
Address 7 ROUNDWOOD AVENUE STOCKLEY PARK MIDDLESEX
Development: Alterations including a vehicle access road, replacement plant, installation of bike storage, new pedestrian pathway, external lighting, landscaping, new entrance door and associated works LBH Ref Nos: 37203/APP/2019/1699
Drawing Nos: 541-DT-60-BP-002 Rev P03 541-DT-60-LP-001 Rev P03 541-DT-60-LD-001 Rev P03 541-EL-42-ZZ-004 Rev CO3 541-EL-42-ZZ-001 Rev CO3 3280-1100-T-002 Rev C 3280-1100-T-003 Rev C 541-EL-42-ZZ-002 C02 541-EL-42-ZZ-003 C02 541-DT-60-00-002 P01 541-DT-60-01-002 P01 541-DT-60-BS-001 P01 541-DT-60-RP-002 P01 541-DT-60-00-001 P01 541-DT-60-01-001 P01 Design and Access Statement 541-DT-60-OS-001 P02 541-DT-60-BP-001 P02 541-DT-60-RP-001 P01
Date Plans Received: 20/05/2019 Date(s) of Amendment(s): 20/05/2019 Date Application Valid: 20/05/2019 10/07/2019
1. SUMMARY The application concerns 7 Roundwood, a large office building within Stockley Park. The property has been vacant since February 2018 (the applicant says, as of early September 2019, that they have strong interest from an occupier and are keen to progress and complete the proposed refurbishment works as soon as possible). The refurbishment works include alterations to building, comprising new transoms to existing spandrel panel, removing all existing metal mesh balustrade panels and replacement with glass balustrade, new horizontal support structure back to columns, and removal of gantry and brise soleil. New vehicle access road from Longwalk Road and reconfiguration of car parking spaces. Construction of a bike shelter. Replacement plant at roof level. Paved pedestrian pathway. External lighting on the facade of the building. A number of the large office buildings within Stockley Park are not within the green belt. However there are large swathes of landscaping surrounding the buildings which are within the green belt and are considered to serve an important strategic purpose in ensuring the office park remains sympathetic in its relationship to surrounding green belt land. These landscaped areas inter-connect with larger parcels of green belt land. Only the proposed access re-configuration involves green belt land.
Central & South Planning Committee - PART 1 - MEMBERS, PUBLIC & PRESS The proposed new access onto Longwalk Road involves a very small section of hardstanding less than 10m in length across a section of land classified as green belt, but which visually reads as more connected to the grounds of the office. The land involved is a slither of landscaping along the site frontage which has a different visual apearance, due to its maintenace regime, than some of the larger sections of green belt which have a semi-natural appearance and involve lakes and more ecologically rich land (the affected land has no ecological value other than the loss of a small section of hedgerow). It is understood that the need for the new access was identified as part of a review of the building as to what was considered neccessary as part of a suite of works to bring the office back into viable use. The highways team raise no objection to the application. The new access will create an in/out access system and drop-off area at the entrance that will improve the approach to the building and provide a safer and more efficient access arrangement than at present. The new access is considered to have minmimal impact of the openess of the green belt and minimal impact on the visual appearance of the wider office park, mainly because the access point involves a very small slither of heavily maintained landscaping.
The proposals are considered to be acceptable as regards green belt impact and will facilitate a large vacant office building being brought back into use. 2. RECOMMENDATION APPROVAL subject to the following:
1 COM3 Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
7 Roundwood Avenue, Stockley Park: 37203/APP/2019/1699Report | 14 pages | DownloadRead as text |
Follow Central & South Planning Committee at Hillingdon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 May 2021 | To sign and receive the minutes of the previous meeting dated 7 April 2021That the minutes of the meeting dated 7 April 2021 be approved as an accurate record subject to an amendment to indic... | Approved | Open |
| 4 May 2021 | 2 De Salis Road, Hillingdon - 38071/APP/2020/36391) That the application be refused; and 2) That delegated authority be granted to the Head of Planning to explore the... | Refused | Open |
| 4 May 2021 | 43 Sweetcroft Lane, Hillingdon - 17412/APP/2021/5991) That the application be refused; and 2) That delegated authority be granted to the Head of Planning, in consultati... | Refused | Open |
| 4 May 2021 | Heinz Wolff Building, Brunel University - 532/APP/2021/330That the application be approved. That the application be approved. | Approved | Open |
| 4 May 2021 | Harmondsworth Landfill Site, Harmondsworth Lane - 43155/APP/2020/4267That the application be approved. 1) That delegated authority be granted to the Head of Planning to reword Point 2 on... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.