CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Hillingdon
Central & South Planning Committee, Wednesday 2 October 2019 at 7.00pm

7 Roundwood Avenue, Stockley Park - 37203/APP/2019/1699

Approved Planning 1 paper

Central & South Planning Committee approved this item on Wednesday 2 October 2019. Below is the council's own wording, with the papers it was decided on.

Item62

Resolved

That the application be approved. That the application be approved .
Word for word from the decision Hillingdon published for this meeting. Source: modgov.hillingdon.gov.uk

Follow this further

Built from Hillingdon's papers

What the report saysPro

Report to Central & South Planning Committee, 14 pages

Report of the Head of Planning, Transportation and Regeneration

Address 7 ROUNDWOOD AVENUE STOCKLEY PARK MIDDLESEX

Development: Alterations including a vehicle access road, replacement plant, installation of bike storage, new pedestrian pathway, external lighting, landscaping, new entrance door and associated works LBH Ref Nos: 37203/APP/2019/1699

Drawing Nos: 541-DT-60-BP-002 Rev P03 541-DT-60-LP-001 Rev P03 541-DT-60-LD-001 Rev P03 541-EL-42-ZZ-004 Rev CO3 541-EL-42-ZZ-001 Rev CO3 3280-1100-T-002 Rev C 3280-1100-T-003 Rev C 541-EL-42-ZZ-002 C02 541-EL-42-ZZ-003 C02 541-DT-60-00-002 P01 541-DT-60-01-002 P01 541-DT-60-BS-001 P01 541-DT-60-RP-002 P01 541-DT-60-00-001 P01 541-DT-60-01-001 P01 Design and Access Statement 541-DT-60-OS-001 P02 541-DT-60-BP-001 P02 541-DT-60-RP-001 P01

Date Plans Received: 20/05/2019 Date(s) of Amendment(s): 20/05/2019 Date Application Valid: 20/05/2019 10/07/2019

1. SUMMARY The application concerns 7 Roundwood, a large office building within Stockley Park. The property has been vacant since February 2018 (the applicant says, as of early September 2019, that they have strong interest from an occupier and are keen to progress and complete the proposed refurbishment works as soon as possible). The refurbishment works include alterations to building, comprising new transoms to existing spandrel panel, removing all existing metal mesh balustrade panels and replacement with glass balustrade, new horizontal support structure back to columns, and removal of gantry and brise soleil. New vehicle access road from Longwalk Road and reconfiguration of car parking spaces. Construction of a bike shelter. Replacement plant at roof level. Paved pedestrian pathway. External lighting on the facade of the building. A number of the large office buildings within Stockley Park are not within the green belt. However there are large swathes of landscaping surrounding the buildings which are within the green belt and are considered to serve an important strategic purpose in ensuring the office park remains sympathetic in its relationship to surrounding green belt land. These landscaped areas inter-connect with larger parcels of green belt land. Only the proposed access re-configuration involves green belt land.

Central & South Planning Committee - PART 1 - MEMBERS, PUBLIC & PRESS The proposed new access onto Longwalk Road involves a very small section of hardstanding less than 10m in length across a section of land classified as green belt, but which visually reads as more connected to the grounds of the office. The land involved is a slither of landscaping along the site frontage which has a different visual apearance, due to its maintenace regime, than some of the larger sections of green belt which have a semi-natural appearance and involve lakes and more ecologically rich land (the affected land has no ecological value other than the loss of a small section of hedgerow). It is understood that the need for the new access was identified as part of a review of the building as to what was considered neccessary as part of a suite of works to bring the office back into viable use. The highways team raise no objection to the application. The new access will create an in/out access system and drop-off area at the entrance that will improve the approach to the building and provide a safer and more efficient access arrangement than at present. The new access is considered to have minmimal impact of the openess of the green belt and minimal impact on the visual appearance of the wider office park, mainly because the access point involves a very small slither of heavily maintained landscaping.

The proposals are considered to be acceptable as regards green belt impact and will facilitate a large vacant office building being brought back into use. 2. RECOMMENDATION APPROVAL subject to the following:

1 COM3 Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
7 Roundwood Avenue, Stockley Park: 37203/APP/2019/1699Report 14 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 17 attended
IE
Councillor Ian EdwardsChair, present
RC
Councillor Roy ChamdalVice-Chair, present
SA
Councillor Shehryar Ahmad-WallanaCommittee Member, present
MB
Councillor Mohinder BirahCommittee Member, present
NB
Councillor Nicola BrightmanCommittee Member, present
AC
Councillor Alan ChapmanCommittee Member, apologies, sent representative
JD
Councillor Jazz DhillonCommittee Member, apologies, sent representative
JD
Councillor Janet DuncanLabour Lead, present
ST
Councillor Steve TuckwellCommittee Member, apologies, sent representative
VU
Victor UnuigbeOfficer, expected
RP
Richard PhillipsOfficer, expected
AA
Armid AkramOfficer, in attendance

All 17 on the meeting page

On this subject at Hillingdon

Search all
  1. 7 Roundwood Avenue, Stockley Park - 37203/APP/2019/1699This decision
  2. 6 Roundwood Avenue - 37403/APP/2018/4475Approved
  3. Building B5, 4 Roundwood Avenue, Stockley Park - 37205/APP/2014/3056Decided
  4. Building B5, 4 Roundwood Avenue, Stockley Park - 37205/APP/2014/3056Approved

More from Hillingdon Central & South Planning Committee

All decisions
MeetingDecisionOutcome
4 May 2021 To sign and receive the minutes of the previous meeting dated 7 April 2021That the minutes of the meeting dated 7 April 2021 be approved as an accurate record subject to an amendment to indic... Approved Open
4 May 2021 2 De Salis Road, Hillingdon - 38071/APP/2020/36391) That the application be refused; and 2) That delegated authority be granted to the Head of Planning to explore the... Refused Open
4 May 2021 43 Sweetcroft Lane, Hillingdon - 17412/APP/2021/5991) That the application be refused; and 2) That delegated authority be granted to the Head of Planning, in consultati... Refused Open
4 May 2021 Heinz Wolff Building, Brunel University - 532/APP/2021/330That the application be approved. That the application be approved. Approved Open
4 May 2021 Harmondsworth Landfill Site, Harmondsworth Lane - 43155/APP/2020/4267That the application be approved. 1) That delegated authority be granted to the Head of Planning to reword Point 2 on... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies