That this application be approved subject to the addition of a standard Condition confirming that, if any of the proposed equipment were to become redundant in the future, it would be removed. That this application be approved subject to the addition of a standard Condition confirming that, if any of the proposed equipment were to become redundant in the future, it would be removed.
Word for word from the decision Hillingdon published for this meeting.Source: modgov.hillingdon.gov.uk
Report of the Head of Planning, Transportation and Regeneration
Address LAND FRONTING RENAISSANCE HOTEL BATH ROAD HARLINGTON
Development: The installation of a 20m monopole, 12 antenna apertures, 7 equipment cabinets and the removal of the existing 14.7m monopole, 3 antennas, 5 redundant equipment cabinets and development ancillary thereto LBH Ref Nos: 57699/APP/2020/968
Drawing Nos: 305 Issue A (Equipment Schedule & Support Structure Details) ICNIRP Certificate Beacon Communications Covering Letter dated 19/3/20 Highway Notice dated 17/3/20 Article 13 Notice Beacon Communications Supplementary Information Beacon Communicatons Pre-application Consultation Letter dated 18/2/20 Beacon Communication Supplementary Information Dept. for Digital, Culture, Media and Sport and Ministry of Housing, Coummunity & Local Govt. - Collaborating for Digital Connectivity letter dated 7/3/19 MBNL Letter - 5G and Future Technology Councils and Connectivity Letter, September 2018 5G and Health: Quesrtions and Answers Information Paper, May 2019 Dept. for Digital, Culture, Media and Sport - Connected Growth Manua Dept. for Digital, Culture, Media and Sport - 5G - The Next Mobile Generatio Letter (Matt Warman MP) 265 Issue A (Max Configuration Elevation 100 Issue A (Existing Site Plan) 215 Issue A (Max Configuration Site Plan 150 Issue A (Existing Site Elevation) 002 Issue A (Site Location Plan)
Date Plans Received: 19/03/2020 Date(s) of Amendment(s): Date Application Valid: 19/03/2020 1. SUMMARY The applicant seeks permission to upgrade an existing telecommunication site with the installation of a 20m high monopole, 12 antenna apertures and 7 equipment cabinets and associated ancillary development. The proposal is required to provide an upgraded 5G network.
The proposed scheme involves the removal of an existing 14.7m high telecommunications monopole and 5 redundant equipment cabinets (retaining 2).
The proposed scheme would not result in a detrimental impact on the character and appearance of the street scene and would not cause harm to pedestrian or highway safety and no airport safeguarding objections have been raised. The proposed development is therefore considered to comply with Policies DMHB 11, DMHB 21, DMT 1, DMT 2 and DMAV 1 of the Hillingdon Local Plan: Part Two - Development Management Policies (January 2020) and Chapter 10 of the National Planning Policy Framework
Central & South Planning Committee - 1st July 2020 PART 1 - MEMBERS, PUBLIC & PRESS (February 2019).
It is therefore recommended that permission is granted. 2. RECOMMENDATION APPROVAL subject to the following:
1 COM3 Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
REASON To comply with Section 91 of the Town and Country Planning Act 1990. 2 COM4 Accordance with Approved Plans The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 002 Issue A (Site Location Plan), 215 Issue A (Max. Configuration Site Plan), 265 Issue A (Max. Configuration Elevation) and 305 Issue A (Equipment Schedule & Support Structure Details) and shall thereafter be retained/maintained for as long as the development remains in existence.
REASON To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (November 2012) and 2 (January 2020) and the London Plan (2016). 3 NONSC Non Standard Condition Notwithstanding the submitted plans, no development shall take place until details of colours of external surfaces and a maintenance plan have been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be constructed and maintained in accordance with the approved details and be retained as such.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.