Resolved
That the application be approved subject to section 106, conditions as set out in the report and the information in the addendum.
AI summaryHillingdon Planning Committee approved the Heathrow application for works enabling full runway alternation during easterly departures, subject to section 106, report conditions and the addendum [D] [P4]. QNS sets a £34,000 per dwelling limit, adjusted for inflation [P84] [P85].
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Resolved
That the application be approved subject to section 106, conditions as set out in the report and the information in the addendum.
Appendix A Heathrow Vibration Report
© Heathrow Airport Limited 2023 iii LBH Noise Response Classification : Public
1. Introduction
1.1.1 This document provides a response to questions received from LB Hillingdon on 24 June 2025 in a document which formed a review of the Noise impacts of the planning application for works to enable full runway alternation when operating easterly departures. In particular, the document provided a review of the Noise chapter and appendices provided as part of the Environmental Statement accompanying Heathrow’s application for those works, which was submitted in October 2024.
1.1.2 The Borough Council’s review raised 31 ‘Questions / Clarifications’ and these are responded to one by one in the table set out in Section 2.
© Heathrow Airport Limited 2023 1.1 LBH Noise Response Classification : Public
2. Response to LB Hillingdon review
ID LBH Question/Clarification Heathrow Response
1 Construction: Construction The night-time assessment period for identifying potential significant effects in the ‘ABC method’ of BS5228-11 is Noise: Noise Metrics: It is 23:00 – 07:00 (8 hours) as shown in Section E.3.2 / Table E.1 and reproduced in Table 7.12 of the ES. This noted that the time periods assessment methodology has been supplemented with 5.5 hour assessment period of 23:00 – 04:30 to reflect the proposed for the LAeq,T period when night-time construction works are forecast to occur based on the indicative construction programme and assessments do not align working methods. This is also the period of the night during which there is reduced aircraft activity and hence the use with the BS 5228-1 time of a reduced 5.5 hour assessment period is considered a conservative approach. periods so it is Section E.4 / Table E.2 of BS5228-1 includes a 1 hour averaging period, however this is in the context of “thresholds recommended that this is used to determine the eligibility for noise insulation and temporary rehousing”, rather than in the context of identifying amended (e.g. LAeq,5.5hr for significant effects. At the planning stage the level of detail in working methods was not, and is still not, sufficiently night-time should be detailed to allow for 1-hour assessments. Heathrow propose that construction noise is managed through a Section 61 replaced by LAeq,1hr). process overseen by London Borough of Hillingdon (LBH) under the Control of Pollution Act 1974, which will allow a more granular assessment of any necessary mitigation to be developed by agreement at that time.
2 Construction: Construction As noted in paragraph 7.5.23 of the ES, where likely significant effects are identified, the number of receptors affected Noise: Assessment is “discussed to provide context to the effects”. The number of receptors affected provides important context to the Methodology: Paragraph scale of the identified effect. It has not been used to alter the reported significance of the effect. 7.5.23 infers that the “number of receptors affected” could alter the significance of the effect which requires clarification as to why.
1 British Standards Institution (2014). BS 5228-1:2009+A1:2014 Code of practice for noise and vibration control on construction and open sites: Part 1 –
Noise. London: BSI.
© Heathrow Airport Limited 2023 2.1 LBH Noise Response Classification : Public
ID LBH Question/Clarification Heathrow Response
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
HAL Response to Noise Questions with Temple CommentsReport | 44 pages | DownloadRead as text |
PDF |
HAL responses to LBH Noise QuestionsReport | 18 pages | Download |
PDF |
Heathrow Airport: 41573/APP/2024/2838Report | 192 pages | Download |
PDF |
Heathrow Response on mitigation proposedReport | 9 pages | Download |
PDF |
Heathrow Response to LB EalingReport | 14 pages | Download |
PDF |
Heathrow Response to LB HounslowReport | 23 pages | Download |
PDF |
LBH Noise Comments with questionsReport | 17 pages | Download |
Follow Hillingdon Planning Committee at Hillingdon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 17 Nov 2026 | Apologies for absenceThere were no apologies for absence. | Decided | Open |
| 17 Nov 2026 | Declarations of Interest in matters coming before this meetingCouncillor John Garner declared a non-pecuniary interest in agenda item 6 as he had prior involvement in the applicat... | Decided | Open |
| 17 Nov 2026 | To receive the minutes of the meetings on 6 October 2026 and 14 October 2026That the minutes from the meetings on 6 October 2026 and 14 October 2026 be confirmed as an accurate record. That the... | Decided | Open |
| 17 Nov 2026 | Matters that have been notified in advance or urgentNone. | Decided | Open |
| 17 Nov 2026 | To confirm that the items of business marked Part I will be considered in Public and the items marked Part II will be considered in PrivateIt was confirmed that all items would be heard in Part I. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.