CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Hillingdon
Hillingdon Planning Committee, Tuesday 16 December 2025 at 7.00pm

78 High Street, Northwood - 32265/APP/2025/280

Approved Planning 1 paper

AI summaryHillingdon Planning Committee approved three new homes at 78 High Street and changes to the flat above the shop, with the rear workshop buildings demolished. [D] [1.1] Permission is subject to conditions in the report and addendum. [D]

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedThree new homes and changes to the existing flat [1.1]
MoneyNot stated
What happens nextConditions must be met [D]Some apply before commencement or occupation [7.64] [P80]
Who it affectsFour homes and retained shop [1.1] [P26] [7.9]Existing flats, Beeches House and town centre [7.28] [7.33] [7.9]

What was decided

The application was approved subject to the conditions set out in the report and the addendum. [D]

The permission covers demolition of the rear workshop buildings and construction of three new homes, with private amenity space, landscaping, cycle and refuse storage. [1.1] [3.1] It also covers alterations and a two storey rear extension to the existing building, internal changes to the first floor flat and a rear dormer window. [1.1] Report 1.1, 3.1

The scheme provides four homes in total: the modified flat above the shop, a two bedroom flat, a one bedroom flat and a three bedroom house. [P26] Report P26

Why

Objections included petitions with 58 and 22 signatures and eleven individual representations. [1.2] Officers found that the amended scheme complied with the Development Plan and no material consideration justified refusal. [P6] Report 1.2, P6

The scheme was considered an appropriate design response that preserved the Old Northwood Area of Special Local Character. [7.26] All four homes met or exceeded space standards, and significant harm to neighbouring amenity was not expected. [7.39] [1.5] Report 7.26, 7.39, 1.5

The main retail unit would remain viable. [7.9] The car free scheme was accepted because of the town centre location, transport access and the view that parking spilling into nearby streets was unlikely. [7.51] [7.54] [7.59] Report 7.9, 7.51, 7.54, 7.59

What happens next

Require a full Construction Management Plan through a condition to minimise harm to surrounding roads and public areas, noise and emissions. [7.58] [7.62] [P76] Also require details of the external materials through a condition. [7.25] [P77] Report 7.58, 7.62, P76, 7.25, P77

Provide step free access. [7.64] [P78] Certify compliance with M4(2), the accessible and adaptable dwellings standard, before occupation. [7.64] [P78] Report 7.64, P78

Before commencement, submit a desktop study, site investigation and written method statement for contaminated land. [P80] Prevent conversion of the three bedroom family home to a small house in multiple occupation without express planning permission. [7.14] Report P80, 7.14

Options considered

  • Chosen: Approve subject to conditions. The amended scheme was found to comply with the Development Plan and no material consideration justified a contrary decision. [D] [P6] Report P6
  • Rejected: Refuse the application. The objections and petitions were considered, but officers concluded that the amended scheme complied with the Development Plan and should be approved. [1.2] [1.4] [P6] Report 1.2, 1.4, P6

Implications

  • Financial: The rear workshop, store and kitchen floor space would be lost, but the main shop unit would keep its street frontage and remain viable. [7.6] [7.8] [7.9] Report 7.6, 7.8, 7.9
  • Legal: Approval grants full planning permission, but the scheme remains subject to the conditions in the report and addendum. [1.1] [D] Report 1.1
  • Equalities: Step free access must be secured. [7.64] [P78] Compliance with M4(2) must be certified before occupation. [7.64] [P78] Report 7.64, P78
  • Climate: The car free scheme is expected to encourage sustainable travel, and secure cycle storage is provided. [7.55] [7.56] Report 7.55, 7.56
  • Risk: The site lies in a Critical Drainage Area, where policy requires flood risk management, and on potentially contaminative former land. [2.2] [7.65] Contamination documents are required before commencement. [P80] Report 2.2, 7.65, P80
  • Risk: The Highway Authority found no measurable highway safety concerns and considered parking spilling into nearby streets unlikely. [7.48] [7.54] [7.59] Report 7.48, 7.54, 7.59
  • Other: Future residents cannot apply for a parking permit, which is a significant constraint on car ownership. [7.53] [7.55] Report 7.53, 7.55
  • Other: The scheme adds a net three homes, and a condition prevents the three bedroom family home becoming a small house in multiple occupation without express permission. [7.10] [7.14] [P26] Report 7.10, 7.14, P26

Who and where

  • Future residents of the four homes [1.1] [P26] Report 1.1, P26
  • Occupiers of flats at 76 and 80 High Street [7.28] [7.33] Report 7.28, 7.33
  • Occupiers of Beeches House [7.28] [7.30] Report 7.28
  • The ground floor shop tenant and businesses in the Northwood High Street Local Parade [7.8] [7.9] Report 7.8, 7.9
  • Existing users of informal parking beside the shop [P69] Report P69
  • Northwood Residents Association and the local Ward Councillor [1.2] [P70] Report 1.2, P70
  • People using the immediate road network during construction [7.58] [7.62] Report 7.58, 7.62
  • Local highway users [7.52] [7.55] Report 7.52, 7.55

Timeline

  • 14th October 2021 and 1st June 2022: Earlier full planning applications for redevelopment were refused. [4.4] [4.6] Report 4.4, 4.6
  • August 2024: Pre application advice was sought on a similar scheme, raising concerns about a communal rooftop garden and accommodation quality. [4.8] [P53] Report 4.8, P53
  • 21st February 2025 to 14th March 2025: The initial consultation took place and a petition with 58 signatures was received. [6.1] [P66] Report 6.1, P66
  • 29th October 2025 to 19th November 2025: Further consultation on revised drawings took place, followed by a petition with 22 signatures. [6.2] [P66] Report 6.2, P66
  • 4th November 2025 to 25th November 2025: A third consultation followed the revised application description. [6.4] Report 6.4
  • 13th November 2025: A revised drawing added a ground floor WC to the shop unit plan. [6.4] Report 6.4
  • 4th December 2025: A revised drawing addressed minor discrepancies between the plans, with no further consultation considered necessary. [6.4] Report 6.4
  • 16th December 2025: Hillingdon Planning Committee approved the application subject to conditions in the report and addendum. [D] [P6] Report P6

Plain English for the jargon

  • Use Class C3: The report's use class for the new residential units. [1.1] [3.1]
  • Use Class E: The report's use class for the existing retail unit and rear workshop buildings. [1.1] [2.1]
  • Old Northwood ASLC: Area of Special Local Character, where development must preserve or enhance the features that give the area its character. [7.16]
  • PTAL: Public Transport Accessibility Level, with this site rated PTAL 2. [2.2] [7.14]
  • CMP: Construction Management Plan, used to control construction effects on the road network, public areas, noise and emissions. [7.58] [7.62]
  • M4(2): The accessible and adaptable dwellings category, which must be certified before occupation. [7.63] [7.64]
  • HMO C4: A small house in multiple occupation, which the family home cannot become without express permission. [7.14]
  • VSC and APSH: Vertical Sky Component and Annual Probable Sunlight Hours, the measures used to assess daylight and sunlight for neighbouring properties. [7.33] [7.34]
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item112

Resolved

That the application be approved subject to conditions as set out in the report and the information in the addendum.
Word for word from the decision Hillingdon published for this meeting. Source: modgov.hillingdon.gov.uk

Follow this further

Built from Hillingdon's papers

What the report saysPro

Report to Hillingdon Planning Committee, 48 pages

Executive summary

1.1The application seeks full planning permission for the demolition of the existing rear workshop buildings (Use Class E) and the construction of three new residential units (Use Class C3) with associated private amenity space, landscaping, and cycle and refuse storage, together with alterations and a two- storey rear extension to the existing building at 78 High Street, including internal layout changes to the first-floor residential flat and the installation of a rear dormer window.

1.2A petition with 58 signatures in objection to the development was received in response to the initial consultation and another petition with 22 signatures in objection to the development was received following re-consultation on amended plans. The desired outcome of the petitions is for the application to be refused. Eleven separate representations have also been received in objection to the proposal (two from the initial consultation and nine following subsequent re- consultations), as well as objections from the Northwood Residents Association and a local Ward Councillor. The main concerns raised within the representations include land ownership and boundary accuracy, the inclusion of car parking on public pavement (and the subsequent lack of parking associated with the scheme following the amendments received), potential overdevelopment of the site, and the impact on the existing ground floor retail unit at 78 High Street. A full list of the matters raised in the consultation is included within Section 6 of this report.

1.3Key planning considerations include the impact of the proposal on the character and appearance of the surrounding area, including the Old Northwood Area of Special Local Character, the quality of accommodation for future occupiers, the impact on neighbouring residential amenity, highways and parking, and environmental considerations such as flood risk, sustainability and contamination.

1.4Following the submission of amended plans, the application now proposes a car- free development with a corrected site boundary and design amendments that address earlier concerns raised by Planning Officers.

1.5The Council’s Highways Officer raises no objection to the car-free nature of the development, noting its sustainable town centre location with good access to public transport and local facilities. The proposed housing mix is considered appropriate for the site and reflective of local housing need. All units meet or exceed internal space standards and provide an acceptable level of light and outlook. Having regard to the site’s town centre context, historic plot pattern, and the high-quality design of the proposal, officers conclude that the scheme would not give rise to any significant harm to the character of the area or the amenity of adjoining occupiers. Hillingdon Planning Committee – 16th December 2025

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
78 High Street, Northwood: 32265/APP/2025/280Report 48 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 15 attended
HH
Councillor Henry HigginsChair, present
AB
Councillor Adam BennettVice-Chair, apologies
KB
Councillor Keith BurrowsCommittee Member, apologies
RC
Councillor Roy ChamdalCommittee Member, present
EG
Councillor Elizabeth GarelickCommittee Member, present
TG
Councillor Tony GillCommittee Member, present as substitute
EG
Councillor Ekta GohilCommittee Member, present
RS
Councillor Raju SansarpuriCommittee Member, apologies, sent representative
EC
Eoin ConcannonOfficer, in attendance
NF
Natalie FaircloughOfficer, in attendance
SR
Sally RobbinsOfficer, in attendance
IT
Ian ThynneOfficer, in attendance

All 15 on the meeting page

On this subject at Hillingdon

Search all
  1. 78 High Street, Northwood - 32265/APP/2025/280This decision
  2. 54 High Street, Ruislip, HA4 7AT - 14226/APP/2025/3062Approved
  3. 82-84 High Street, Ruislip - 78935/APP/2025/2287Approved
  4. Morrisons Supermarket, 41-67 High Street, Yiewsley, West Drayton 2370/APP/2023/1727Approved
  5. 148 – 154 High Street, Uxbridge - 78696/APP/2024/867Approved
  6. Application for the grant of a Premises Licence: H & H, News & Wine, 6-10, High Street, Harefield UB9 6BUAgreed

More from Hillingdon Hillingdon Planning Committee

All decisions
MeetingDecisionOutcome
17 Nov 2026 Apologies for absenceThere were no apologies for absence. Decided Open
17 Nov 2026 Declarations of Interest in matters coming before this meetingCouncillor John Garner declared a non-pecuniary interest in agenda item 6 as he had prior involvement in the applicat... Decided Open
17 Nov 2026 To receive the minutes of the meetings on 6 October 2026 and 14 October 2026That the minutes from the meetings on 6 October 2026 and 14 October 2026 be confirmed as an accurate record. That the... Decided Open
17 Nov 2026 Matters that have been notified in advance or urgentNone. Decided Open
17 Nov 2026 To confirm that the items of business marked Part I will be considered in Public and the items marked Part II will be considered in PrivateIt was confirmed that all items would be heard in Part I. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies