London Borough of Hounslow
Central Hounslow Area Forum, Tuesday 22 July 2014 at 7.30pm

Hounslow Town Centre – Improvement phase 2, High Street between its junctions with Douglas Road and School Road – Accessibility Improvements

Decided Committee 5 papers

Central Hounslow Area Forum decided this item on Tuesday 22 July 2014. Below is the council's own wording, with the papers it was decided on.

Item18

Resolved

Resolved - a) That informal and statutory consultation is undertaken with stakeholders on the proposals set out in paragraph 3.4 and in Appendix A of this report. b) That Officers be authorised, where possible, to resolve any objections received to the informal and statutory consultations and implement the scheme. c) That, in the event of any objections remaining unresolved, the Chair of the Forum be given delegated authority to determine these objections in consultation with the Ward Councillors, or alternatively to refer the scheme back to the Area Forum for decision.
Word for word from the decision Hounslow published for this meeting. Source: democraticservices.hounslow.gov.uk

Follow this further

Built from Hounslow's papers

What the report saysPro

Report to Central Hounslow Area Forum, 1 pages

2014 2014)

LEGEND 182 198 188a 188 184 162 CHARCON ANDOVER BLOCK PAVING 200 174 180 178 COLOUR: SILVER GREY 190 2.62m SILVER GREY GRANITE BLOCK 2.38m 2.78m (FLAME TEXTURED)

17.00m STREET PRINT ASPHALT TO SIMULATE 2.00m 0.50m ANDOVER MIDNIGHT GREY BLOCK PAVING

AREA OF CARRIAGEWAY SURFACE 3.95m RENEWAL 2.00m HAZARD PAVING 450x450mm 1:20 RAMP SILVER GREY GRANITE BLISTER TACTILE 3.00m PAVING AT CROSSINGS 2.50m PROPOSED 300 WIDE SILVER GREY 0.50m GRANITE KERB 3.21m 3.63m 4.12m 4.10m PROPOSED BIN

219 PROPOSED BENCH 221 217 TYPE 1

m 215 213 211 1.99m

3.00209 207 187 185 183 191 189 2.15m 201 to 205 193 to 199 PROPOSED BENCH BOOTS TYPE 2 METRO PROPOSED BENCH BANK TYPE 3

PROPOSED CYCLE RACKS

PROPOSED GRANITE BOLLARD/SEAT Bank

DOUGLAS ROAD

EXISTING TREES

TREE PIT TYPE 01 (SIZES VARY) - REFER TO JCLA DRAWING: HW007/F/D01/ETPL REVISION A

PLAN - HIGH STREET (1 OF 4) EXISTING TREE WITH TREE PIT TYPE 01/ SCALE 1:200 BENCH TYPE 3

PROPOSED TREES

PROPOSED TREE WITH TREE PIT TYPE 05 REFER TO JCLA DRAWING: HW007/F/D05/NTPL REVISION A

PROPOSED TREE WITH TREE PIT TYPE 06 142 120 REFER TO JCLA DRAWING: 122 HW007/F/D06/NTPL REVISION A

146 CURRYS 134 NATWEST 144 162 158 152 140 TREE PIT TYPE 02 4.53m (PART OF PHASE 1 WORKS)

3.23m 3.58m 3.89m 2.78m 5.46m

17.00m

TREET HIGH S 1:20 RAMP 1:20 RAMP - 02/07/2014 ORIGINAL ISSUE RL CdR TM Rev Date Description Drn Chk App This drawing has been specifically prepared to meet the requirements of the named client and may contain design and innovative features which differ from conventional design standards. 3.63m 3.77m 4.10m

147 to 161 145 183 165 to 169 163 185

FAIR STREET NEW BUS STOP IN 171

MARKS & SPENCERS EXISTING LOCATION PRIMARK (PASSENGER SHELTER WITH HALF-END PANELS)

4th Floor, Westgate House Westgate, Ealing, London W5 1YY Tel: +44 (0)20-7421-8222 PLAN - HIGH STREET (2 OF 4) Fax: +44 (0)20-7421-8199 SCALE 1:200 Email: [email removed]

The 10

Houn slow Phar m acia Client Cent re Hous e

1 to 6 blah de blah

162b Holy Trinity Church 4

162d 2

Project 162c 162a

Bank CRO W YAR N D HOUNSLOW TOWN CENTRE 230 to 236 222 PLAN 3 OF 4 - REFER TO DRAWING 1000001375-C-010-02 HIGH STREET to 110

228 220 218 216 206 PLAN 2 OF 4 142 120 54 to 66

102a 102b 108a 214 122 10 9 to

100 1 to 5 52 146

CURRYS 134 210 182 NATWEST 144 86 to 94 188a 188 158 152 140 108 106 104 200 198 184 174 162 COSTA 204 202 98 96 84 190 180 178 80 Trinity Parade

0.50m Drawing Title HIGH STREET HIGH STREET EET s HIGH STR

GENERAL ARRANGEMENT 281 to 287 261 0.50m 259 279

277 263 to 273

249 259a

239 229 to 231 227 223 147 to 161 275 221 219 217 145 3.00m

215 213 163

(SHEET 1 OF 2) 211 209 207 185 183 165 to 169 FAIR STREET

191 189 187 135 117 113 137 to 143 121 119

GILBER 171

201 to 205 133 127 129 125 193 to 199 MARKS & SPENCERS 101 to 105 BOOTS PRIMARK

111 METRO ARGOS

107 235

T STRE 115 BANK to

ET 233 75 77 79 to 83

PLAN 4 OF 4 - REFER TO DRAWING 1000001375-C-010-02 Drawing Status Bank

DOUGLAS ROAD

PH

Bank

PLAN 1 OF 4 Bank

Bank FOR INFORMATION Big Hand Mo's

Drawn Designed Date Scale Size (PH)

RL CdR 02/07/2014 1:200 A1 LOCATION PLAN 8

3 to 4

SCALE 1:1000 Wor ks Drawing No. Rev 1000001375-C-010-01 - 20

Office Registered in England No. 02625312 | 4th Floor Westgate House, Westgate, Ealing, London, W5 1YY | www.projectcentre.co.uk 4

PLOT DATE: 02/07/2014 16:01:57 | CAD REFERENCE: G:\Project Centre\CAD\00-PROJECT\1000001375\01-C-Feasibility\1000001375-C-010.dwg | Rloveridge | ----

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Hounslow Town Centre: Improvement phase 2, High Street between its junctions with Douglas Road and School Road: Accessibility Improvements: drawing 1Report 1 pages DownloadRead as text
PDF
Hounslow Town Centre: Improvement phase 2, High Street between its junctions with Douglas Road and School Road: Accessibility Improvements: drawing 2Report 1 pages Download
PDF
Hounslow Town Centre: Improvement phase 2, High Street between its junctions with Douglas Road and School Road: Accessibility Improvements: drawing 3Report 1 pages Download
PDF
Hounslow Town Centre: Improvement phase 2, High Street between its junctions with Douglas Road and School Road: Accessibility Improvements: drawing 4Report 1 pages Download
PDF
Hounslow Town Centre: Improvement phase 2, High Street between its junctions with Douglas Road and School Road: Accessibility ImprovementsReport 7 pages Download

At this meeting

Whole meeting

On this subject at Hounslow

Search all
  1. Hounslow Town Centre – Improvement phase 2, High Street between its junctions with Douglas Road and School Road – Accessibility ImprovementsThis decision
  2. CEX 457 Emissions based parking charges and business permits, and Sunday charging in off-street parking places in Hounslow Town CentreNoted
  3. Adoption of Hounslow Town Centre Neighbourhood Area and ForumNoted
  4. CEX 336 Approval of Hounslow Town Centre, Neighbourhood Area and Area forum (Councillor Steve Curran - Leader of the Council and Cabinet Member for Corporate Strategy, Planning and Regeneration)Approved
  5. Adoption of Hounslow Town Centre Neighbourhood Area & ForumNoted
  6. Hounslow Town Primary School, Pears Road, HounslowRefused

More from Hounslow Central Hounslow Area Forum

All decisions
MeetingDecisionOutcome
16 Jan 2020 Budget 2020 - Councillor Shantanu RajawatResolved : The Budget 2020-21 presentation was noted. Noted Open
16 Jan 2020 Inwood Park maintenance and security (23 signatories)The Area Forum noted the submitted petition and response. It was agreed that a copy of the response should be sent to... Noted Open
16 Jan 2020 Smoking on Hounslow High Street (63 signatories)Resolved : Following discussion on the item, members asked officers to investigate further whether consideration coul... Decided Open
16 Jan 2020 Request for zebra crossing at Heath Road in front of Maswell Park Church (23 signatories)The Area Forum noted the submitted petition together with the response from the borough’s Traffic and Transport Team.... Noted Open
27 Jun 2019 Confirmation of the Chair of Central Hounslow Area ForumThe clerk opened the meeting and sought confirmation of the appointment of Cllr Ajmer Grewal as Chair of the Central ... Decided Open