a) That planning permission for planning application 01660/B/P5 for construction of a new warehouse (B1(c)/B2/B8 uses) at Cargo Centre, Bedfont Road, Stanwell be approved, subject to the conditions set out in the report and the addendum report and the prior completion of a satisfactory S.106 agreement or unilateral undertaking, set out in section 12 of the report with heads of terms as set out in section 10.1. b) That planning permission planning application 01660/B/P6 for construction of a new warehouse (B1(c)/B2/B8 uses) at Cargo Centre, Bedfont Road, Stanwell be approved, subject to the conditions set out in the report and the addendum report and the prior completion of a satisfactory S.106 agreement or unilateral undertaking, set out in section 13 of the report with heads of terms as set out in section 10.1.
Word for word from the decision Hounslow published for this meeting.Source: democraticservices.hounslow.gov.uk
1.1The application proposes to construct a replacement warehouse building with ancillary offices, a decked car park and a link bridge connecting the site to a neighbouring building. The site is partly within the Green Belt, is a Locally Significant Industrial Site allocation and an Archaeological Prior Area.
1.2The applicant is considered to have made a sufficient case to demonstrate that very special circumstances exist to allow encroachment of the proposal into Green Belt land. The proposal would provide an enhanced and desirable industrial unit without raising significant design, amenity or parking (subject to satisfactory resolution of the issues raised by the GLA) and access concerns and would not compromise policies pertaining to environmental matters.
A resolution for the Approval of the planning applications is therefore recommended, subject to the completion of S106 agreements and referrals to the Secretary of State and the Mayor of London.
2.0SITE DESCRIPTION
2.1The application site is a 3.76 hectare plot located on the southern side of Bedfont Road immediately to the south of Heathrow Airport. Immediately to the north of the application site are three adjoining office buildings and a warehouse. To the west of the site is the Esso West London Oil Terminal. To the south of the site is the Mayfield Farm Water Treatment Works. The site is bordered to the south and the east by a line of vegetation, subject to a Tree Preservation Order (No. 17).
2.2The site is currently vacant following the demolition of a large warehouse unit (13,700m2) with ancillary offices known as Cumulus House. The associated HGV loading/unloading bays and service yards were located along the building’s northern and southern elevations. Immediately to the east of the building was a large area that was used for HGV and car parking. Along the western side of the building was a service access.
2.3Approximately 9,145m2 (24%) of the site is land designated as Green Belt which runs along its eastern boundary. The majority of the site (around 76%) is designated as a Locally Significant Industrial Site.
2.4The site has a Public Transport Accessibility Rating of 1a (very poor). There is no London Underground or National Rail station within walking distance to the site. Bus route 203 (3 buses per hour) and 555 (hourly) serve the stop approximate 100m from the site. The site is approximately 500m west of A30 Great South West Road, which forms part of the Transport for London Road Network (TLRN). 3. RELEVANT HISTORY
3.1Recent planning history includes a notification of the demolition of the previously existing warehouse building on the site (01660/B/DEM1). Prior to this, the most recent applications relate to previous developments on the site including the development of the now demolished warehouse (1054/M/P29 approved 27th March 1996).
4. DETAILS
4.1This report is applicable to both applications, with references 01660/B/P5 & 01660/B/P6. The differences in the proposals relate to the quantity of excavated earth for the foundation slab, and the resulting ground floor level of the main warehouse building. Whilst the building heights and areas are consistent across both schemes, the ‘Raised Slab’ (01660/B/P6) option results in a ground level which is 0.45 metres higher than that proposed in the ‘Lower Slab’ scheme (01660/B/P5).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.