The inability of the Environment Agency to advance a Flood Alleviation Scheme for Alconbury Weston was noted. The preferred option for the alleviation of flooding in Alconbury as detailed in the Environment Agency’s consultation document was supported in principle. That the proposal would be considered by the Council as the local Planning Authority later in the year was noted. The Head of Environment and Transport was requested to inform the Environment Agency that the scheme should be sympathetic in its design and the materials used in keeping with the character of the area.
Word for word from the decision Huntingdonshire published for this meeting.Source: democracy.huntingdonshire.gov.uk
ALCONBURY FLOOD ALLEVIATION SCHEME (Report by Head of Environment & Transport)
1. INTRODUCTION
1.1The village of Alconbury has a history of flooding and most recently 68 properties were flooded in 1998. Flooding of the roads in the village occurs during a 1 in 2 year return period flood event. The 1998 flood event had a 1 in 33 year return period. DEFRA suggests that villages should be protected against flood events with a return period of between 1 in 50 and 1 in 200 years.
1.2The Environment Agency have now published a ‘Preferred Option Consultation’ in respect of the Alconbury Flood Alleviation Scheme. The Council is invited to submit its comments on the proposal by February 2005.
1.3The Environment Agency consult stakeholders at this stage of the project so that potential adverse environmental impacts of the proposed works can be identified and avoided or mitigated. It is also an opportunity to identify enhancements that may be included in the project.
1.4The scheme is only considering Alconbury at this time and is not including measure to improve flood protection in Alconbury Weston. The Environment Agency cannot justify a project in Alconbury Weston as all proposals fail to reach the cost-benefit threshold required to attract government grant.
2. CONSULTATION PROCESS
2.1The potential effects of the flood alleviation scheme will be considered in an Environmental Impact Statement, with the findings published in an Environmental Statement. This will be submitted to the Council, as the Local Planning Authority, in support of the planning application for the scheme that ultimately will be submitted by the Environment Agency.
2.2A scoping report was prepared and issued in June 2004. This invited comments from statutory and selected non-statutory consultees regarding six possible options for managing flood risk in the village of Alconbury.
2.3This consultation seeks stakeholder opinion on the preferred option presented in the scoping report. A public exhibition was held in the village in December 2004 at which the proposals where presented to all interested parties.
2.4Pre-application discussions are ongoing with the Council’s Planning Department. A planning application will be made by the Environment Agency once design of the scheme is complete. The decision of the DC Panel will depend on the balance achieved between the extent of the engineering works, and hence the level of flood protection provided, and the visual impact of the scheme on the village centre, a conservation area and the impact on heritage assets such as the bridge an Ancient Monument. It will be for the Council, acting as the local planning authority, to decide if the advantages of the scheme outweigh any disadvantages.
3. PROPOSED SCHEME
3.1The best technical and economically viable option for reducing flood risk within Alconbury is to improve the channel of Alconbury Brook and to construct new flood defences in the village. The Environment Agency report that this option has support from all of the consultees from the earlier Scoping Report. Comments received on the preferred option at that time have been taken into account and incorporated within the current scheme proposals.
3.2The scheme comprises substantial improvements to the length of river between the A1(M) flyover to upstream of the heritage bridge in the village centre. The detail of the proposals is:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.