Resolved
RESOLVED that the contents of the report now submitted be noted.
Ramsey Leisure Centre Management Committee: expired April 2009 noted this item on Monday 6 November 2006. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the contents of the report now submitted be noted.
1.1The first ever Condition Survey for the Leisure Centres took place in 2001. The survey concentrated on specific areas where remedial action to replace or repair areas of the building would have most impact on public usage, overall income and health and safety. Undoubtedly, the 5 year programme was a success with all Centres benefiting from the renewed attention to changing facilities, heating, ventilation, car parking, pitches, lighting, pools, access, flooring and roofing.
1.2Investment in these major assets is critical if gradual deterioration is not to lead to falling attendances and ensuing increased deficits.
1.3However, it was always made clear that year 5 of the original Condition Survey would not be an end to the investment required to maintain the facilities at an optimum level. So, a notional element was included in the Capital Programme for years 6-10 (2007/8 to 2011/12).
2 CONDITION SURVEY 2006
2.1Tenders were placed in January 2006 for bids to undertake the second Leisure Centres Condition Survey. In April 2006 the successful tenderer returned the completed surveys. The brief had been to include everything in the documentation that would require refurbishment or replacement in the next 5 years.
2.2The subsequent investigation into the state of each centre has, undeniably, been more thorough than the original survey in 2001, and has widened its scope to include parts of the building that were not considered or examined in depth originally. Roofing, in particular, has been subject to specialist reports and a significant part of the new estimated total cost is devoted to roofing repairs and maintenance. Each “job” has been allocated an individual cost and each centre a profile of estimated expenditure for the next 5 years. 2007 -2011 Condition Survey 2007/08 2008/09 2009/10 2010/11 2011/12 Total by Projections £000 £000 £000 £000 £000 Site RLC 140 76 43 146 37 442 SIOC 158 181 102 48 73 562 SILC 461 465 377 265 195 1,763 HLC Wet 141 20 51 22 49 282 HLC Dry 269 30 63 8 66 436 SLC 103 93 50 45 39 330 SNLC Wet 274 133 37 3 117 563 SNLC Dry 478 19 29 9 152 686 Total All Sites 2,025 1,016 752 546 727 5,065 Including Fees @11% 2,248 1,128 834,276 606 807 5,622
The projections, based on the 2001 survey, included in the current MTP are clearly insufficient. See below:
Current MTP Condition Survey 2007/08 2008/09 2009/10 2010/11 2011/12 Total Approved £000 £000 £000 £000 £000 Budget All Centre 239 262 359 360 Bid pending 1,220
In total there is a shortfall of approximately £4.4 million over the next 5 years.
3 NEXT STEPS
3.1Efforts to reduce the total spend have been made and it has been possible to reduce the overall projected spend of £5.6 million to £4.6 million by rejecting some non-essential works, deferring some till post– 2011/12, or incorporating minor repairs within the existing Centre budgets. This leaves the table as follows:
Revised Centre 2007/08 2008/09 2009/10 2010/11 2011/12 Total £000 £000 £000 £000 £000 £000 RLC 41 100 81 142 12 376 SIOC 88 139 73 39 76 415 SILC 389 469 319 245 157 1,596 HLC Wet 109 63 29 20 30 251 HLC Dry 223 27 72 1 45 368 SLC 56 101 48 3 7 214 SNLC Wet 299 181 0 0 20 500 SNLC Dry 128 104 150 0 83 464 Yearly Total 1,333 1,183 773 449 430 4,185 Including Fees 1,480 1,314 857 499 478 4,645 (estimated @11%)
2 3.2 In addition to the cost of works, an allowance needs to be made for the income that will be lost while facilities are closed for the work to take place. A preliminary assessment of this cost is shown below:
Centre 2007/08 2008/09 2009/10 2010/11 2011/12 Total £000 £000 £000 £000 £000 £000 Estimated 185 64 89 61 41 440 Lost Revenue
A bid for these sums (See Annex A) will be included in the draft MTP for consideration by the District Council in December.
4 KEY COMPONENTS
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
FUTURE MAINTENANCE: LEISURE CENTRESReport | 21 KB | DownloadRead as text |
PDF |
MTP New Bid 2007: Condition SurveyReport | 29 KB | Download |
PDF |
MTP New Bid 2007: Condition Survey AnnexAppendix | 45 KB | Download |
Follow Ramsey Leisure Centre Management Committee: expired April 2009 at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 30 Mar 2009 | Termination of Joint CommitteesRESOLVED (a) that any balance remaining on the repairs and renewals fund on the closure of the separate accounts for ... | Decided | Open |
| 2 Feb 2009 | Election of ChairmanRESOLVED that Councillor E R Butler be elected as Chairman of the Management Committee. | Decided | Open |
| 2 Feb 2009 | Leisure Centre Management AgreementRESOLVED (a) that subject to approval by the District Council of the recommendations in a report attached to that now... | Approved | Open |
| 2 Feb 2009 | Revenue Monitoring (2008/09) & Revenue Budget (2009/10)RESOLVED that the financial position in the current year and the budget forecast for 2009/2010 be noted. | Noted | Open |
| 3 Nov 2008 | Final Accounts Update 2007/08RESOLVED (a) that minor changes to the Financial Statement for Ramsey Leisure Centre Management Committee 2007/08 acc... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.