HUNTINGDONSHIRE DESIGN GUIDE REVIEW: PILOT PROJECT
ApprovedPlanning3 papers
Development Control Panel: changed to Development Management Panel - May 2009 approved this item on Monday 21 January 2008. Below is the council's own wording, with the papers it was decided on.
RESOLVED (a) that, subject to the foregoing amendment to Item 6 of the procedure the proposed method and procedure, for the Huntingdonshire Design Review as described in Appendix 1 to the report now submitted be approved subject to review after a pilot project and a trial period of 12 months duration; and (b) that Councillors [name removed], P L E Bucknell, E R Butler, J J Dutton, J D Fell, P J Mitchell, P R Ward and R J West be invited to undertake the trial exercise on 28th February 2008.
Word for word from the decision Huntingdonshire published for this meeting.Source: democracy.huntingdonshire.gov.uk
Report to Development Control Panel: changed to Development Management Panel - May 2009
Background
2.1The Design Review flows from the work resulting from the implementation of the updated Huntingdonshire Design Guide 2007. It is intended to provide a method for ‘scoring’ developments once they are complete and to provide a level of feedback to further improve the application and design process.
2.2The Huntingdonshire Design Review ‘Method and Procedure’ paper, attached in Appendix 1, explains the proposed process for development scoring.
3. THE DESIGN REVIEW
3.1Over the last two to three years there has been a significant improvement in the submission of application material and development outcomes helped, in the main, by officers’ and members’ ability to refer to best practice guidance material in the form of the Design Guide, on-going officer and member training and by more pro-active methods of negotiation. At the present time, there is currently no formal means of measuring these improvements or for identifying areas of weakness that still remain.
3.2It is therefore intended to operate a ‘design review’ of completed developments. The review method is to be based on that developed for the Building for Life awards. This method has been adopted by the Commission for Architecture and the Built Environment (CABE) for some of their regional assessments of building quality which have received significant press attention in recent months. ‘Design for Homes’, who contribute to the Building for Life awards, have already been involved with this Council as the co-organiser of the Civic Trust coach trip attended by a number of Panel members in 2003 when we visited schemes in Bedfordshire and Ely. Design Reviews are encouraged by CABE in their publication How to do design review: creating and running a successful panel, published in July 2006. 3.3 The Huntingdonshire Design Review looks at 20 parameters of design. These range from assessing contributors to ‘character’, to issues of road design, car parking, methods of construction, housing mix and proximity to community facilities etc. By scoring each criterion between 0 and 5, a total score is achieved with a maximum of 100.
3.4Within the Development Control Policies – Issues and Options Report 2007, the Council has undertaken to promote high quality development and will monitor the outcomes. Exact targets for monitoring will be agreed following an assessment of the pilot project results.
3.5It is important also to note that whilst the scoring method will be useful in assessing quality once a development is built, it can also be used as a tool or checklist during the consideration of an application – before a decision is made. In time, this will help to engender better ways of assessing design quality at these early stages.
4. THE PILOT PROJECT
4.1The pilot project proposes to set a threshold for measuring schemes at a gross site area of >0.5 hectares or 10+ units. For the purposes of the pilot, schemes completed in 2003 or later will be considered (numbering approximately 25).
4.2To operate the scheme, at least eight individual scores must be provided on each scheme, at least four of which should be presented by Development Control Panel Members. The remainder will be scored by officers. The scores will be averaged and will then form the final score for each development.
4.3The results of the pilot project will be presented in 12 months’ time, with a report noting the feedback from the review and any proposed refinements of the method resulting from its operation.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Development Control Panel: changed to Development Management Panel - May 2009 at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.