Resolved
The Cabinet approves the capital allocation of £50,000 to repair and preserve the Octagon building in St Ives.
Cabinet approved this item on Thursday 22 October 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
The Cabinet approves the capital allocation of £50,000 to repair and preserve the Octagon building in St Ives.
The Octagon is a building owned by Huntingdonshire District Council (HDC) and is located within the Cattle Market Car Park in St Ives. It is the historic cattle market sale ring and along with the old railings is the only evidence left of the former usage, as such is a significant local structure. The building is not listed but does have protection against demolition as it is in the Conservation Area.
The building’s condition is such that repairs are now required to ensure that the structure is made safe, is able to be securely locked and to improve the use of the internal space.
From the visible conditions survey complete, the repairs noted below in 2.5 have been identified with an estimate of £40,629 for the cost of repairs. However this does not include any potential wood rot or infestation and improving the security to the building by reinforcing the doors, frames or improved locks.
It would be prudent to budget for this additional cladding, electrical work and security provisions and a budget of £50,000 is considered more appropriate.
Recommendation(s):
It is recommended that Cabinet:
i. Approve a capital allocation of £50,000 to repair and preserve the historic Octagon building in St Ives. This page is intentionally left blank 1. WHAT IS THIS REPORT ABOUT/PURPOSE?
1.1The purpose of this report is to outline the business case for the required repairs to the Octagon building in St Ives.
2. WHY IS THIS REPORT NECESSARY/BACKGROUND
2.1The Octagon is a building owned by Huntingdonshire District Council (HDC) and is located within the Cattle Market Car Park in St Ives. It is the historic cattle market sale ring and along with the old railings is the only evidence left of the former usage, as such is a significant local structure. The building is not listed but does have protection against demolition as it is in the Conservation Area.
2.2The building’s condition is such that repairs are now required to ensure that the structure is made safe, is able to be securely locked and to improve the use of the internal space.
2.3From the visible conditions survey complete, the repairs noted below in para. 2.5 have been identified with an estimate of £40,629 for the cost of repairs. However this does not include any potential wood rot or infestation and improving the security to the building by reinforcing the doors, frames or improved locks.
2.4It would be prudent to budget for this additional cladding, electrical work and security provisions and a budget of £50,000 is considered more appropriate.
2.5The repairs identified in the visible condition survey are:
1. The building is a steel frame building with timber tongue and groove cladding with further timber lining to some areas. The paint to the timber cladding has peeled off on the majority of the area and there are large areas of wood missing, damaged or rotting. Two of the walls are covered in ivy which would need to be removed and the wood repaired underneath. The full extent of the damaged to these faces is not known until this is removed.
2. The roof is not watertight and there are areas of missing and damaged asbestos sheeting, which are difficult to repair in isolation. In addition the roof light has old glass which also needs replacing to ensure the building is sound.
3. Doors are timber and again in poor condition. Although the building is lockable the overall security is low without strengthening of the doors.
4. The internal structure is steel columns with steel truss beams. These appear sound, but require painting to improve their appearance and lengthen their life.
5. There is an old concrete bund in the building which would require removing and the floor reinstating to make more room usable.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
URGENT REPAIRS TO THE OCTAGON BUILDING, ST IVESReport | 145 KB | DownloadRead as text |
Follow Cabinet at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 17 Nov 2026 | Report in Response to Overview and Scrutiny Panel RequestThe Cabinet has (1) noted the resolution of the Overview and Scrutiny (Performance and Growth) Panel made on 4th Nove... | Noted | Open |
| 17 Nov 2026 | Council Tax Support 2027/28The Cabinet has deferred the report to the 15th December 2026 Cabinet meeting, to allow sufficient time for Officers ... | Deferred | Open |
| 17 Nov 2026 | Homelessness & Rough Sleeping Strategy 2026-2031The Cabinet has 1.1. approved the Homelessness & Rough Sleeping Strategy 2026-2031 as a consultation draft; and 1.2. ... | Approved | Open |
| 17 Nov 2026 | Safeguarding Children, Young People and Adults at Risk of Harm Policy ReviewThe Cabinet has (a) approved the updated Safeguarding Children, Young People and Adults at Risk of Harm Policy; and (... | Approved | Open |
| 17 Nov 2026 | Finance Performance Report Q2The Cabinet has (1) considered and commented on the General Fund revenue budget’s financial performance in quarter tw... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.