The Cabinet (a) commented on the delivery of the Climate Action Plan for 2024-25; (b) noted the progress made by the Council and its partners towards achieving Carbon Net Zero by 2040; and (c) commented on and approved the updated Climate Action plan as shown in Appendix 6 and note the amendment of actions in Appendix 7.
Word for word from the decision Huntingdonshire published for this meeting.Source: democracy.huntingdonshire.gov.uk
The Facilities team have initiated several projects throughout 2024-25 as set out in the Climate Strategy, especially in continuation of retrofitting Council buildings to make them more sustainable. As of October 2024, all HDC’s electricity is now on a green tariff. This includes all our corporate sites, bus stations and One Leisure sites. A list of these sites can be found in Appendix 3. Item 39 in the Corporate Plan to ‘deliver an energy strategy’ which will be completed by the end of July 2025. 4 roof surveys were completed in April 2024 on the following sites: St Ives, St Neots Ramsey and Huntingdon to establish the suitability of installing solar panels. Projects to install solar panels on St Neots, Huntingdon and Ramsey will be completed in the 2025-2026 financial year.
In April 2024, £700,000 of Swim England funding was awarded for the installation of triple-glazed windows around the swimming pool and the installation of a solar canopy in the car park at One Leisure St Ives. The canopy installation was commissioned as of 22/04/2025 and the triple glazing completed at the end of January 2025. The energy production will be monitored through software apps, meter readings and utility bill management. It is estimated that the solar canopy will save 31,941kg of CO₂ per year. 215,000 kwh per year in terms of electricity production.
Reduce energy use, shift to Renewables
EV Strategy
Through funding from the Rural England Prosperity Fund, HDC has completed works to upgrade its charge points and the ancillary equipment (which includes meters etc.) that powers them. These EV charge points are located at: • Multi-storey Car Park – Huntingdon • Princes Street – Huntingdon • Mill Common – Huntingdon • Great Northern Street – Huntingdon • Ingram Street – Huntingdon • Tebbutts Road – St Neots • Tan Yard – St Neots • Riverside Car Park – St Neots • Priory Lane West – St Neots • Brook Street – St Neots • Cattle Market – St Ives • Darwoods Pond – St Ives • Globe Place – St Ives Whilst the sites do offer EV charging, they still have some power limitations. However, the hardware does support a higher charge rate, which would remove a barrier should additional funding be sourced to supply this in the future.
Home Energy
Home Energy work continues through the ‘Action on Energy (AOE) Cambridgeshire’ network. A total of 29 Energy Company Obligation (ECO) 4 FLEX applications have been submitted over the last financial year. ECO4 Flex is a household referral mechanism within the wider ECO4 scheme enabling Local Authorities to widen the eligibility criteria for ECO, allowing them to tailor energy efficiency schemes to their respective area. A total of 24 properties were approved to be upgraded for the HUG2 (Home Upgrade Grant) scheme in 2024- 25. This scheme provided energy efficient upgrades and low-carbon heating to low-income households living in off-gas grid homes in England.
The HUG2 scheme has now closed and has been replaced with the Warm Homes Upgrade Grant (WHUG) scheme. Depending on eligibility, free energy saving improvements can be made to homes and is only available in England. The details of this scheme are currently being finalised, and the 3-year programme is being launched in 2025-2026. This 3-year programme will receive £8.5 million’s worth of funding to retrofit properties across Cambridgeshire as a whole, which was a lower figure than initially bid for.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.