Resolved
- Grant planning permission upon condition that (briefly ):- 1. Development to be in accordance with plans. 2. Details to be submitted and approved:- External materials; Hard and soft landscaping including external surfaces; Details of the specification to be provided for secure cycle storage; Details of refuse/recycle presentation areas; Boundary treatments; External lighting details; Details relating privacy screens to terraced balconies; Renewable or low-carbon energy provision; Ecological enhancement measures. All agreed details to be provided prior to occupation. 3. Dwellings to meet necessary energy and water use sustainability targets as required by policy DM1. 4. Submission of Pre-commencement phase 2 Geoenvironmental investigation including an intrusive site investigation and asbestos survey. Submission of phase 3 report demonstrating remediation options. No occupation of any part of the development should take place until a verification report has been submitted to the local planning authority. 5. Submission of details of any unidentified contamination on commencement of demolition/construction. 6. Submission of Pre-commencement Written Scheme of Archaeological Investigation. 7. No buildings shall be occupied until the site investigation and post investigation assessment has been completed, submitted to and approved in writing by the Local Planning Authority. 8. Submission of a Pre-commencement method statement addressing safety of people (including the provision and adequacy of an emergency plan, temporary refuge and rescue or evacuation arrangements); safety of the building; and flood recovery measures (including flood proofing and other building level resistance and resilience measures). 9. No development shall commence until details of the strategy for the disposal of surface water on the site have been submitted to and approved in writing by the local planning authority. 10. No development shall commence until details of the implementation, maintenance and management of the strategy for the disposal of surface water on the site have been submitted to and approved in writing by the local planning authority. 11. No development shall commence until details of a Construction Surface Water Management Plan (CSWMP) detailing how surface water and storm water will be managed on the site during construction (including demolition and site clearance operations) is submitted to and agreed in writing by the local planning authority . 12. Before the development is occupied a scheme of highway improvements shall be submitted to, approved in writing by the Local Planning Authority and implemented. The highway improvements shall include measures to reduce vehicle speeds along Dock Street and appropriate signage. 13. Before the development is occupied details of the proposed signage within the site shall be submitted to, approved in writing by the Local Planning Authority and implemented. 14. The new vehicular access shall be laid out and completed in all respects in accordance with ... view the full minutes text for item 54.