Planning & Development Committee decided this item on Wednesday 18 September 2019. Below is the council's own wording, with the papers it was decided on.
That the Head of Development be authorised to make representation on behalf of Ipswich Borough Council to EDF Energy on the Stage 4 consultation on the Sizewell C Nuclear Power Station. 1. Of the three strategies proposed, IBC would strongly encourage the use of a Rail-led transport strategy, as the most sustainable way of getting construction materials to the site, followed by the Integrated strategy and the last strategy that should be followed is the Road-led strategy. 2. Should the Integrated strategy be pursued this should include improvements to the East Suffolk line providing a legacy of rail infrastructure. 3. The DCO application must have proper regards to the proposed development of 3,500 dwellings at Ipswich Garden Suburb, with particular reference being made to potential added noise and disturbance to existing and future occupants, the need for level crossing improvements at Westerfield Station, and the retention of the public right of way and installation of a foot/cycle bridge, rather than a permanent diversion. 4. The Ipswich housing market needs to be part of the Accommodation Strategy that is being considered by EDF and should form part ... view the full minutes text for item 55.
Word for word from the decision Ipswich published for this meeting.Source: democracy.ipswich.gov.uk
That the Head of Development be authorised to make representation on behalf of Ipswich Borough Council to EDF Energy on the Stage 4 consultation on the Sizewell C Nuclear Power Station.
1. Of the three strategies proposed IBC would strongly encourage the use of a Rail-led transport strategy, as the most sustainable way of getting construction materials to the site. Followed by the integrated strategy and the last strategy that should be followed is the road led strategy.
2. Should the integrated strategy be pursued this should include improvements to the East Suffolk line providing a legacy of rail infrastructure.
3. The DCO application must have proper regards to the proposed development of 3,500 dwellings at Ipswich Garden Suburb, with particular reference being made to potential added noise and disturbance to existing and future occupants, the need for level crossing improvements at Westerfield Station, and the retention of the public right of way and installation of a foot/cycle bridge, rather than a permanent diversion.
4. The Ipswich housing market needs to be part of the Accommodation Strategy that is being considered by EDF and should form part of the DCO submission, both in terms of the impact on the Ipswich rental market, and the likely need for workers who may be living in Ipswich.
5. The information contained within the Consultation contains limited detail to fully justify why the marine-led strategy is no longer being pursued as an option.
6. Impact upon Ipswich’s air quality needs full consideration as part of the DCO process including in the EIA, and necessary mitigation such as low emission bus transfers for staff from Ipswich/Westerfield Railway Stations.
7. The Environmental Statement should have proper regard to the proposed development of 3,500 dwellings at Ipswich Garden Suburb, including traffic implications.
8. Further information is required on the diversion strategy for HGVs and LGVs should the Orwell Bridge be closed at any time and for any reason.
9. Impacts upon Ipswich’s road network and air quality needs to be assessed in the Environmental Statement for all vehicular movements (HGVs, LGVs, Buses, Cars).
Representation to be sent by 27th September 2019.
Background
1.1EDF Energy are proposing to build a nuclear power station with two EPR (European Pressurised Reactor) units to be constructed on the east Suffolk coast to the north of the existing EDF Energy operated Sizewell B nuclear power station. PLANNING AND DEVELOPMENT CONTROL COMMITTEE 18th SEPTEMBER 2019 REF. NO. PD/19/06
1.2This Stage 4 public consultation is a further round of consultation proposed prior to the submission of an application for development consent under the Nationally Significant Infrastructure Project (NSIP) regime. In Stage 3 it was proposed for this application to be submitted in Quarter 1 2020. A further round of consultation is not anticipated prior to the submission of an application to the Planning Inspectorate.
1.3IBC have been consulted on this Stage 4 consultation which runs between the 18 th July 2019 and 27th September 2019. The proposals set out within this fourth round of consultation have been shaped by National and Local Planning Policy, feedback from the first, second and third round of consultations, on-going engagement, further technical work, environmental assessment and lessons from the construction of EDF Energy’s sister project Hinkley Point C.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.