Proposal TW/11/121- Three bay modular building at Langton Green Primary School, Lampington Row, Langton Green, Tunbridge Wells; KCC Education, Learning and Skills
DecidedPlanning1 paper
Planning Applications Committee decided this item on Tuesday 14 June 2011. Below is the council's own wording, with the papers it was decided on.
RESOLVED that permission be granted to the proposal subject to conditions, including conditions covering a requirement for the mobile classroom to be removed from the site no later than 5 years from the date of the permission; the colour of the cedar cladding; and design specifications for the windows and fascias on the exterior of the building.
Word for word from the decision Kent published for this meeting.Source: democracy.kent.gov.uk
Report to Planning Applications Committee, 8 pages
Item D3 Three bay modular building at Langton Green Primary School, Lampington Row, Tunbridge Wells- TW/11/855
A report by Head of Planning Applications Group to Planning Applications Committee on 14 June 2011
Application by Kent County Council, for the placement of one, three bay modular building at Langton Green Primary School, Lampington Row, Tunbridge Wells, TN3 0JG- TW/11/855
Recommendation: Permission be granted subject to conditions.
Local Member: [name removed]: Unrestricted
Site
1. Langton Green Primary School is situated on the far western edge of the built confines of the village. The village itself is located approximately three miles west of Tunbridge Wells town centre, north of the A264 (Langton Road). The school buildings are all located in the eastern half of the site and are considered to be within the built development of the village, whilst the school playing fields and land beyond to the north, south and west is designated as being within both the Metropolitan Green Belt and the Kent Downs Area of Outstanding Natural Beauty (AONB) - see map extract from Tunbridge Wells Local Plan on page 2. The site for the proposed mobile classroom is immediately outside the Green Belt boundary and the AONB. Residential development adjoins the eastern boundary. A site plan is attached.
Background and Proposal
2. The proposal is for the placement of a three bay mobile classroom to be sited south- west of the main school building. Originally the application was for a six bay mobile unit, but this was amended to a three bay during the consultation phase by the applicant. The applicant has stated that the school roll will increase by 10 pupils in September 2011 and the modular building would provide much needed additional teaching space. The mobile classroom would measure 10 metres in length, 8.5 metres in width and have a height of 3.4 metres. The application documents originally specified that the mobile classroom would be of standard design, with a dark green textured finish, aluminium double glazed windows and a black shallow felt pitched roof. However, after consultation with Tunbridge Wells Borough Council, the applicant has amended the exterior of the mobile classroom to be cedar clad. There is currently a shelter installed on the playground and this would be relocated (location yet to be confirmed) to accommodate the proposed mobile classroom.
3. The school has undergone a number of developments over the last decade including two single storey extensions to the main school building, one in the north under reference TW/07/45 and one in the south under reference TW/09/1572, the development of a reception class play area under reference TW/02/2744 and the erection of a canopy adjacent to the reception classroom under reference TW/09/2192.
D3.1 Item D3 D3 Three bay modular building at Langton Green Primary School, Lampington Row, Tunbridge Wells
Site Plan
Extract from Tunbridge Wells Local Plan Inset 7- Langton Green Metropolitan Green Belt (MGB1) - Denoted by green layer Area of Outstanding Natural Beauty (EN26) - Denoted by black triangles Kent Special Landscape Area (EN27) - Denoted by green triangles
D3.2 Item D3 D3 Three bay modular building at Langton Green Primary School, Lampington Row, Tunbridge Wells
Elevations (standard design)
Planning Policy
4. The development plan policies summarised below are relevant to consideration of the application:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Proposal TW/11/121- Three bay modular building at Langton Green Primary School, Lampington Row, Langton Green, Tunbridge Wells; KCC Education, Learning and SkillsReport
41Proposal TW/11/121- Three bay modular building at Langton Green Primary School, Lampington Row, Langton Green, Tunbridge Wells; KCC Education, Learning and SkillsThis decision
Proposal TW/11/121- Three bay modular building at Langton Green Primary School, Lampington Row, Langton Green, Tunbridge Wells; KCC Education, Learning and SkillsThis decision
Minutes of the Meeting Held on 17.6.2026RESOLVED that the minutes of the meeting held on 17 June 2026 were correctly recorded and that they be signed by the ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.