Resolved
RESOLVED to note the content of the presentation.
Kent Flood Risk and Water Management Committee noted this item on Wednesday 9 November 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED to note the content of the presentation.
Preparing for Winter within KCC Highways Drainage Team Introduction Kent County Council as the Highway Authority in Kent manages over a quarter of a million roadside drains across the county together with 6200km of pipework, manholes, soakaways, and other assets associated with highway drainage. It is the second largest asset group within the highway authority.
Highway Drains are designed to:
Remove surface water run-off from the highway to help keep roads safe and minimise problems prevent damage and make roads last longer through effective drainage minimise surface water from the highway affecting properties or land
Our highway drains are not usually designed to provide drainage for other areas outside of the highway boundary, such as for land drainage or privately owned property or developments. Mitigating Flood Risk to the Public Highway
• The highway authority does not maintain public foul or surface water sewers • Drainage serving private property • Drainage features such as roadside ditches and watercourses. • KCC would refer these matters to the relevant authority or landowner as appropriate but still does have a major impact to the Highway and residents. Current Situation • Drainage demand through the Summer months remanded steady numbers, and we avoided the flash flood experienced in previous years, however the last 3 months have seen a number of Met Officer weather alerts issued for heavy rain. • Last Thursday was particularly heavy in and around Maidstone, where a number of high profile areas flooded.
• The Team received over 90 Emergencies calls on the Thursday alone and overall for the week 653 flood related enquired and 260 Emergency Response enquires.
• In comparison the previous week, drainage enquires received 168 and this time last year 197. Enquires Received Jobs Completed Main issues causing ongoing flooding
• Highway and Sewer systems under capacity..
• Water run off from fields
• Urban creep
• Back log of pipe works maintenance, and defect requiring attention.
• Example, next photos, tree roots removed from a system, land drainage problems Pearsons Green Road Junction with Churn What have we been doing since April Implemented Our Risk bases approach cleansing • The risk scores that are produced for each individual asset will influence the frequency in which drains are cleaned, these frequencies being 6 monthly, yearly or every 2 years. • Our new approach will see circa 12,500 drains cleansed per month. • Customer enquiries will be risk assessed following a criteria set in place. Reactive works will still be carried out on an ad hoc basis where this meets intervention • We will still respond to emergencies, carry out CCTV surveys and maintain other vital assets such as soakaways. • Customers will soon be able to check when their gully is due to be cleaned via our online fault reporting tool which should improve customer satisfaction.
9/3/20XX Presentation Title 12 Cleansing decision and cycle length was made using 20+ vulnerability and importance factors: • Historic confirm defect activity • Silt levels over multiple years • Flood zone status 30, 100, 1000 year • Local Knowledge priority zone status 1-3 • Surface Water Management Plan zones • Reliance on Water Authority • Urban / Rural • Speed Limit • Road Hierarchy (Strategic, Local Access etc) • Road Classification (A,B,C U etc) • Road Form (Roundabout, dual carriageway etc) What have we been doing since April
• Continue to plot our Asset by Liner, CCTV surveys, Development plans via the Kaarontech Asset Management system:
9/3/20XX Presentation Title 14 Not just Proactive and Reactive Cleansing, we continue to deliver our Capital Schemes Programme • Thornden Close near Herne Bay had suffered from flooding and carriageway Drainage Civils damage due to the poor condition of a ditch at the road edge.
• In order to make safe and prevent future flooding, a small scheme was Framework Contract developed and undertaken using our powers under s.101 HA 1980.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highways Drainage Systems: Presentation by KCC HighwaysReport | 19 pages | DownloadRead as text |
Follow Kent Flood Risk and Water Management Committee at Kent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Jun 2026 | Minutes of the meeting on 04.03.26RESOLVED that the minutes of the meeting held on 4 March 2026 were an accurate record and that they be signed by the ... | Decided | Open |
| 4 Mar 2026 | Minutes of the meeting on 29.10.2025RESOLVED that the minutes of the meeting held on 29 October 2025 were an accurate record and that they be signed by t... | Decided | Open |
| 4 Mar 2026 | KCC Severe Weather Response Activity ReportRESOLVED to note the verbal update on | Noted | Open |
| 4 Mar 2026 | Met Office- Introduction PresentationRESOLVED to note the Met Office Presentation | Noted | Open |
| 4 Mar 2026 | SGN - Introduction and Water Ingress into the Gas Network PresentationRESOLVED to note the Southern Gas Network (SGN) presentation | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.