Kent Flood Risk Management Committee 12 July 2023
Southern Water Clean Rivers and Seas Taskforce Update Jon Yates, Programme Delivery Lead - East What is the Clean Rivers and Seas Task Force? ▪ Southern Water initiative set up in November 2021, with the aim of reducing the use of storm overflows. ▪ Responsible for delivering pathfinder projects over the next two years, as well as delivering a regional plan to reduce storm overflows between now and 2030.
Link to Southern Water website: Clean Rivers and Seas Task Force
2 3 There are broadly 3 main types of intervention to reduce storm overflow use: 1. Source control (removing and slowing the flow of rain water) Rainwater harvesting, Permeable paving, Green roofs, Soakaways (includes tree pits), Rain garden (swales), Planters
2. Optimisation of existing infrastructure Optimisation, tweaking of connected systems and interface, Different mechanical and electrical equipment (e.g. pumps), Improvements in pumping station and storm tank use and control, Smart network control with increased digitalisation
3. Build bigger infrastructure (building larger pipes, pumping stations, etc.) Wetlands treatment (Groundwater), Sewer lining/sealing (Groundwater), Larger sewers, Large storm tanks, Large treatment works
4 Kent Catchment Update
5 Optimisation Whitstable and Deal Albert Road
Construction works completed November 2022
Flood risk resilience increase in Albert Road Deal. JY Swalecliffe Treatment Works
Pumps 60 l/s
Construction works completed May 2023. Permit Variation acceptance for the trail with the Environment Agency for review.
8 Centaur Gates
Diamond Road CSO, modelled c60% reduction in spill
Tankerton Circus CSO, modelled c40% reduction in spill Misconnections Whitstable and Deal Misconnections
21 potential opportunities identified 6 priority areas being investigated 10 potential opportunities Whitstable Deal Surface Water Connections
Misconnection Methodology ▪ 21 potential ▪ Once potential location identified, the network is opportunities identified via dye traced and route mapped. GIS analysis ▪ Focus on 6 priority areas ▪ Ecology and Environmental desktop study to for further investigation identify potential opportunities and risk of misconnection. Review of Flood Risk Activity Permit requirements. ▪ Fluidion test (E-Coli) and Merc Test (ammonia) of the surface water line at the connection point and upstream on the surface water. ▪ Realignment of the misconnection (Construction) ▪ Testing and monitoring of the misconnection post construction SuDs Schemes Whitstable, Deal and Margate SUDS Scheme Locations
Whitstable
Deal Route to Delivery
▪ Identified Schemes are moving from concept design to outline ▪ Surveys are underway to gather more details ▪ A wider integrated team inclusive of KCC has been established to review schemes and integrate 15 development SuDS – Highways Margate Large SuDS – Green Parks - Cornwallis Circle Whitstable
Construction Details
Preferred Option
Potential 1.2ha of impermeable area managed across two phases. Utilising the Permitted Development Right of both Kent County Council and Southern Water – Application for a Certificate of Lawful Development Underway SuDS – Highways, Whitstable Cromwell Rd Permeable paving (approx 659m2) Limited potential for roadside raingardens. SuDS Schemes – Whitstable Library
Potential 0.11ha of impermeable area managed. Excellent opportunity of educational and community links SuDS – Highways,Whitstable Russell Drive, Woodman Ave, Goodwin Ave, Swalecliffe Impermeable Area: 9,085m2 Russell Drive – Wide Verges potential for In- verge Rain Gardens.
Woodman Avenue – No Verges but wide carriageway, potential for in road rain gardens.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Southern Water: PresentationReport | 29 pages | DownloadRead as text |
Follow Kent Flood Risk and Water Management Committee at Kent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Jun 2026 | Minutes of the meeting on 04.03.26RESOLVED that the minutes of the meeting held on 4 March 2026 were an accurate record and that they be signed by the ... | Decided | Open |
| 4 Mar 2026 | Minutes of the meeting on 29.10.2025RESOLVED that the minutes of the meeting held on 29 October 2025 were an accurate record and that they be signed by t... | Decided | Open |
| 4 Mar 2026 | KCC Severe Weather Response Activity ReportRESOLVED to note the verbal update on | Noted | Open |
| 4 Mar 2026 | Met Office- Introduction PresentationRESOLVED to note the Met Office Presentation | Noted | Open |
| 4 Mar 2026 | SGN - Introduction and Water Ingress into the Gas Network PresentationRESOLVED to note the Southern Gas Network (SGN) presentation | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.