Resolved
That the applications be determined as set out at ( i ) – ( vi ) below, where appropriate to the conditions and reasons or grounds of refusal, set out in the schedules signed by the Chairman. ( i ) 17/00138/F Northwold : Parish Council Land, School Lane: Development of Parish Council land to change use from allotment land to community car park: Northwold and Whittington Parish Council The Principal Planner reminded the Committee that the application had been deferred from the April meeting to enable further consideration of a scheme that was submitted under late correspondence. Since that time, the Parish Council had met with the Local Highway Authority (LHA) and come up with a solution that addressed the LHA’s concerns. The application had been referred to the Committee for determination as the application was deferred from the Committee meeting held in April. Permission was sought for the change of use of former allotment land to a community car park. The car park would provide 26 x 7 x 2.5 m spaces on grass reinforced mesh and would use the existing cemetery access that would be widened and upgraded as part of the proposal. The previous proposal was for 24 car parking spaces using two existing accesses onto School Lane using an ‘in’ and ‘out’ circuit. The ‘in’ would utilise the existing cemetery access and the ‘out’ would utilise an existing field access. The proposal resulted in an objection from the LHA as the applicant (the Parish Council) did not control the land to the east of the eastern access and therefore long term visibility could not be certain. The current proposal meant that there was sufficient land on either side of the access/exit to ensure long term visibility. The current proposal would result in the loss of a conifer tree, removal of the existing gates at the entrance to the cemetery and relocation of the existing boundary fence with School Lane to provide visibility splays. The Principal Planner referred to late correspondence and the objection from the PROW Officer which related to the amended plan which indicated an extension of the fence across the top of the public right of way (which ran to the east of the site adjacent to 30 School Lane) leaving a 1m gap for pedestrians. The reason the fence was shown was to prevent vehicles from exiting the car park through the existing access to the east (also the Public Right of Way) in the interests of highway safety. Given the PROW officer’s objection and the fact that the extent of the PROW cannot be determined at this stage, an additional condition (7) was suggested which allowed for negotiation between both parties. It was confirmed that both parties were happy with this approach. The Principal Planner ... view the full minutes text for item PC7:a