Resolved
That the applications be determined, as set out at ( i ) – (xii) below, where appropriate, to the conditions and reasons or grounds of refusal, set out in the schedules signed by the Chairman. ( i ) 18/01864/FM King’s Lynn: Land N of Outfall S off Transmission Cables, W off Road, Cross Bank Road: Erection of anaerobic digestion facility to process biomass including reception/office building and workshop, digesters, storage tanks, combined heat and power plant, energy crop storage area and ancillary plant: [name removed] Committee had visited the site prior to the meeting. The Senior Planner introduced the report and explained that the application sough consent for an Anaerobic Digestion plant that would process up to 42,350 tonnes of biomass / slurry per annum (38,500 + 10 per cent allowance). There were two extant permissions granted under applications 16/01145/CM and 17/02338/F for similar projects ( ie . anaerobic digester plants). Both previous approvals were on a slightly smaller site. The 2016 application was a County Matters Application (CM) and was refused by County in April 2017. However it was approved by the Planning Inspectorate at appeal in November 2017. It was for a 14,000 tonne facility processing biomass and slurry. The 2017 application removed slurry from the feedstock and was therefore dealt with by the Local Planning Authority (LPA) as it was no longer classed as a waste proposal. It was for 19,500 tonnes of biomass. The facility proposed under the current application would comprise three digesters, a feeder unit, two day tanks, a process building (containing the feeder unit and day tanks), a storage area, gas upgrade unit, CHPs and compressor, fire water store, administration building, car parking, screen bank (made from soil taken to lower the site), an access road, and a contamination bund wall. All HGV’s serving the development would enter the site from a new access track provided from Estuary Road. The road benefitted from planning permission granted under application 17/02338/F. The application had been referred to the Committee for determination by the Assistant Director. The Senior Planner then outlined the key issues for consideration when determining the application, namely: · Principle of development; and · Differences and impacts between permitted and proposed schemes. In accordance with the adopted public speaking protocol, [name removed] (objecting) addressed the Committee in relation to the application. In response to comments raised by the objector, the Senior Planner explained that in relation to the end user, the same condition used by the Planning Inspector had been imposed. With regards to visual impact, this had been covered during the presentation and in relation to the impact on the landscape, Natural England had raised no objection. The Chairman, Councillor Mrs Spikings queried what the CSNN conditions related to. In response the Senior Planner ... view the full minutes text for item PC98:a