FUTURE SWIMMING PROVISION FOR WEST NORFOLK

Approved Executive 2 papers

AI summaryCabinet recommends Council approve up to £845,609.17 to develop designs for a new standalone swimming pool at Lynnsport, with a final business case due March 2027.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedUp to £845,609.17 from reserves to RIBA Stages 2 and 3
Money£845,609.17Development phase funding from earmarked capital reserve
What happens nextFull business case March 2027Cabinet and Council to decide on construction
Who it affectsWest Norfolk residents, schools and clubsSwimming provision and leisure users

What was decided

Cabinet recommends Council approve up to £845,609.17 from reserves to progress the new standalone 8x25m swimming pool with learner pool and splash pad at Lynnsport through RIBA Stages 2 and 3. Report 3.4, 5.2

Cabinet agreed to delegate authority to the Chief Operating Officer, in consultation with the Leader, the Strategic Advisor and the Portfolio Holder for Business, to enter into an Access Agreement with the leisure operator to progress to RIBA Stage 3. Report 5.2

Cabinet noted that a future report will return with the full business case in March 2027 for a final decision on whether to proceed. Report 5.5

Why

St James Swimming Pool continues to deteriorate, with rising maintenance and operating costs and growing risk to long-term swimming provision, so the council needs a replacement. Report 2.6, 3.5, P18, 14.1

A standalone pool at Lynnsport offers reduced disruption during construction, design flexibility, opportunities for low-carbon technology and lower construction risk than the previously explored integrated refurbishment. Report 2.5, 2.6, 3.3, P12

Without investment there is a real risk the borough will lose swimming capacity, affecting statutory school swimming, clubs and public health, and the existing pool could face unplanned closure. Report 4.1, P21, P46

What happens next

Full Council is asked to approve the £845,609.17 allocation and delegate authority to the Section 151 Officer to determine which reserve to draw from. Report 5.3

Design work, technical investigations, site surveys, planning activities and cost planning will be carried out to reach RIBA Stages 2 and 3. Report 5.2, 5.4

A report setting out scheme design, confirmed costs and a funding strategy will return to Cabinet and Council in March 2027 for the construction decision. Report 5.5

The money

  • £845,609.17 Maximum from reserves to fund the project through RIBA Stages 2 and 3 Report 5.2
  • £22,930,233 Estimated total cost of the standalone swimming pool, inclusive of construction, fees and contingency Report 3.7, 5.1

Options considered

  • Rejected: Do nothing and continue operating St James with essential maintenance only. Existing facility has reached the end of its economic life and risks unplanned closure and loss of swimming provision Report 4.1, P21
  • Rejected: Continue with an integrated pool within the Lynnsport Leisure Centre. Extensive disruption to services, higher construction risk, building footprint constraints and affordability concerns Report 2.5, 2.6
  • Chosen: Develop a standalone swimming pool adjacent to Lynnsport on the model railway land. Purpose-built, energy efficient, minimal disruption to existing services and best long-term option Report 3.1, 3.3, P12
  • Rejected: Cease providing swimming facilities once the existing pool reaches end of operational life. Significant consequences for residents, schools, clubs and public health and a major reduction in leisure offer

Implications

  • Financial: Development funding of £845,609.17 is from the earmarked capital project reserve and does not commit the council to the £22,930,233 construction cost, which would be funded through capital borrowing. Report 5.1, 5.2, 5.3
  • Risk: Continuing to delay increases the risk of unplanned pool failure, escalating maintenance costs and disruption to residents, schools and clubs. Report 14.1, P46
  • Climate: A new standalone facility creates the opportunity to incorporate low-carbon technologies and reduce energy use and operating costs. Report 3.3, P12, 3.6, P17
  • Equalities: A pre-screening Equality Impact Assessment found the new pool would improve accessibility, including for disabled users, with a splash pad usable by wheelchair users. Report 13.1, P57
  • Legal: The council has no statutory duty to provide a swimming pool, but local facilities are needed to enable schools to meet their statutory Key Stage 2 swimming duty.
  • Other: The pause in Local Government Reorganisation announced on 7th September 2026 means this council alone will likely determine the project's future. Report 10.2

Who and where

  • Residents of West Norfolk using public swimming and leisure facilities Report 3.6, P17
  • Schools needing access to swimming for Key Stage 2 curriculum delivery Report 3.6
  • Swimming clubs and competitive swimming users in the borough Report 2.3, 3.6
  • Existing leisure service users at Lynnsport who would be affected by any construction phase Report 3.3, P12
  • Staff and members of the leisure operator Report 2.3

Timeline

  • December 2024: Cabinet resolved to carry out initial feasibility and design work on relocation options Report 2.1, P50
  • July 2025: Cabinet and Council approved relocation of the pool to Lynnsport with refurbishment Report 2.2, P50
  • August to November 2025: RIBA Stage 3 work including highways, environmental and M&E assessments and consultation Report 2.2, 2.3
  • Autumn 2025: Capital programme review identified affordability pressure on the integrated pool project Report 2.4
  • 7th September 2026: Local Government Reorganisation paused, changing the strategic context for the project Report 10.2
  • 2026-09-08: Cabinet recommends Council approve development funding for the standalone pool
  • March 2027: Full business case to return to Cabinet and Council for the construction decision Report 5.5

Plain English for the jargon

  • RIBA Stages 2 and 3: Stages of the Royal Institute of British Architects' work plan covering concept design and developed design, including detailed design, technical investigations and cost planning.
  • Section 151 Officer: The council officer with statutory responsibility for financial administration and determining appropriate funding reserves.
  • PWLB borrowing: Public Works Loan Board borrowing, which must be repaid over the life of the asset and was a key factor in comparing refurbishment and new build options.
  • Lynnsport: The existing leisure complex in King's Lynn where the new standalone pool would be built on the model railway land.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
ItemCAB46

Resolved

Recommend to Council to approve the allocation of a maximum of £845,609.17 to progress the project to build a standalone 8x25m swimming pool with learner pool and splash pad to RIBA Stages 2 and 3. 2. Delegate authority to the Chief Operating Officer in consultation with the Leader of the Council, Strategic Advisor to the Chief Executive and Leader and the Portfolio Holder for Business to enter into an Access Agreement Leisure to progress the project to RIBA Stage 3. 3. Note that a future report will return with the full business case in March 2027 for a final decision on whether to proceed with the project. RECOMMENDED: That Council: 1. Approve the allocation of a maximum of £845,609.17 from reserves to fund the new Lynnsport Project through to RIBA Stage 3. 2. Delegate authority to the Section 151 Officer, in consultation with the Leader of the Council and Portfolio Holder for Finance, to determine the appropriate reserve to fund the work. REASON FOR DECISION: To progress the project to build a new standalone swimming pool at Lynnsport to RIBA Stage 3 to provide the Council with the final design, project cost-certainty and business case to provide members with the information required to determine whether to proceed to the construction of the new pool. The timing of this decision reflects both the condition of the existing facility and the maturity of the work undertaken to date. St James Swimming Pool is continuing to deteriorate, with increasing maintenance requirements, rising operating costs and a growing risk to the long-term continuity of swimming provision. Progressing to the next steps now will maintain project momentum and preserve the value of the work already undertaken.
Word for word from the decision King's Lynn and West Norfolk published for this meeting. Source: democracy.west-norfolk.gov.uk

Follow this further

Built from King's Lynn and West Norfolk's papers

What the report saysPro

Report to Cabinet

REPORT TO CABINET DATE OF MEETING 8 September 2026 REPORT TITLE Future Swimming Provision for West Norfolk LEAD MEMBER Cllr Simon Ring – Deputy Leader of the Council LEAD OFFICER Honor Howell – Strategic Advisor to the Chief Exec and Leader CONSULTEES Cllr Simon Ring, Chief Executive, Chief Operating Officer, Section 151 Officer. Assistant Director Leisure, Leisure, Member Working Group WARDS AFFECTED North Lynn

KEY DECISION YES DECISION MAKER Recommendations to Council

IS THE REPORT Open OPEN OR EXEMPT

FINANCIAL IMPLICATIONS YES HR IMPLICATIONS NO POLICY IMPLICATIONS NO STATUTORY IMPLICATIONS YES RISK MANAGEMENT YES IMPLICATIONS ENVIRONMENTAL IMPLICATIONS NO EQUALITY IMPACT ASSESSMENT CONFIRM PRE-SCREEN COMLETED AND IF COMPLETED FULL EIA REQUIRED AND COMPLETED

SUMMARY OF REPORT The Council has completed a feasibility assessment into the future provision of swimming facilities to replace the existing St James Swimming Pool, which has now reached the end of its economic life.

Whilst the current facility continues to operate, increasing maintenance requirements, ageing infrastructure and rising operation costs mean it no longer represents a sustainable long-term asset.

The feasibility work has concluded that a standalone swimming pool, located at Lynnsport on the land currently occupied by the model railway represents the preferred option. This approach offers greater design flexibility, reduced construction risk and less disruption to existing leisure services during delivery and the opportunity to develop a modern, energy-efficient facility capable of meeting the needs of residents, schools, clubs and the wider community.

The report seeks Cabinet and Council approval to allocate £845,609.17 to progress the project through RIBA Stages 2 and 3, enabling the detailed design, technical investigations, planning work and cost planning required to develop the full business case. The outcome of this work will provide Cabinet and Council with the information required to determine whether the project should proceed to construction.

RECOMMENDATIONS Cabinet resolves to:

1. Recommend to Council to approve the allocation of a maximum of £845,609.17 to progress the project to build a standalone 8x25m swimming pool with learner pool and splash pad to RIBA Stages 2 and 3.

2. Delegate authority to the Chief Operating Officer in consultation with the Leader of the Council, the Strategic Advisor to the Chief Executive and Leader and the Portfolio Holder for Business to enter into a Leisure Access Agreement to progress the project to RIBA Stage 3.

3. Note that a future report will return with the full business case in March 2027 for a final decision on whether to proceed with the project.

Recommendation to Full Council:

1. Approve the allocation of a maximum of £845,609.17 from reserves to fund the new Lynnsport Project through to RIBA Stage 3.

2. Delegate authority to the Section 151 Officer, in consultation with the Leader of the Council and Portfolio Holder for Finance, to determine the appropriate reserve to fund the work.

REASON FOR DECISION To progress the project to build a new standalone swimming pool at Lynnsport to RIBA Stage 3 to provide the Council with the final design, project cost-certainty and business case to provide members with the information required to determine whether to proceed to the construction of the new pool.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Cabinet Report: updated after Cabinet to reflect amended recommendations to be presented to CouncilReport 317 KB DownloadRead as text
PDF
FUTURE SWIMMING PROVISION FOR WEST NORFOLKReport 557 KB Download

At this meeting

Whole meeting

Who was there

7 of 9 attended
AB
Councillor Alistair BealesChair, present
MD
Councillor Michael de WhalleyCommittee Member, present
SL
Councillor Susanne LinternCommittee Member, present
JM
Councillor Jim MoriartyCommittee Member, apologies
CM
Councillor Chris MorleyCommittee Member, present
JR
Councillor Josie RatcliffeCommittee Member, present
SR
Councillor Simon RingVice-Chair, apologies
JR
Councillor Jo RustCommittee Member, present
SS
Councillor Sandra SquireCommittee Member, present

More from King's Lynn and West Norfolk Cabinet

All decisions
MeetingDecisionOutcome
17 Nov 2026 ApologiesAn apology for absence was received from Councillor Moriarty. Decided Open
17 Nov 2026 MINUTESThe minutes from the previous meeting were agreed as a correct record. The minutes from the previous meeting were agr... Agreed Open
17 Nov 2026 Urgent businessNone. Decided Open
17 Nov 2026 Declarations of interestNone. Decided Open
17 Nov 2026 Chair's correspondenceNone. Decided Open