RESOLVED that the Director of Environmental Services and the Head of Legal Services be authorised to: 1. Issue Enforcement Notice(s) under S.172 of the Town and Country Planning Act 1990 (as amended). 2. Vary or withdraw such Notice(s) under S.173A. 3. In the event of non-compliance, to take legal action(s) under S.179 ( offence fir non-compliance) and/or direct action under S178 of the Act (to execute the works required by the Notice). Reason for Decision To take enforcement action against the breach of planning control and authorise the issuing of enforcement notices.
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
This report considers the merits of taking enforcement action in respect of the erection without planning permission of a detached building at 13 Pine Gardens Surbiton.
Recommendations
It is RECOMMENDED that the Director of Environmental Services and the Head of Legal Services be authorised to:
1. Issue Enforcement Notice(s) under S.172 of the Town and Country Planning Act 1990 (as amended);
2. Vary or withdraw such Notice(s) under S.173A; and
3. In the event of non-compliance, to take legal action(s) under S.179 ( offence fir non-compliance) and/or direct action under S178 of the Act (to execute the works required by the Notice)
Reason for recommendations
To consider the merits of taking enforcement action and authorise the issuing of enforcement notices.
SITE AND SURROUNDS
1. The application property is a semi-detached house with a long garden access to which is possible along the side of the house.
Background
2. An application for a Lawful Development Certificate proposing the erection of a detached building for use as a gym/games room ref: 05/ 16309/LDC was granted on 9 August 2005.
3. Following a complaint from a local resident an Investigations Officer visited the site on 27 February 2006 to examine a detached building that had been completed. It was noted that the building included a fully fitted kitchen and bathroom and had been provided with gas central heating. C2
4. The owner was advised of the need for planning permission by letter dated 16 March 2006 and was advised to remove the kitchen. This was not done.
5. A subsequent visit by the Investigations Officer on 8 September confirmed that that the building remained unaltered from the previous inspection on 27 February (save for the addition of a 1.1 metre diameter satellite dish on the ground adjoining the side wall of the outbuilding). It was noted that:
(i) Gas central heating was still connected (ii) Kitchen appliances remain (iii) Floor and wall cupboards remain (iv) The building contained a double settee, a table tennis table, exercise equipment and weights, a television, and two garden chairs
6. Class E of Part 1 to Schedule 2 of the Town and Country Planning (General Permitted Development Order) 1995 (GPDO) grants deemed planning permission for the following:
‘The provision within the curtilage of a dwelling house of any building or enclosure swimming or other pool required for a purpose incidental to the enjoyment of the dwelling house as such, or the maintenance improvement or other alteration of such a building or enclosure’.
7. Development is not permitted by Class E if it relates to the provision of a dwelling or if the height of the building does not exceed 4 metres in the case of a building with a ridged roof.
8. Class H of Part 1 to Schedule 2 of the GPDO grants deemed planning permission for the installation of a microwave antenna with a length not exceeding 1.0 metre on a dwelling house or within the curtilage of a dwelling house.
9. The application for a Certificate of Lawfulness proposed a detached building which was stated was to be used as a gym or playroom and toilet. This application was granted because it was concluded that the provision of this building would be permitted development within the terms of Class E (for use as a gym/games room and toilet). The building which has been erected differs from the building for which a Certificate of Lawfulness was granted in the following respects:
(i) The completed height of the building exceeds 4 metres. (ii) The building has been fully insulated with the provision of a cavity wall. (iii) The building has been provided with gas and electricity. (iv) The building contains central heating, a fully fitted kitchen and bathroom.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Surbiton Planning Sub-Committee at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.