RESOLVED that: 1. the cycle bridge scheme be approved, subject to planning permission being granted; 2. the approach routes be approved, subject to a suitable detailed design; 3. tenders be invited for the design and build of the cycle bridge; and 4. the Traffic Management Order (TMO) process be started. REASON FOR DECISION To improve the existing cycle route network in the borough and improve access for cyclists and pedestrians between Malden Manor Railway Station, local schools and surrounding residential areas.
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
As reported to the Maldens and Coombe and Surbiton Neighbourhood Committees in May 2008, a design study has been undertaken for the introduction of a new cycle bridge. The new bridge will sit alongside the existing pedestrian bridge over the Hogsmill River, serving the cycle route between Sheephouse Way (Malden Manor) and Knollmead (Tolworth). As the cycle route runs in both Neighbourhoods and the Neighbourhood boundary runs along the middle of the Hogsmill River, the approval of both Neighbourhood Committees is required to progress this scheme.
Recommendations
It is RECOMMENDED that:
1. the cycle bridge scheme (set out in paragraphs 8-10 of the report) be approved, subject to planning permission being granted;
2. the approach routes be approved (map ANNEX 1), subject to a suitable detailed design;
3. tenders be invited for the design and build of the cycle bridge; and
4. the Traffic Management Order (TMO) process be commenced.
Reason for recommendations
To support the key principles of the London Cycling Network plus and Cycling on Greenways policies, to improve the existing cycle route network in the borough, and improve access for cyclists and pedestrians between Malden Manor Railway Station, local schools and surrounding residential areas.
Background
1. There is an ongoing programme to improve the London Cycle Network (LCN+) and Cycling on Greenways (CoG) network within the borough. The Wimbledon Greenways route will provide several high quality cycle and pedestrian routes serving the 2012 London Olympics, specifically the All England Lawn Tennis Club venue (otherwise known as Wimbledon). The routes will also form a network of primarily ‘off road’ recreational routes in south west London through Richmond Park, Wimbledon Common and along the River Thames that will connect with existing cycle routes. 2. The route between Knollmead (Tolworth) and Sheephouse Way (Malden Manor) is shown on the RBK ‘Cycling in Kingston’ map as forming part of the LCN+. However, cycling is not permitted along it, as the existing pedestrian bridge and approach routes are narrow, and it remains a ‘cycle dismount’ section.
3. The route has the potential to provide a direct link between Tolworth and Malden Manor, avoiding a lengthy detour via busy roads for cyclists. The existing route is well used, particularly by school children attending Richard Challoner Boys School in Manor Drive; and improvements have been identified in the approved School Travel Plan.
4. A similar improvement scheme was successfully introduced in 2003 at the Surbiton Hill Park/Green Lane crossing point of the Hogsmill River, approximately 1km north of this site.
5. To date, the Feasibility Report, including an Ecological Survey has been completed. In addition, preliminary design of the approach routes has also been completed.
6. Public consultation was held in October 2008 for the proposed bridge and approach routes. No objections were received.
7. The Government Office for London approved the scheme (letter dated 3 December 2008) and the required area of open space has now been designated as part of the highway. As part of the bridge feasibility, the proposals were shared with the Environment Agency and the relevant consents were granted in February 2008. These remain valid for a period of three years.
PROPOSAL
8. It is proposed to provide a new bridge for cycles over the Hogsmill River immediately north west of the existing pedestrian footbridge.
9. The pedestrian and cycle approach routes either side of the bridges would be widened and resurfaced to provide segregated routes for cyclists and pedestrians (approximately 70m either side of the bridge). Existing ‘cyclists dismount’ signs would be removed and new direction signing would be installed to show the route forming part of the LCN+. The photos below show the existing approach routes which are to be widened.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Surbiton Neighbourhood Committee at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
Appointment of Chair and Vice-ChairRESOLVED that: 1. Councillor Tom Reeve be appointed Chair of the Committee for the Municipal Year 2026/27 until the f...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.