CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Royal Borough of Kingston upon Thames
Maldens and Coombe Neighbourhood, Wednesday 2 February 2011 at 7.32pm

PLANNED HIGHWAY MAINTENANCE 2011/2012

Decided Committee 1 paper

Maldens and Coombe Neighbourhood decided this item on Wednesday 2 February 2011. Below is the council's own wording, with the papers it was decided on.

Item55

Resolved

RESOLVED that the following works be undertaken as part of the 2011/12 maintenance programme (with a reserve scheme nominated as shown) with any surplus to be shared around the Neighbourhood: Location Details Estimate 1. Portland Avenue Whole length (Both Sides) – relay/renew slabs and reconstruct bitmac Verge £63,000 2. Coombe Road Acacia Grove to Cambridge Avenue – plane and resurface £33,000 3 Rodney Road Whole Length – plane and resurface £33,600 4. Revell Road Whole Length – plane and resurface £36,700 Reserve Scheme Queens Road Kingston Hill to Kingston Gate (Even Side)- relay/renew slabs and reconstruct bitmac Verge £16,000 Reason for the decision To determine the maintenance works programme for 2011/12 to enable the programme to be prepared, managed and implemented.
Word for word from the decision Kingston upon Thames published for this meeting. Source: moderngov.kingston.gov.uk

Follow this further

Built from Kingston upon Thames's papers

What the report saysPro

Report to Maldens and Coombe Neighbourhood

Recommendations

It is RECOMMENDED that the Committee determine, within budgetary limits, the works they wish to be to be undertaken as part of the 2011/12 maintenance programme and to nominate reserve schemes, as appropriate, from the prioritised lists in Annex 1.

Reason for recommendations

To determine the maintenance works programme for 2011/12 to enable the programme to be prepared, managed and implemented.

Background

2010/2011 Programme

1. The following schemes were undertaken, within the Neighbourhood, as part of the 2010/2011 planned maintenance programme:-

Carriageway

Priority Location Details 1. Mount Pleasant Rosemont to Dickerage – plane and resurface Road 2. Bowness Crescent Windermere to Keswick – plane and resurface 3. Park View Whole length – plane and resurface 4. C169 - Galsworthy A238 Coombe Road to A308 Kingston Hill Road (outside Kingston Hospital) – preparation base repairs – plane and resurface

No footway schemes were carried out in 2010/11. National Performance Indicators

2. Prior to 2008/09 the Council was obliged to publish Best Value Performance Indicators (BVPIs) for Principal (223), non-principal classified and unclassified Roads (224 a and b) and for Class 1 and 2 Footways (187). The prescribed method to use for the surveys and analysis was UKpms (United Kingdom pavement management system). BVPI 223, for Principal Road carriageways, was based upon the London-wide SCANNER survey commissioned by Transport for London (TfL) as part of the Road 2000 Project. BVPI 224 a and b and BVPI 187 UKpms surveys were commissioned and funded by the Borough.

3. BVPIs were then replaced by a reduced number of National Indicators (NIs) with only the condition indicators for Principal Road carriageways and Non-principal Classified Road carriageways required to be reported to Government. However, to monitor local performance and to assist in the Council’s asset management, UKpms surveys were and will continue to be undertaken for the whole network. The results of the surveys will be analysed and used to produce RBK Key Indicators to monitor the condition trends for both the Borough as a whole and for each Neighbourhood. The condition information is also required for the Council’s accounting procedures under new ‘whole life accounting’ guidance from CIPFA.

4. Graphs showing the Borough’s BVPI and National Indicators (NI) for the past years will be circulated separately.

5. The UKpms results for the Neighbourhood’s network (excluding Principal Roads) are: Carriageways = 33% Footways = 33%

The figures show the percentage of the network that is above the national threshold for further investigation/works, i.e. the lower the figure the better the condition.

Assessment Criteria for Prioritising Schemes

6. The basis for assessing the extent and priority for footway and carriageway schemes is the UKpms surveys and analysis of structural defects. However, this is not the only consideration that needs to be taken into account. Other risk factors that inform priorities are: • Volume of traffic • Type of Traffic • Reported accidents/personal injury claims • Volume of responsive repairs • Surface rather than structural condition • Maintenance/funding efficiency

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
PLANNED HIGHWAY MAINTENANCE 2011/2012Report 84 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

8 of 15 attended
MA
Councillor Mick AmsonMember, present
PC
Councillor Patrick CoddChair, present
DE
Councillor David EdwardsMember, apologies
DF
Councillor David FraserMember, present
TH
Councillor Trevor HeapMember, apologies
AH
Councillor Adrian HolderMember, present
EH
Councillor Eric HumphreyMember, present
SJ
Councillor Simon JamesMember, apologies
HJ
Councillor Howard JonesMember, present
DO
Councillor Derek OsbourneMember, apologies
PP
Councillor Priyen PatelMember, absent
KS
Councillor Ken SmithMember, present

All 15 on the meeting page

On this subject at Kingston upon Thames

Search all
  1. PLANNED HIGHWAY MAINTENANCE 2011/2012This decision
  2. Planned Highway Maintenance and Street Lighting Capital Programme 2026/27Approved
  3. Planned Highway Maintenance and Street Lighting Capital Programme 2026/27Noted
  4. Planned Highway Maintenance and Street Lighting Capital Programme 2025/26Approved
  5. Planned Highway Maintenance and Street Lighting Capital Programme 2024/25Approved
  6. Planned Highway Maintenance and Street Lighting Capital Programme 2023/24Approved

More from Kingston upon Thames Maldens and Coombe Neighbourhood

All decisions
MeetingDecisionOutcome
17 Mar 2022 Community GrantsResolved that – 1. that the application from the Zoological Society of London - Kingston HogWatch, for the sum of £3,... Approved Open
17 Mar 2022 Objection to traffic management order for the introduction of disabled bay on Gooding CloseResolved that – 1. the comments and objections received, summarised in paragraphs 4 and 5, and officer comments in pa... Noted Open
17 Mar 2022 Coombe Estate Highway Maintenance Estimates 22_23Resolved that the maintenance estimates for the Coombe Estate Roads, as set out in the Annex 1 to the agenda report, ... Approved Open
22 Sep 2021 Neighbourhood GrantsRESOLVED that the - Allocation of £2,916 of Neighbourhood Community Grant funding To Voices of Hope ( VoH ), a Kingst... Decided Open
24 Jun 2021 Appointment of the Chair and Vice-ChairRESOLVED that Councillor Simon Edwards be appointed Chair and Councillor Lesley Heap be appointed Vice-Chair for the ... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies