Kingston Town Neighbourhood Committee approved this item on Wednesday 9 February 2011. Below is the council's own wording, with the papers it was decided on.
RESOLVED that the following schemes be approved for implementation: Carriageway Priority Location Details Estimate Running Total 1. Latchmere Road Staunton Road to Latchmere Lane roundabout – plane and resurface £13,000 £130,700 2. Barnfield Avenue First 100m from both junctions with Tudor Drive – plane and resurface £25,300 £105,400 3. East Road Whole road – plane and resurface £25,500 £79,900 Footways Priority Location Details Estimate Running Total 1. Portsmouth Road East side from South Lane to o/s Wight House, where disturbed by tree roots - bitmac £5,200 £74,700 2. Dysart Avenue Both sides – relay/replace slabs from Dukes Ave up to borough boundary £41,500 £33,200 3. Queens Road Odd number side relay/replace slabs whole length £10,500 £22,700 The following schemes are placed in reserve to be implemented with the remaining £22,700 and additional funding should it become available. Carriageway Location Details Estimate St James Road Whole road – plane and resurface £28,500 Barnfield Avenue Rest of the road – plane and resurface £25,300 REASON FOR DECISION To determine the maintenance works programme for 2011/12.
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
It is RECOMMENDED that the Committee determine, within budgetary limits, the works they wish to be to be undertaken as part of the 2011/12 maintenance programme and to nominate reserve schemes, as appropriate, from the prioritised lists in Annex 1.
Reason for recommendations
To determine the maintenance works programme for 2011/12 to enable the programme to be prepared, managed and implemented.
Background
2010/2011 Programme
1. The following schemes were undertaken within the Neighbourhood as part of the 2010/2011 planned maintenance programme:-
Footway
Priority Location Details 1. Richmond Park Both sides – relay/replace slabs Road 2. Wood Street East side from o/s Bentalls entrance to Bus Terminus
Carriageway
Priority Location Details 1. Wyndham Road Resurface whole road 2. Albert Road Resurface whole road National Performance Indicators
2. Prior to 2008/09 the Council was obliged to publish Best Value Performance Indicators (BVPI’s) for Principal (223), Non-principal Classified and Unclassified Roads (224 a and b) and for Class 1 & 2 Footways (187). The prescribed method to use for the surveys and analysis was UKpms (United Kingdom pavement management system). BVPI 223, for Principal Road carriageways, was based upon the London-wide SCANNER survey commissioned by Transport for London (TfL) as part of the Road 2000 Project. BVPI 224 a & b and BVPI 187 UKpms surveys were commissioned and funded by the Borough.
3. BVPI’s were then replaced by a reduced number of National Indicators (NI’s) with only the condition indicators for Principal Road carriageways and Non-principal Classified Road carriageways required to be reported to Government. However, to monitor local performance and to assist in the Council’s asset management, UKpms surveys were and will continue to be undertaken for the whole network. The results of the surveys will be analysed and used to produce RBK Key Indicators to monitor the condition trends for both the Borough as a whole and for each Neighbourhood. The condition information is also required for the Council’s accounting procedures under new ‘whole life accounting’ guidance from the Chartered Institute of Public Finance and Accountancy (CIPFA).
4. The graphs in Annex 2 show the Borough’s BVPI and NI performance indicators for the past years
5. The UKpms results for the Neighbourhood’s network (excluding Principal Roads) are: Carriageways = 22% Footways = 34%
The figures show the percentage of the network that is above the national threshold for further investigation/works; i.e. the lower the figure the better the condition.
Assessment Criteria for Prioritising Schemes
6. The basis for assessing the extent and priority for footway and carriageway schemes is the UKpms surveys and analysis of structural defects. However, this is not the only consideration that needs to be taken into account. Other risk factors that inform priorities are: • Volume of traffic • Type of traffic • Reported accidents/personal injury claims • Volume of responsive repairs • Surface rather than structural condition • Maintenance/funding efficiency
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Kingston Town Neighbourhood Committee at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.