RESOLVED that: the proposed priority list of schemes to be undertaken as part of the 2013-14 Planned Highways Maintenance programme as shown in Annex of the report is approved. authority is delegated to the Service Manager for Highway Assets and Street Scene in consultation with the Chair and Vice-Chair to amend the programme in response to chaning circumstances during the course of the year. £10,00 is set aside from the Neighbourhood funding on an annual basis ton provide for tree renewal and or the removal of vacant tree pits which are no longer required.
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
1. the proposed priority list of schemes to be undertaken as part of the 2013-14 Planned Highways Maintenance programme as shown in Annex 2 is approved.
2. authority is delegated to the Service Manager for Highway Assets and Street Scene in consultation with Chair and the Vice-Chair to amend the programme in response to changing circumstances during the course of the year.
3. £10,000 is set aside from the neighbourhood funding on an annual basis to provide for tree renewal and or the removal of vacant tree pits which are no longer required (to allow 20 to 30 vacant sites to be dealt with each year) – ref para. 10 of the report.
Reason for recommendations
To enable the annual Planned Highways Maintenance works programme for 2013-14 to be prepared, managed and implemented.
Background
1. A local authority’s highway network is the most valuable tangible asset that it possesses and for which it is responsible. The main purpose of highway maintenance is to maintain the highway network to a condition that delivers sufficient capacity for the safe and convenient movement of people and goods. Highway maintenance work is also necessary to reduce the Highway Authority’s risk of exposure to claims for injury and damage caused by defects in the highway. Highway maintenance work is identified through a combination of structural assessment and visual inspection
2. Surveys in the borough and elsewhere have consistently shown the importance of the condition of the highway network to residents and businesses that have to use this network daily for all their business and leisure purposes. This results in a high demand for works to be carried out to repair and maintain the network.
3. In recent years, funding available for the whole of the borough has enabled 30 to 40 carriageways to be resurfaced and 10 to 20 footways to be reconstructed each year. However, there are over 1000 roads within the borough, and at this rate of repair/reconstruction, carriageways would only be resurfaced once every 25 years and footways reconstructed once every 50 years.
4. ANNEX 1 indicates the progress made with the carriageway and footway schemes in the 20012-13 Planned Highway Maintenance programme approved by the committee last year. The annex also shows the progress made with the Principal Roads carriageway resurfacing schemes that were funded by TfL as part of the Local Implementation Plan (LiP) settlement.
WORKS PROGRAMME DEVELOPMENT
5. The condition of the unclassified highway network is monitored by visual surveys that are undertaken by accredited surveyors who identify and record all visible defects following a national standard methodology called the UK Pavement Management System (UKPMS). This produces a Borough wide priority and also provides an over-all percentage of the network that is in critical need of structural repair for both the Borough as a whole and for each Neighbourhood. The classified road network is assessed for structural integrity using a specially adapted vehicle as well as being visually surveyed. The results from the 2012 surveys are indicated below:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Surbiton Neighbourhood Committee at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
Appointment of Chair and Vice-ChairRESOLVED that: 1. Councillor Tom Reeve be appointed Chair of the Committee for the Municipal Year 2026/27 until the f...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.